West Central Railway Tender

Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.

West Central Railway - WCR Tender

Works
Civil And Construction
Civil Works Others
Ireps
Opening Date14 Aug 2024
Closing Date6 Sep 2024
Tender Amount₹ 11,42,17,557.18 
Notes
Download

Costs

Summary

A) Guna - Upgradation Of Infrastructure At Goods Shed. B) Ashoknagar - Upgradation Of Infrastructure At Goods Shed.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
All DSR items of Road and Goods shed of Pt. B work

-

-

27611578.81

... More
All DSR items for ETP, STP, WRP of Pt. B work

-

-

248787.91

... More
All Green Belt items of Pt. A work

-

-

509332.2

... More
All Green Belt items of Pt. B work

-

-

509332.2

... More
Providing, fabrication and laying of self supported arch shaped mechanically seamed trussless of colour coated galvalume roofing system such as Proflex or similar as approved by Engineer-in- charge, made of superior quality structural grade steel, having 350 MPA yield strength, pre coated galvalume sheet as per ASTM A 792 M of base thickness 0.90 mmto 1.60 mm (tolerance +/-0.02mm) with minimum coating mass as per AZM 150. Total coated thickness 1.075mm to 1.775 (tolerance +/- 0.02mm). Roofing should be designed as per ASCE 7- 20 international building code 2002. The analysis shall be carried out for span and center arch-rise considering out for span and center arch-rise considering the required live load, wind load, dead load and the seismic factor. The roof panel formation shall be done as per the required length and curvature using hydraulic profile machine to give it the trapezoidal shape in required curvature. Inthis process the width of the sheet reduces from 0.914 meter to 0.61 meter (tolerance +/- 0.02 m). Theroof panel shall be lifted using a suitable crane and using a spreader bar and sling evenly placed to ensure no distortion of the panels during lifting and placing. The crane shall hold/support the panel till the alignment is done and completed using a plomb and a water tube and bolted into beam. These curved panels have interlocking formation and are crimped together using mechanical seaming 08 machine, which imposes a load of approximately five tonnes to ensure the seaming of required rigidity. After seaming, a clear epoxy lacquer is applied on the inner side of panel end in 15 cm width to form a protective layer between panel and concrete beam. "These panels are installed over existing water proof concretegutter-beams having beveled edge to receive (support) curved panels. Beam shall design for arch reaction and vertical loads. Plaster shall not applied on the beam. Schmidt Hammer test of the concrete should be carried out before erection to ensure that the anchor bolt can be securely fixed on support. In case of steel structure a steel runner plate of 6 mm thickness and G.I. sheet gutter of suitable size shall be provided for installation of panels, G.I. anchor bolt of required size and type withG.I. washer and neoprene washers shall be provided as per design. After installation of panels, trapezoidal voids are created between gutter-beam and panels which should be covered by a flashing fabricated or brick masonary which is to be paid separately. Area of this roof shall be measured along the periphery of hem-top between end to end of panels. Ridge and valley shall not be taken into consideration for measuring length tranverse to periphery. The rate includes supplying, fixing, loading unloading, hire charges of all plants machineries, acnhors, fasteners, washers, bolts, epoxy, paint and all wastage etc. complete. The rate includes supplying and fixing accessories and fixtures like hangers/clamps for installation of lighting/fixtures/utility/duct as per requirement. This item shall be executed only by the agency, which has all require manufacturing machineries and necessary expertise. Note- Contractor will have to be submit the design of roofing for approval of Railway. Roofing shall be provided only after getting it approved from railway . "a - Span upto 19.00 Mtr or as per site requirement . Thickness = 1.10 MM"

2625

2250

5908402.5

... More
All NS items of Pt. B work excluding NS 1

-

-

3046618.8

... More
Providing, fabrication and laying of self supported arch shaped mechanically seamed trussless of colour coated galvalume roofing system such as Proflex or similar as approved by Engineer-in- charge, made of superior quality structural grade steel, having 350 MPA yield strength, pre coated galvalume sheet as per ASTM A 792 M of base thickness 0.90 mmto 1.60 mm (tolerance +/-0.02mm) with minimum coating mass as per AZM 150. Total coated thickness 1.075mm to 1.775 (tolerance +/- 0.02mm). Roofing should be designed as per ASCE 7- 20 international building code 2002. The analysis shall be carried out for span and center arch-rise considering out for span and center arch-rise considering the required live load, wind load, dead load and the seismic factor. The roof panel formation shall be done as per the required length and curvature using hydraulic profile machine to give it the trapezoidal shape in required curvature. Inthis process the width of the sheet reduces from 0.914 meter to 0.61 meter (tolerance +/- 0.02 m). Theroof panel shall be lifted using a suitable crane and using a spreader bar and sling evenly placed to ensure no distortion of the panels during lifting and placing. The crane shall hold/support the panel till the alignment is done and completed using a plomb and a water tube and bolted into beam. These curved panels have interlocking formation and are crimped together using mechanical seaming machine, which imposes a load of approximately five tonnes to ensure the seaming of required rigidity. After seaming, a clear epoxy lacquer is applied on the inner side of panel end in 15 cm width to form a protective layer between panel and concrete beam. "These panels are installed over existing water proof concretegutter-beams having beveled edge to receive (support) curved panels. Beam shall design for arch reaction and vertical loads. Plaster shall not applied on the beam. Schmidt Hammer test of the concrete should be carried out before erection to ensure that the anchor bolt can be securely fixed on support. In case of steel structure a steel runner plate of 6 mm thickness and G.I. sheet gutter of suitable size shall be provided for installation of panels, G.I. anchor bolt of required size and type withG.I. washer and neoprene washers shall be provided as per design. After installation of panels, trapezoidal voids are created between gutter-beam and panels which should be covered by a flashing fabricated or brick masonary which is to be paid separately. Area of this roof shall be measured along the periphery of hem-top between end to end of panels. Ridge and valley shall not be taken into consideration for measuring length tranverse to periphery. The rate includes supplying, fixing, loading unloading, hire charges of all plants machineries, acnhors, fasteners, washers, bolts, epoxy, paint and all wastage etc. complete. The rate includes supplying and fixing accessories and fixtures like hangers/clamps for installation of lighting/fixtures/utility/duct as per requirement. This item shall be executed only by the agency, which has all require manufacturing machineries and necessary expertise. Note- Contractor will have to be submit the design of roofing for approval of Railway. Roofing shall be provided only after getting it approved from railway . "a - Span upto 19.00 Mtr or as per site requirement . Thickness = 1.10 MM"

4560

2250

10263739.2



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.