Water Resources Department Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Water Resources Department - WRD Tender
Civil And Construction
Eprocure
Opening Date16 Jan 2024
Closing Date23 Jan 2024
Tender Amount₹ 59,806
Costs
EMD
₹ 1,196Document Cost
₹ 1,000Tender Fee
₹ 295
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_WRD_321546_1Bid Award Id
ViewTender No
562/2023-24Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://www.mpwrd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing Casting machining and assembling Head stooks assembly with handle complete for operating Tank, canal, banage, stop dam gates , as per drawing with testing ,including cost of all materials as head stock body, GM Nut, Warm wheel, Gear, Bush ,Pin ,operating handle etc. with machinery, labour, cutting, aligning, welding, finishing, cleaning, painting etc. ,complete as per specifications and approved drawings with all lead and lifts, including packing & forwarding transportation charges for structural steel comDonents and other materials. Head Stock screw jack type 50mm dia. threaded Nut (Model M-75), 0.750 tonne capacity, approx-45 kg weight (02 No.)
90
13050
145
... More
Thrust bearing with cone and collar. 16/17
2
600
300
... More
Providing and applying one coat of Zinc rich epoxy primer paint (zinc content 85%) of approved quality 40 micron dry film thickness to gates/ embedded parts/ hoist components including cost of all materials, labour, removing rust cleaning surface, scaffolding etc. complete.
14
2492
178
... More
Providing and applying two coats of anticorrosive bituminous black paint of approved quality 40 micron dry film thickness each coat to gate components such as horizontal girders/sector and all bracings/ trunion assembly/ yoke girders/ stiffeners/ foot bridge etc. including cost of all materials, labour, removing rust, cleaning surface, scaffolding etc. complete.
18
1386
77
... More
Providing of High tensile MS Nut Bolts
of required size and type, as per specifications with testing including all lead and lifts, packing & forwarding charges for all components etc. complete.
12.5
1725
138
... More
MS Shutter plate Pin heavy duty
2
704
352
... More
MS Gate Operation Key
2
900
450
... More
Providing, Fabrication, machining with sffaightening work of Guide Tee, Track, Sealing frame, Leaf frame or any part of gate's, complete as per drawing with testing ,including cost of all materials, with machinery, labour, tools and tackles cutting, aligning, welding, finishing, cleaning, etc., applying one coat of zinc dch epoxy primer and two coats of cold applied coal tar epoxy paint, etc., complete as per speciflcations and approved drawings with all lead and lifts, including packing & forwarding, fansportation charges for structural steel components and other materials. Rate of work with all material
80
7920
99
... More
Erection work of fabricated gates , any parts of gate's and any accessories of gate's, complete as per drawing with testing ,including cost of all materials required for completing the job like welding rods, tools tackles etc., with machinery, labour, tools and tackles cutting, aligning, welding, finishing cleaning, etc., applying one coat of zinc rich epoxy primer and two coats of cold applied coal tar epoxy paint, etc., complete as per specifications and approved drawings with all lead and lifts, including packing & forwarding, transportation charges for structural steel components and other materials.
80
2000
25
... More
Transportation charges with utility van and with four men (two helper , one welder and one fitter) with welding parts, cutting items and extra tools and tackles required for fitting work gate parts and head etc upto 50 km
2
8000
4000
... More
GST@18%
1
9123
9123.01
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements