South Eastern Coalfields Limited Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
South Eastern Coalfields Limited - SECL Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date18 Jun 2024
Closing Date4 Jul 2024
Tender Amount₹ 67,19,159
Costs
EMD
₹ 84,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SECL_310647_1Bid Award Id
ViewTender No
SECL/SGP/SO(M)/e-T/35/24-2 5/656 Dt16.06.2024Tender Authority
South Eastern Coalfields Limited ViewPurchaser Address
-Website
http://http://www.secl-cil.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Transportation of all kind of building material from surface to u/g through haulages with tramming and pushing, coupling /uncoupling etc for a distance every 1.0 Km or part there of and bringing the empty tubs to surface. = Cement - 10.68 m3, Sand- 21.36m3, Stone chips- 42.72 m3 Total - 74.76 m3 ( Details in Annexur- B)
74.76
-
208.36
Loading of all kind building materials in to tub at Inc. mouth- Cement - 10.68 m3, Sand- 21.36m3, Stone chips- 42.72 m3 Total - 74.76 m3 ( Details in Annexur- B)
74.76
-
271.38
Unloading of all kind building materials in to tub at destination- Cement - 10.68 m3, Sand- 21.36m3, Stone chips- 42.72 m3 Total - 74.76 m3 ( Details in Annexur- B)
74.76
-
198.66
Dismantling and transporting of 1000mm drive head (Double drive drum) with loop take up and all accessories (like as motor, gearbox, drive drum, girders, frame, chute & side plates etc) with lead of 100m/ up to track end. ( Details in Annexur- A)
3
-
61126.12
Installation of 1000 mm drive head (double drive drum) with all accessories with loop take-up (like as motor, gearbox, drive drum, girders, frame, chute& side plates etc) including carrying manually from end of track in u/g and assembling the same as per instruction of Exe. in-charge ( Details in Annexur- A)
8
-
72861.8
Cement concrete/PCC (1:2:4) in foundation/plinth /flooring/wall (any thickness) in u/g (Excluding centring, shuttering and cost of CC materials) (PCC Required as per Sl. No. 2 )
48
-
2799.5
Dismantling of belt structure along with PVC belt (800mm/1000mm) including cleaning stacking the same within a distance of 50m ( Details in Annexur- A)
1203
-
58.3
Transportation of steel structures materials from surface to underground through haulages with tramming & pushing, coupling/uncoupling etc for a distance every 1.0 Km or part thereof including loading/unloading & stacking the same at destination. Or Transportation of all dismantled steel structures materials in u/g from one section to other Section or u/g to surface through haulages with tramming & pushing, coupling/uncoupling etc for a distance every 1.0 Km or part thereof including loading/unloading &stacking the same at destination beltingTransportation of dismentaled materials manually up to Loading point,loading in tub/trolly in uderground ,transportation of materials through haulage ,pushing manually up to unloading point,unloadingfromtub/trolly,manual Unloading from tubs/trolleys and transporting up to desination and stacking. ( Details in Annexur- A)
366.36
-
208.36
Installation/erection of complete belt conveyor structure(1000mm) in u/g including cleaning of site, laying & fitting stool, strangers, brackets, bottom rollers, top rollers, pull card switches etc complete ( Details in Annexur- A)
4611
-
436.72
Installation of tail end drum of belt conveyor (800/1000mm) with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling & carrying/transporting from other section through haulages/pushing manually ( Details in Annexur- A)
46
-
14482.6
Transportation of PVC belt (1000mm) from surface to u/g or one section to another section in u/g through haulages with tramming, pushing, coupling/uncoupling etc for a distance every 1.0 Km or part thereof including loading, unloading & stacking the same at destination ( Details in Annexur- A)
9222
-
72.41
Placing of PVC belt (1000mm) on conveyor structures in u/g including jointing of belt and aligning of belt conveyor ( Details in Annexur- A)
9222
-
87.27
Part-B Material Cost supply and stacking of building materials Cement
305
-
224.58
Sand -
21.36
-
1032.54
Stone chips
42.72
-
1692.54
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements