West Central Railway Tender

Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.

West Central Railway - WCR Tender

Works
Telecommunication Services
Ireps
Opening Date24 Jan 2025
Closing Date25 Feb 2025
Tender Amount₹ 2,10,01,404.77 
Notes
Download

Costs

Summary

Supply, Installation, Testing & Commissioning Of Indoor And Outdoor Signalling Equipment, Power Supply Equipment And Associated Works In Conection With The Provision Of Electronic Interlocking At , Turki -bagahai Road -hinauta Phase -ii (3 Station) In Connection With The Doubling Of Sta- Rewa Section.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Manufacture and supply of DUAL VDU counter table with fixing provision for 55" inch display on each side, with two numbers of block counter table . Table is as per RVNL drawing No RVNL/S&T/SC/14/A/2018 attached in annexure. INSPECTION BY CONSIGNEE

2

182728

365457

... More
Supply of Route, LED signal ligthing unit for Railway signalling, 110V AC, retrofitable in existing CLS housing and compatible with LED ECR as per RDSO Specn. Nos RDSO /SPN/153/2023 (Rev 5) or latest amendment. INSPECTION BY RDSO

50

6233

311655.5

... More
Supply of Shunt, LED signal ligthing unit for Railway signalling, 110V AC, retrofitable in existing CLS housing and compatible with LED ECR as per RDSO Specn. Nos RDSO /SPN/153/2023 (Rev 5) or latest amendment. INSPECTION BY RDSO

80

6233

498648.8

... More
Supply of Key Lock Relay AC immunized with different ward combinations ( Three extra set of same ward plates for Point Machines to be supplied with each group of points with each 8 relay). Siemens Make working on 24V DC 4F/4B (wards to be supplied with the consultation of Engineer in charge of work as per requirement of site and no additional cost will be paid for extra wards) The ward combination shall be A,B,C,D,E,F,G to Z) with three ward of each key. Before supply the Relay necessary approval to be taken from this office. INSPECTION BY CONSIGNEE 9

18

8555

153998.28

... More
Supply of two in two out (4 conductor) Knife edge disconnect terminal block set

-

-

755384

... More
Supply of cartridge fuse block made of PBT as per RDSO Drg. Nos. SA - 23748 Alt. 4 10 and Spec. Nos. IRS-S-75/2006 with latest ammendment. Fuse block shall be suitable for round head type fuses. INSPECTION :- (i)RDSO/RITES if value of item inwork more than 5 Lakhs (ii)Consignee subject toprocurement from RDSOapproved venders if value ofwhole item in work less than 5lakhs as per extant instructionsby Railway Board . Inspection Charges : Borne by Railways

1000

176

176510

... More
Installation, testing & commissioning of Remote Terminal Unit (RTU) complete along with accessories with contractors own wiring & fixing material at LC locations. This includes supply of 11 Remote Terminal Unit with 64 digital and 16 analog inputs as per RDSO spec. IRS -S-99/2006 amendment-3 as per annexure A-1 or latest amendment. This also includes loading of networking software and networking with data logger. The requisite communication cable/channel for networking will be arranged by Railway. INSPECTION BY CONSIGNEE

2

192280

384560

... More
Supply of LED type, Indication cum Operating Panel to be made of exchangeable Domino units each unit of size of 54mm x 34mm cover plates decipiciting the yard lay out ,unit signal , track circuit etc,of minimum size (12 x 8). Siemens type Dominos complete, wired with full components. The panel should have polycarbonate sheet cover on the top to avoid damages while in service. Each of the working domino unit should have all terminals. Total nos of domino (12X 8)= 96 Nos. size 54mm x 34mm .The length approximately 730mmX450mm.The height is approximately 910mm(rear side) and 820mm (front side) .The panel will be LED illuminated (2 Nos of magnet , 2 nos of bulb extractor & 10 % of spares of all LED's of each colour to be supplied along with panel. INSPECTION BY CONSIGNEE

2

34868

69736.82

... More
Supply of Domino units for deltron pannel with cover plates as per approved panel diagram, each of size 54 x 34 mm completely wired up . Each domino unit should have all the 15 contact terminals wired up. INSPECTION BY CONSIGNEE 14

30

1205

36154.8

... More
Supply of Veeder Counter for panel 24 V DC,23.3 m A INSPECTION BY CONSIGNEE 15

2

801

1603.06

... More
Indication lamp for indication panel.( Double LED Type) INSPECTION BY CONSIGNEE

-

-

3950.1

... More
Supply of PVC insulated flexible wire 16/ 0.2 mm dia as per RDSO spec. Nos. IRS:S- 76/89 with latest amendments of various colours INSPECTION BY CONSIGNEE

5

9098

45494.95

... More
Modification/Alteration/augmentation of existing electronic interlocking(EI) system as per RDSO SPN No RDSO/SPN/192/2005 as per approved signalling plans and selection table/Locking table of stations (for phased doubling,LC removal etc.) technical specifications & special conditions of 1 contract. This includes supplies necessary for alteration/modification in VDU's software.This also includes supplies necessary for earthing the modified/altered/augmented EI those needed for re- wiring external data logger and fuse alarm system. This item also includes preparation of Selection Table,Locking Table,Control Panel and Route section plan,wiring diagram and other diagrams(other technical documents if any) based on Signalling plan supplied by railway.(completion Documents as per special condition of contract) this item for Baghai and Hinauta station.EI=Per EI

2

2804708

5609416

... More
Training (at site and/or work) of Engineers/Officers at contractors own lodging and boarding 3

8

20961

167693.44

... More
Commissioning of Electronic Interlocking system 4

3

22429

67289.04

... More
Supply and fixing of PVC Flooring thickness 2 mm colour Ocean Blue. 5

200

712

142536

... More
Supply and fixing of Rubber matting thickness 25 mm

60

2259

135588

... More
Installation of Relay Rack Assembly including IDF pillars complete with wall supports, 6 scaffolding, ladders, runway for cables, Relay/Relay group base plates, fixing of Tag blocks etc. The work shall be done as per approved plan, extant practice on W.C. Railway & the instructions of Rly. engineer at site.

3

1810

5430.96

... More
Installation of Cable Termination Racks Assembly complete including wall supports, 7 scaffolding, 8 way/ARA terminal/Wago terminal & other necessary accessories etc. The work shall be done as per approved plan, extant practice on W. C. Railways & the instruction of Rly. engineer at site.

3

1382

4147.2

... More
Termination of cable cores on ARA terminal/8-way/Fuse Block/Wago/Phoenix terminals on the cable termination rack. This includes all associated works of pulling out the cable from 8 underground, dressing of cable, making wiring tree with contractor lacing & threading material etc. This includes soldering of armour tree/ring of cables and connecting to Earth Bus bar. The work shall be done as per approved plan, extant practice on West Central Railways Railway & the instruction of Rly engineer at site.

7000

11

77000

... More
Charging of Low Maintenance Lead Acid Batteries with contractors own battery grade sulphuric acid and distilled water with minimum two charge - discharge cycles, installation of charged batteries in groups & their connection & wiring. The work shall be done as per extant practice on W.C. Rly & the instruction of site engineer. The sulphuric acid & distilled water to be used for charging shall conform to specification IS 266-1961 & IS 1070-1960 respectively.Ampere Hour= 100 Ampere Hour

-

-

9

... More
Installation, Wiring and testing from Integrated Power Supply System including Connection to change-over unit. This includes transportation, loading and unloading of IPS system complete and batteries from depot to the site of installation. The all supplies shall be wired right from IPS to power supply distribution board / rack with contractor's own wiring materials except 25sq mm wire (which is included in supply of IPS). The wiring shall be done with single core multistrand flexible 10 copper wire of 10 Sq mm, 16 Sq mm, 25 sq mm etc. as per IS:694 of 1990 or latest as per RDSO recommendation of IPS installation. This also includes instaliation of CT rack in IPS Room,fixing ofARA/Wago terminals. with connections suitable for 32 A. The 25 sq mm wire shall be used for connecting Batteries from IPS, 16 sq. mm power cable is to be used for wiring of 110V DC, 110V AC & 60V DC (internal) and for balance power supply 10 sq, mm power cable is to be used. All connectors, wiring material, ladders, DWC pipes etc as per site requirement are to be arranged by contractor as per instructions of railway engineer at site. This also includes fixing and wiring of one exhaust fan in the IPS room. Fan will be supplied by the railway.

2

48451

96902.28

... More
Installation/ Shifting of control and other communication equipments like control phone / magneto phone / Auto Phone / DTMF,VHF Set,PA system etc. in Panel Room as per instructions of engineer incharge.

2

7355

14710.46

... More
Installation, wiring/Alteration & Testing of Control cum Indication Panel / operating 12 panel / indication panel/Cabinet for housing dual VDU as the case may be, UFSBI, KLR boxes, Group phone, ELD, Fuse indication system & test board etc.This includes laying & termination of cable, if any from Panel Room To Relay Room in GI/HDPE pipe.

2

15522

31044.62

... More
Fixing of Q series relay base plate/ Metal to Metal relay mini group and major group base plates, laying, lacing, dressing & packeting of 60/40/24 core PVC indoor cable and termination of 60/40/24 core cable on tag block & base plates & its soldering. Wiring of circuits to be done as per the approved diagram based on relay interlocking system using metal to metal/metal to carbon type relays and soldering after testing. This also includes fuse wiring, function wiring (Including interconnection between relay rack, & CT rack), power supply wiring (power wiring from power supply distribution board / rack to relay racks and cable termination racks with provision of wiring of ring connection with the help of contractors own single core flexible multistrand copper wire of 16 sq mm 13 and 10 sq mm as per RDSO specification no. IRS-S 76/89 with latest amendment. 16 sq mm wire for All 110V DC, 110V AC & 60V DC internal supply and 10 sq mm wire for balance supply is to be used) Materials required like jumper wire of 0.6 mm, 1.0 mm, 16/0.02 multistrand flexible etc, resin core, solder wire, lacing thread, adhesive tapes resistance, condensers, diodes, lugs etc of various ratings and capacity as per site requirement to arranged by the contractor free of cost and used after approval of Rly engineer at site. The jumper wire of 0.6mm, 1mm , flexible wire of 16/0.02, power wire of 16 & 10 sqmm equired for carrying out the indoor work shall be supplied by contractor as per RDSO specification no. IRS-S 76/89 with latest amendment after RDSO inspection. The quantity of jumper wire should be assessed jointly with the engineer in charge in beginning itself.). The work shall be done as per approved plan extant practice on W. C. Rly & the instruction of Rly engineer at site. Required quantity of 60/40/24 core PVC indoor cables will be supplied by Railway.

6

16478

98870.4

... More
Installation of Q series relay, Metal to Metal relay/relay groups. Energisation of the system, making the panel through, functional test as per control table with contractor's own mock 14 panel, break test if applicable to be done in presence of Rly. Engineers. This will include wiring alterations required if any at that stage, preparation and submission of wire count detail register etc. The work shall be done as per extant practice on W.C.Rly & the instruction of Rly engineer at site. All type of resistances, capacitors etc required for commissioning have to be provided by the contractor free of cost.

6

1854

11124.6

... More
Lettering & Numbering of detail and description writing of particulars of terminations & equipments on relay rack, relays, cable termination rack, battery & power equipments, IPS, operating 15 panel, axle counter etc constituting entire system with contractor's own paint and writing material ("Asian" make or similar enamel paints or similar paint only to be used). This includes supply and fixing of teflon strips 3mm thick and 25 mm wide for each row of relays and cable terminations. The work shall be done as per extant practice on W.C.Rly & instruction of Rly engineer at site.

2

6506

13013.6

... More
Preparation & submission of cable route plan of main & tail cables, cable corage plan, 16 location particulars, CT rack particulars, meggering report, earth resistance particulars, traction bonding diagram and any other drawing / particular required in Auto CAD in minimum A3 size for station including LC gate if any. Each sheet should have a block for signature of Railway Officials as well as block for signature of the firm, where signature shall be put up by the authorized signatory of the firm. The name of the work as given by the Railways shall be written on every sheet under the WORK column. One complete set of tracings and four sets of copies of complete above detailed particulars / drawings along with one Pen Drive to be supplied by the contractor in thick plastic folder.

3

25823

77469

... More
Excavation, casting and plastering (above ground level) of main signal foundation as 17 per Drg.No.WCR/S&T/SIG/01 with contractor's own materials including cement and galvanised anchor bolts of standard size. The hole for cable entry should be kept as per site requirement and instruction of Rly engineer at site. The required scaffolding Ferma etc for casting of foundation will have to be brought by the contractor at his own cost.

35

9896

346386.95

... More
Excavation, casting and plastering (above ground level) of Shunt Signal foundation as 18 per Drg.No.WCR/S&T/SIG/01 with Contractor's own materials including Cement and galvanised Anchor Bolts of Standard Size. The hole for cable entry should be kept as per site requirement and instruction of Rly engineer at site. The required scaffolding, Ferma etc for casting of foundation will have to be brought by the Contractor at his own cost.

28

2577

72163.28

... More
Erection of CLS Post with Surface base and signal unit on top or on OFF set Bracket, fixing of front and back staging, ladder and guards, signal name plates and A/AG/C/P/G marker board , 19 protective screen, blanking of ladder (0.6mm MS sheet) if any with contractors own brackets and fixing materials. This also includes erection of auxiliary signals like calling on, shunt signal if any. The work shall be done as per instructions of Rly engineer at site. Wooden white cross-arms (1000x100 mm) to be provided by the contractor till the signals are commissioned with contractor's own material.

35

3771

131996.55

... More
Erection of shunt signal with Surface Base, Post, Signal unit and fixing of No. plates. 20 The work shall be done as per instructions of Rly engineer at site. Wooden white cross-arms (1000x100 mm) to be provided by the contractor till the signals are commissioned with contractor's own material.

28

458

12838.28

... More
Fixing of Jn. Route Indication 1-Way/2-Way/3-Way/multi type on the top of the signal post.

8

715

5727.2

... More
Fixing of stop board ,Block section limit board and good warning board with contactors own materials.The work shall be done as per the instruction of Rly engineer at site.

14

5384

75376.56

... More
Termination of tail cable on Shunt signal units and wiring with contractor own material, 23 fixing of LED signal unit etc. Flexible Single core copper wire 2.5 sq.mm (50/0.25) conforming to IS- 694:1990 copper wire as per Rly. Standard and lugs etc. will be supplied by the contractor. This includes insertion of tail cables from ground to signal unit. The work shall be done as per instruction of Rly engineer at site.

35

1163

40739.65

... More
Termination of tail cable on Shunt signal units and wiring with contractor own material, 24 fixing of LED signal unit etc. Flexible Single core copper wire 2.5 sq.mm (50/0.25) conforming to IS- 694:1990 copper wire as per Rly. Standard and lugs etc. will be supplied by the contractor. This includes insertion of tail cables from ground to signal unit. The work shall be done as per instruction of Rly engineer at site.

28

339

9504.6

... More
Excavation, casting and plastering (above ground level) of Apparatus case foundation 25 with contractors own Metal Sheet frame, cement, anchor bolts with nuts & washers and other materials. The items also include additional earth work if required as per instruction of Rly. Engineer at site.

-

-

538555.65

... More
Erection of apparatus cases.This includes filling of location foundation with river bed sand and plastering on top of the sand.

-

-

51885.15

... More
Fabrication and fixing of phenolic board in location box by providing all fixtures and 27 insulators as per Railway Drawing including fixing of PVC coated string rods at the back side for cable support with contractor's own materials. Lasing and dressing of cables/wires terminated with contractors own supply of lasing thread. The work shall be done as per instructions of Rly engineer at site.

-

-

66642.75

... More
Installation of Eqpt. (Relays, resistance, chargers & batteries etc.) & wiring of the same in apparatus cases as per location & circuit diagrams with contractor's own PVC wires and wiring 28 material. The work shall be done as per instruction of Rly engineer at site and approval of wiring material ( from RDSO approved firms) being used and extant practice in W.C. Rly). Wiring of relays should be with 16/0.2mm wire and all other equipments wiring by 2.5 sq mm multi strand wire of IS 694 of 1990 or latest.

-

-

168692.8

... More
Fixing of ARA /WAGO Terminals and fuse blocks with provision of holes on hylem sheets and fixing by galvanised nuts & bolts.This includes provision of two additional holes on the hylam board on either side for cable conductor entry. The work shall be done as per Engg. at site.

7000

14

102690

... More
Termination of cable cores on ARA/ disconnecting type terminal, fuse blocks, 8 way 30 terminals block in the apparatus cases. This includes all associated works of pulling out the cable from underground, dressing of cable, making wiring tree etc. This includes soldering of armour tree/ring of cables and connecting to copper plate through GI wire bus bar in location boxes. The work shall be done as per location plans and instructions of Rly engineer at site.

15000

165000

165000

... More
Excavation and Fixing of earth electrode assembly including earth wire connected through GI wire 8 SWG supported on M.S.flat to earth electrode for signalling equipment .

100

2843

284362

... More
Erection, Fitting and Rail connection of Track Lead Junction Box with contractor's fixing material and jacketed wire rope including 7mm single groove galvanized channel pin for track lead connection including two vertical angle of size 40 x 40 x 5 mm 1200 mm length. This will include 32 drilling of holes in rails for track lead connections as per instructions of Rly engineer at site.PVC jacketed galvanized steel wire ropes of 6mm dia (7 x 19 strands) sheathed with PVC of 2mm wall thickness and over all thickness of 10mm for connection between the TLJB and the rails are to be used and to be supplied by the contractor. PVC sheath should be made of type 6 compound as per IS 5831 of 1970. Double wire ropes are to be connected between each rail and TLJB.

600

1240

744210

... More
Provision of bonding with contractor's materials including 7mm single groove 33 galvanized channel pin. This will include drilling of 7.2 mm dia holes in rails (4 Nos) and provision of two jumpers for each bond, clipping of bonds etc. with contractors own materials and tools as per instruction of Rly engineer at site.GI wires of 4mm dia (8 SWG) are to be used for jumpers across fish plates which should be supplied by the contractor free of cost.

1500

164

246135

... More
Fixing of point machine on newly laid turnout on Wooden/MBC/Steel sleepers & fixing of ground connections. Adjustment and testing with crank handle operations. This will include fixing of bend pipes with welded frame for cable entry to machine. This will also includes necessary adjustment and smithy work, drilling of Holes to tongue rails, gauge plate & steel sleeper, fitting of insulation for 34 tongue attachment, gauge plate & William stretcher. This also includes cable entry to the point machine and termination of tail cable in point machine on ARA terminals and wiring of point machine (Necessary wiring modification for independent detection) using 2.5 sq mm insulated copper wire as per IS 696 of 1990 with suitable lugs. ARA terminals are to be suitably fixed on channels inside point machine . Supply & filling of SAE 30 lubricating oil (500ml approx). The work shall be done as per extant practice on W.C. Rly & the instruction of Rly engineer at site. ARA terminals will be supplied by Railway.

11

3391

37304.19

... More
Removal of existing mechanical /Electrical motor point fittings and FPL assembly from points, fixing of point machine, ground connection, and adjustment and testing with crank handle for 35 operation. Removal of ground connection, point machine after testing (duly numbered) and refixing of mechanical point fittings. This includes supply of all fixing material, necessary fitting & adjustment to make the mechanically operated points functional again. (Ordinary Layout/Derail switch/Double slip/Single slip). The work shall be done as per extant practice on W.C. Rly & the instruction of Rly engineer at site.

8

6710

53687.44

... More
Fixing/refixing of electric point machine, ground connections during phase working (NI / Pre NI), after removing the existing fittings if any, adjustment and testing with crank handle operation. This will include fixing of bend pipes with welded frame for cable entry to machine. This will also includes necessary adjustment and smithy work, drilling of Holes to tongue rails, gauge plate & 36 steel sleeper, fitting of insulation for tongue attachment, gauge plate & William stretcher. This alsoincludes cable entry to the point machine and termination of tail cable in point machine on ARA terminals and wiring of point machine (Necessary wiring modification for independent detection) using 2.5 sq mm insulated copper wire as per IS 696 of 1990 with suitable lugs. ARA terminals are to be suitably fixed on channels inside point machine . Supply & filling of SAE 30 lubricating oil (500ml approx). The work shall be done as per extant practice on W.C. Rly & the instruction of Rly engineer at site.

26

4226

109885.36

... More
Excavation of trench as per cable route plan, 1.2 mtr deep, 300mm wide at the bottom along main line in normal soil, This work includes covering of cable laid in trenches by loose soil for a layer of 50 mm thickness approximately before covering by shahabad stone/bricks, clearing of route, 37 bushes etc and refilling of the trench by excavated soil and ramming after laying of the required quantity of cables as per instructions of Engineer at site. If it is not possible to reach the required depth at any location, then the contractor shall obtain prior approval of Engineer-in-charge before commencement of cable laying process and only then shall the proportionate payment be made to the contractor.

7

77383

541682.4

... More
Excavation of trench as per cable route plan, 1 mtr deep, 300mm wide at the bottom along main line in hard soil / murum, This work includes covering of cable laid in trenches by loose soil for a layer of 50 mm thickness approximately before covering by Shahabad stone/bricks, clearing of 38 route, bushes etc and refilling of the trench by excavated soil and ramming after laying of the required quantity of cables as per instructions of Engineer at site. If it is not possible to reach the required depth at any location, then the contractor shall obtain prior approval of Engineer-in-charge before commencement of cable laying process and only then shall the proportionate payment be made to the contractor.

2500

114

285050

... More
Fixing of GI pipes for crossing the culverts, stone bridges etc. and concreting the ends with brick masonry at both ends as per the instructions of Rly. Engineer at site with Contractor's 39 materials. The brick masonry at the ends shall be done with well-burnt bricks & cement mixture of 1:3 ratios. (Supply of GI pipes is not covered in this item). 3 perforation of 0.6mm dia per meter shall be made on the GI pipe as per the instructions of Engineer at site. This includes fixing with contractors own MS Chanel, clamps of proper size etc as per instructions of engineer at site.

150

116

17529

... More
Excavation of cable trench 1m deep and 300mm wide across the track, for track crossing and refilling after laying of DWC/RCC/GI pipes. The work shall be done as per extant practice on W.C. Rly & instruction of Rly engineer at site.

400

142

57108

... More
Cutting of all types of platforms, trenching & excavation to depth of 300 mm x 300mm 41 wide approx. and refilling after lying of GI pipes and repairing the platform to restore to original condition. The work shall be done as per extant practice on W.C.Rly and as per instructions of Rly. Engineer at site.

300

302

90645

... More
Cutting of all types of Roads preparatory to trenching & excavation to depth of 1 Mtr X 42 300 mm wide approximately and refilling, after laying of GI pipe and to restore the road to original condition. The work shall be done as per extant practice on W.C.Rly & instruction of Rly engineer at site.

120

302

36258

... More
Preparation of Cable way 150 mm wide at the bottom and 300 mm deep in rocky area 43 & refilling the same (after cable-laying in DWC pipe) with concrete mixture of proportion 1:3:6 and grouting the ends at either side of the rocky portion using concrete mixture with Contractor's own cement & other materials.

1200

786

943704

... More
Supply & laying of well burnt bricks of size 225x100x75mm inside the trench (with the brick length being perpendicular to cable route) after laying of cable in station area from Outermost to 44 Outermost signal or at any other location as per instruction of Site Engineer. Note: - Size of bricks to be got approved by Site Engineer. In case brick size is in variance with the size given in the tender schedule then proportionate payment on volumetric basis shall be paid to contractor subject to a maximum limit of schedule rate. 45

70000

5

352800

... More
Laying of signalling/Power/Telecom cable of various cores/sizes in trenches.

70

8699

608976.9

... More
Laying of GI/DWC/RCC pipes along with collars in trenches at places wherever required as per the instruction of the engineer at site.

2000

94

188360

... More
Placing and securing of cable route marker in trenches at the specified interval and at diversion joint etc .along the cable route The work shall be done as per extant practice on WCR & the instruction of Rly engineer at site.

250

19

4985

... More
Lettering numbering of signals, point machine, track lead junction boxes, block joint, appratas cases etc ( each item to be taken as one unit )

900

72

65061

... More
Lettering numbering termination particulars, equipments names etc legibly and neatly inside location boxes.

-

-

53306.88

... More
Releasing of Indoor & outdoor equipments,Lever frames, Relay rack,CTR old location boxes, signal posts, point machines, equipments inside the location boxes, Axle counter DP's lifting 51 barriers, rodding run, wire run, cranks, compensators, relays & relay racks, power instruments etc .as applicable including breaking of foundations etc. as per the instructions of Railway Engineer at site and theirtransportation to SSE in charge at the nominated depots with contractors own conveyance and expense.

2

81612

163225.06

... More
Installation of maintenance free earth a) Digging/Auguring/Boring of single earth pit of 100mm to 125mm dia to the depth of approximate 2.8M b) Insertion of 3 Mtr electrode and penetrating it at least 0.2 Mtr. By pushing gently with sledge hammer where the neutral soil is assumed.c) Filling of earth pit with earth enhancement compound (EEC) in slurry form and back filling. d) Carrying out exothermic weld connection of single earth electrode to a copper tape of 150 x 52 25 x 6 mm e) Carrying out exothermal weld connection on the copper tape of 150 x 25 x 6 mm on earth electrode for connecting two 35 Sq.mm cable for redundancy f) The exothermal welding material for bonding the earth system shall be procured from RDSO approved firms which include graphite moulds, clamps, weld metal powder. g) 300 mm X 300 mm X 300 mm(inside dimension) concrete earth pit with a concrete lid approximately 50 mm thick with pulling hooks shall be provided to cover the pit. Back side of the cover will be painted in black and date of testing and average earth resistance value shall be written. 53

10

12043

120437.8

... More
Installation, wiring & testing of Single Line/ Double Line block instruments.

3

10199

30598.8

... More
Installation, testing, wiring and commissioning of High Availability SSDAC by 54 OEM/authorised representative of OEM as per guidelines issued by RDSO, wiring discipline should be asper RDSO TAN No. STS/E/TAN/6001 version 1.0 or latest.The pre-commissioning checklist issued by OEM and jointly signed by OEM & Railway. Before commissioning of HASSDAC, OEM should submit site installation certificate.It also include programming of existing MSDAC if required.

6

79383

476300.58

... More
All works pertaining to horizontal directional drilling (HDD)/boring and trenchless cabling. It includes supply , transportation and insertion of self lubricated HDPE pipe and laying of cable in boring under the track/road/ plateform/ circulating area by using different size of pipes 55 depending on the total number of cables will be crossed. The depth of horizontal boring should be minimum 1 meter upto 3.0 meter from rail flange/road level/ ground level as per direction of Engineer in-charge. This item will be used for track crossing of running line , road croosing and circulating area. (i) By using self lubricated HDPE pipe of 120mm outer dia and 103.5mm inner dia in the bore and laying of cable in the bore under the track/road/ circulating area.

800

1216

973536

... More
Design and supply of detailed signalling circuits for station this includes design alteration and supply of detailed signalling circuits including panel diagram,route section plan, selection table,fuse & negative tag.Analysis,contact analysis, relay rack arrengement and wire count sheets etc.at both adjacent station in A3 size.Completion circuit shall be plotted in autocad.The contractor shall initially supply 2 sets of circuits duly signed by the circuit designer having substantial 56 experience on design side for making such circuits,complete for approval of railways. Railways will return one set of circuit to the contractor duly approved with alteration/corrections, if any.The contractor shall incorporate Railway's alterations/corrections in the original tracings & Pen Drive without any deviation and submit two coppies of the modified circuits.Original tracings so modified & final Pen Drive complete in all respects along with 4 sets of final approved circuits( out of which one set shall be supplied in transparent polythene cover).Relevant existing circuit diagram sheets of adjacent station for reference will be made available by the Railway's.

1

90239

90239.76

... More
Installation, testing and commissioning of electrically operated lifting barrier, complete 58 with Casting of cement concrete foundation for pedestal and boom rest post, cabling power supply connection & wiring with complete outdoor work. The work shall be done as per approved plan, extant practice on W.C. Railway & the instructions of Rly engineer at site.

2

11109

22218.52

... More
Installation/modification of Central Evaluator of Axle Counter, wiring from the CT rack 59 to the Central Evaluator, installation and wiring the reset box and wiring the power supply to the Central Evaluator including the supply of shielded cable of required conductor size as applicable with other accessories. Earthing as per manufacturers specification with their own material.

1

20058

20058.3

... More
Provision of screen on signals when they fall with in two meter fron the conductor by 60 expanding metal size 20mm X 60mm (strand 3.25 mm wide and 1.6 mm thick) as per instruction at site by Engineer incgarge. This includes supply of all material including earth electrode and earthing arrangement.

8

8275

66200.72

... More
Shifting of existing apparatus case with foundation by crane or by other means upto 2- 62 20mtr decided as per site engineer.(During shifting of location boxes signalling gears disconnection will be taken by railway representative).this includes excavation of earth around location box, all type of labour charges and filling of locations foundation with river bed sand plastering on top of the sand. Location Box = Per Location

16

10289

164624.32

... More
Details testing of wiring including continuity testing, functional testing, selection table, 64 locking table testing with simulation panel. This item include wiring of simulation panelas per standard practice. Erection & wiring of simulation panel shall be with contactor own material. Signal lamp required for simulation panel will be supplied by contactor. Contactor will arrange technical man power, wireman and supervisor to facilitate this testing by Railway.

1

128002

128002.06

... More
Shifting & adjustment of existing Multi section digital axle counter.

-

-

66

... More
Installation/modification of track device (double rail contact of digital axle counter) includes digging of trench, track crossing, laying of Double walled antirodent corrugated pipe from 67 track device to location box / mashroom / EJB and making its terminations. Fixing of deflector plates. (Double walled antirodent corrugated pipe made up of High Density Polyethylene of required dia and all other accessories as per site requirement to be supplied by the firm). Casting of foundation for track side housing & erection of track side housing. Installation & wiring of EJB/Track side electronics inside the track side housing including supply of wires and other accessories. 68

10

16173

161732.9

... More
Fabrication, supply, transport erection at site sliding type (Boom)

-

-

469280.48



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.