Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
West Central Railway - WCR Tender
Civil And Construction
Civil Works Others
Ireps
Opening Date5 Dec 2024
Closing Date30 Dec 2024
Tender Amount₹ 35,46,842.52
Costs
EMD
₹ 71,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Modification To Existing Ohe Including Design, Supply , Dismantling, Erection, Testing And Commissioning Of Ohe And Portal
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
BPL-LC-T-652-DY.CEE-W-BPL-ELECTRICAL/WEST CENTRAL RLYTender No
BPL-LC-T-652Tender Authority
West Central Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
31(a) Modification to erected equipment :Transfer of equipment from one mast or support to another. 5
-
-
87800
... More
31(j) Modification to erected equipment :Dismantling of Portal/TTC boom. 6
-
-
15581.34
... More
31(k) Modification to erected equipment :Dismantling of Guy Rod with Termination. 7
-
-
1949.54
... More
31(l) Modification to erected equipment :Dismantling of Mast/Upright by gas cutting. 8
-
-
7866.64
... More
31(n) Modification to erected equipment :Dismantling of Post/Pedestal Insulator.
-
-
2586
... More
2(b) Concrete for foundation and plinth: In other than hard soil and rock.
-
-
462200
... More
3(b)(i) Supply of fabricated and galvanized structures (O,N & R type portals) with all necessary components other than masts.
-
-
1192200
... More
3(c) Supply only of fabricated steel other than masts. 4
-
-
688080
... More
3e)(i) Supply and erection of Guy rod assembly . 5
-
-
35508
... More
4a)(i) Supply without insulator and erection of Single bracket assembly. 6
-
-
320020
... More
8(b)(ii)Supply without Insulator and erection of materials for termination of Double conductor. 7
-
-
12082
... More
9a) Supply without Insulator and erection of anticreep with galvanized steel wire. 8
-
-
31303
... More
16(a)(i) Supply & erection of structure Bond.
-
-
17110
... More
15(a)(ii) Supply & erection of 50sq.mm small copper jumpers.
-
-
9205
... More
4(ax)(i)Supply of Stay Arm Porcelain (CD-1050 mm) Insulators for item 4a)i & 4a)iii of Schedule-3
-
-
59900
... More
4(ax)(iv) Supply of bracket Porcelain(CD-1050 mm) Insulators for item 4a)i & 4a)iii of Schedule-3
-
-
51560
... More
8(bx)(i)Supply of 9-Tonne Porcelain insulators (CD-1050 mm) for item 8b)I , 8b)ii , 8b)iii , 8b)iv & 13 of Schedule-3
-
-
3781
... More
9(ax)(i)Supply of 9-Tonne Porcelain insulators (CD-1050 mm) for Item 9a,9b, 9c, 9d ,of Schedule-1
-
-
15122
... More
11(ax)(i)Supply of 9-Tonne Porcelain insulators (CD-1050 mm) for Item no. 11a)i , & 11a)ii of Schedule-1 6
-
-
41591
... More
11(bx) Supply of 25 KV Post Insulator for Item no.11b) of Schedule-1
-
-
45630
... More
5) Breaking of existing concrete foundation and concrete at other places and resurfacing. 2
-
-
8260
... More
6) Provision of new dropper and readjustment. 3
-
-
27582
... More
12) Transportation charges for OHE material 4
-
-
1300
... More
13) 100% Extra on erection rates for work done under power block for schedule items.
-
-
250000
... More
14) Erection of portal booms/fabricated portal booms etc. by Road crane arranged by contractor at his own cost.
-
-
31252.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%