West Central Railway Tender

Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.

West Central Railway - WCR Tender

Works
Electrical and Electronics
Electrical Works
Ireps
Opening Date24 Dec 2024
Closing Date15 Jan 2025
Tender Amount₹ 76,75,092.35 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply and erection of single bracket assembly suitable for Conventional type OHE 5

-

-

126364

... More
Transfer of equipment from one mast or support to another 6

-

-

38921.12

... More
Supply & erection of structure bond 7

-

-

3679.92

... More
Supply & erection of single earth electrod (earthing station) 8

-

-

9743.96

... More
Supply & erection of earth bus (MS flat 50x6mm) 9

-

-

7104.6

... More
Dismantling of structures by cutting. 10

-

-

32089.68

... More
Dismentaling of bracket. 11

-

-

4526.96

... More
Slewing of overhead equipment.

-

-

83640

... More
Supply and erection of caution board, stop board and other similar board. 14

-

-

7177.64

... More
Erection of false contact wire including all accessories. 15

-

-

8255.4

... More
Provision of Protective screens at on ROB.

14

24498

342980.54

... More
Handling,loading,unloading and transportation of new/released OHE structure from different railway site to concerned TRD depot .

2

2678

5356.98

... More
Excavation & casting of foundation including reinforcement concrete in other than hard soil and rocky soil.

16

5928

94857.28

... More
Supply of steel structure galvanised including Traction masts, main masts , fabricated steel other than mast, SPS etc. for OHE.

2

121207

242414.76

... More
Manual erection of steel structure galvanised including Traction masts, main masts , fabricated steel other than mast, SPS etc. for OHE 4

-

-

21760.52

... More
Supply and erection of single bracket assembly. 5

-

-

126364

... More
Transfer of equipment from one mast or support to another. 6

-

-

38921.12

... More
Supply and Erection of structure bonds. 7

-

-

9199.8

... More
Supply & erection of single earth electrod (earthing station) 8

-

-

9743.96

... More
Supply & erection of earth bus (MS flat 50x6mm) 9

-

-

7104.6

... More
Dismantling of structures by cutting. 10

-

-

32089.68

... More
Dismentaling of bracket. 11

-

-

4526.96

... More
Slewing of overhead equipment.

-

-

100368

... More
New dropper and re-adjustment of dropper with all associated components & adjustment of OHE to get adequate height. 13

-

-

64188.6

... More
Supply and erection of caution board, stop board and other similar board. 14

-

-

10766.46

... More
Supply & Erection of false contact wire including all accessories. 15

-

-

8255.4

... More
Provision of Protective screens at on ROB.

12

24498

293983.32

... More
Handling,loading,unloading and transportation of new/released OHE structure from different railway site to concerned TRD depot

2

2678

5356.98

... More
Excavation and casting of foundation & plinth in concrete in other than hard soil and rocky soil.

16

5928

94857.28

... More
Supply of steel structure galvanised including Traction masts, main masts , fabricated steel other than mast, SPS etc. for OHE.

2

121207

242414.76

... More
Manual erection of steel structure galvanised including Traction masts, main masts , fabricated steel other than mast, SPS etc. for OHE 4

-

-

21760.52

... More
Supply and erection of single bracket assembly 5

-

-

126364

... More
Transfer of equipment from one mast or support to another 6

-

-

38921.12

... More
Supply & erection of structure bond 7

-

-

9199.8

... More
Supply & erection of single earth electrod (earthing station) 8

-

-

9743.96

... More
Supply & erection of earth bus (MS flat 50x6mm) 9

-

-

7104.6

... More
Dismantaling of structure by cutting 10

-

-

32089.68

... More
Dismantaling of bracket 11

-

-

4526.96

... More
Slewing of overhead equipment

-

-

100368

... More
New dropper and re-adjustment of dropper with all associated components & adjustment of OHE to get adequate height. 13

-

-

64188.6

... More
Supply and erection of caution board, stop board and other similar board. 14

-

-

10766.46

... More
Supply & Erection of false contact wire including all accessories. 15

-

-

8255.4

... More
Provision of Protective screens at on ROB.

12

24498

293983.32

... More
Handling,loading,unloading and transportation of new/released OHE structure from different railway site to concerned TRD depot .

2

2678

5356.98

... More
Excavation and casting of foundation & plinth in concrete in other than hard soil and rocky soil.

16

5928

94857.28

... More
Supply of steel structure galvanised including Traction masts, main masts , fabricated steel other than mast, SPS etc. for OHE.

2

121207

242414.76

... More
Manual erection of steel structure galvanized including Traction masts, main masts , fabricated steel other than mast, SPS etc. for OHE 4

-

-

21760.52

... More
Supply and erection of single bracket assembly 5

-

-

126364

... More
Transfer of equipment from one mast or support to another

-

-

38921.12

... More
Supply & erection of structure bond 7

-

-

9199.8

... More
Supply & erection of single earth electrod (earthing station) 8

-

-

9743.96

... More
Supply & erection of earth bus (MS flat 50x6mm) 9

-

-

7104.6

... More
Dismantaling of structure by cutting 10

-

-

32089.68

... More
Dismantaling of bracket 11

-

-

4526.96

... More
Slewing of overhead equipment

-

-

100368

... More
New dropper and re-adjustment of dropper with all associated components & adjustment of OHE to get adequate height. 13

-

-

64188.6

... More
Supply and erection of caution board, stop board and other similar board. 14

-

-

10766.46

... More
Supply & Erection of false contact wire including all accessories. 15

-

-

8255.4

... More
Provision of Protective screens at on ROB.

12

24498

293983.32

... More
Handling,loading,unloading and transportation of new/released OHE structure from different railway site to concerned TRD depot .

2

2678

5356.98

... More
Excavation and casting of foundation & plinth in concrete in other than hard soil and rocky soil.

10

5928

59285.8

... More
Supply of steel structure galvanized including Traction masts, main masts , fabricated steel other than mast, SPS etc. for OHE

1

121207

121207.38

... More
Manual erection of steel structure galvanized including Traction masts, main masts , fabricated steel other than mast, SPS etc. for OHE 4

-

-

10880.26

... More
Supply and erection of single bracket assembly 5

-

-

63182

... More
Transfer of equipment from one mast or support to another 6

-

-

19460.56

... More
Supply & erection of structure bond 7

-

-

1839.96

... More
Supply & erection of single earth electrode (earthing station) 8

-

-

19487.92

... More
Supply & erection of earth bus (MS flat 50x6mm) 9

-

-

14209.2

... More
Dismantling of structure by cutting 10

-

-

16044.84

... More
Dismantling of bracket 11

-

-

2263.48

... More
Slewing of overhead equipment

-

-

125460

... More
New dropper and re-adjustment of dropper with all associated components & adjustment of OHE to get adequate height.

-

-

80235.75

... More
Supply and erection of caution board, stop board and other similar board. 14

-

-

7177.64

... More
Erection of false contact wire including all accessories. 15

-

-

12383.1

... More
Provision of Protective screens at on FOB ( 1 set=2Nos of 4.0 mtr )

14

24498

342980.54

... More
Handling, loading, unloading and transportation of new/released OHE structure from different railway site to concerned TRD depot .

1

2678

2678.49

... More
Excavation and casting of foundation & plinth in concrete in other than hard soil and rocky soil.

12

5928

71142.96

... More
Supply of steel structure galvanized including Traction masts, main masts , fabricated steel other than mast, SPS etc. for OHE

1.5

121207

181811.07

... More
Manual erection of steel structure galvanized including Traction masts, main masts , fabricated steel other than mast, SPS etc. for OHE 4

-

-

16320.38

... More
Supply and erection of single bracket assembly. 5

-

-

94773

... More
Transfer of equipment from one mast or support to another 6

-

-

29190.84

... More
Supply & erection of structure bond. 7

-

-

2759.94

... More
Supply & erection of single earth electrode (earthing station) 8

-

-

9743.96

... More
Supply & erection of earth bus (MS flat 50x6mm) 9

-

-

23682

... More
Dismantling of structure by cutting 10

-

-

12835.88

... More
Dismantling of bracket 11

-

-

2263.48

... More
Slewing of overhead equipment

-

-

66912

... More
New dropper and re-adjustment of dropper with all associated components & adjustment of OHE to get adequate height. 13

-

-

42792.4

... More
Supply and erection of caution board, stop board and other similar board. 14

-

-

28710.56

... More
Erection of false contact wire including all accessories. 15

-

-

8255.4

... More
Provision of Protective screens at on ROB.

4

24498

97994.44

... More
Handling, loading, unloading and transportation of new/released OHE structure from different railway site to concerned TRD depot . 17

0.8

-

2142.79

... More
Supply and erection of Retro reflective number plate.

-

-

5032.4

... More
Excavation and casting of foundation & plinth in concrete in other than hard soil and rocky soil.

-

-

1

... More
Supply of steel structure galvanized including Traction masts, main masts , fabricated steel other than mast, SPS etc. for OHE.

1

121207

121207.38

... More
Manual erection of steel structure galvanized including Traction masts, main masts , fabricated steel other than mast, SPS etc. for OHE 4

-

-

10880.26

... More
Supply and erection of single bracket assembly. 5

-

-

63182

... More
Transfer of equipment from one mast or support to another 6

-

-

19460.56

... More
Supply & erection of structure bond. 7

-

-

91998

... More
Supply & erection of single earth electrode (earthing station) 8

-

-

19487.92

... More
Supply & erection of earth bus (MS flat 50x6mm) 9

-

-

14209.2

... More
Dismantling of structure by cutting 10

-

-

16044.84

... More
Dismantling of bracket

-

-

2263.48

... More
Preparation and design of station working rule complete in all respect and supply of approved soft and hard copy in 10 copies for each station.

-

-

20145.26

... More
New dropper and re-adjustment of dropper with all associated components & adjustment of OHE to get adequate height. 13

-

-

53490.5

... More
Supply and erection of caution board, stop board and other similar board.

-

-

53832.3

... More
Excavation and casting of foundation & plinth in concrete in other than hard soil and rocky soil.

18

5928

106714.44

... More
Supply of steel structure galvanized including Traction masts, main masts , fabricated steel other than mast, SPS etc. for OHE.

3

121207

363622.14

... More
Manual erection of steel structure galvanized including Traction masts, main masts , fabricated steel other than mast, SPS etc. for OHE 4

-

-

32640.78

... More
Supply and erection of single bracket assembly 5

-

-

189546

... More
Transfer of equipment from one mast or support to another 6

-

-

58381.68

... More
Supply & erection of structure bond. 7

-

-

5519.88

... More
Supply & erection of single earth electrode (earthing station) 8

-

-

9743.96

... More
Supply & erection of earth bus (MS flat 50x6mm) 9

-

-

35523

... More
Dismantling of structure by cutting

-

-

32089.68

... More
Slewing of overhead equipment

-

-

75276

... More
New dropper and re-adjustment of dropper with all associated components & adjustment of OHE to get adequate height. 13

-

-

48141.45

... More
Supply and erection of caution board, stop board and other similar board. 14

-

-

17944.1

... More
Erection of false contact wire including all accessories. 15

-

-

12383.1

... More
Provision of Protective screens at on ROB.

10

24498

244986.1

... More
Handling, loading, unloading and transportation of new/released OHE structure from different railway site to concerned TRD depot .

2

2678

5356.98



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.