South Eastern Coalfields Limited Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
South Eastern Coalfields Limited - SECL Tender
Transportation and Logistics
Machinery and Tools
Eprocure
Opening Date24 Aug 2024
Closing Date14 Sep 2024
Tender Amount₹ 96,67,866
Costs
EMD
₹ 1,20,900Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SECL_315755_1Bid Award Id
ViewTender No
SECL/SGP/SO(M)/e-T/35/24-2 5/662 Dt23.08.2024Tender Authority
South Eastern Coalfields Limited ViewPurchaser Address
-Website
http://http://www.secl-cil.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Installation/erection of complete belt conveyor structure (1000mm/1200mm) in u/g including cleaning of site, laying & fitting stool, strangers, brackets, bottom rollers, top rollers, pull card switches etc complete.
6150
-
450.98
Placing of PVC belt (1000/1200mm) on conveyor structures in u/g including jointing of belt and aligning of belt conveyor. (6150X2=12300 Mtr.)
12300
-
90.12
Installation of tail end drum of belt conveyor (800/1000mm) with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling & carrying/ transporting from other section through haulages/pushing manually.
10
-
14955.6
Shifting of tail end drum of belt conveyor (800/1000 mm with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling, carrying , from one place to other place in same section/district within a lead of 50m.6150 – (51 x 3) = 5997/ 51 = 117.59 Shifting say 118 shifting
118
-
7477.8
General cleaning/house keeping not exceeding 5cm in depth including disposal of cleaned muck/debris to be stacked up to 50 m. or to be levelled and neatly dressed at site of drive head installations.15.00x6.00x 10 nos. =900m2
900
-
13.24
Cutting in soft stone by chisel & hammer for digging of pits of foundation work-
a) for drive head- (4.00x0.50x1) x 02 nos. = 4.00 m3 x 10 Set = 40.00m3
b) for discharge - (0.40x0.40x1) x 04 nos. = 0.64 m3 x 10 Set = 6.40 m3
c) for Loop Take up- (0.40x0.40x1) x 04 nos. = 0.64 m3 x 10 Set = 6.40 m3 Total = 52.80 m3
52.8
-
5341.29
Cement concrete/PCC (1:2:4) in foundation/plinth/ flooring/wall (any thickness) in u/g (Excluding centring, shuttering and cost of CC materials)
a) for drive head- (4.00x0.50x1) x 02 nos. = 4.00 m3 x 10 Set = 40.00m3
b) for discharge - (0.40x0.40x1) x 04 nos. = 0.64 m3 x 10 Set = 6.40 m3
c) for Loop Take up- (0.40x0.40x1) x 04 nos. = 0.64 m3 x 10 Set = 6.40 m3 Total = 52.80 m3
52.8
-
2890.86
Loading of all kind of building materials in to tubs at incline/Pit mouth on surface with lead of 50m.
82.24
-
281.11
Transportation of all kind of building material from surface to u/g through haulages with tramming and pushing, coupling /uncoupling etc for a distance every 1.0 Km or part there of and bringing the empty tubs to surface. (calculation sheet enclosed)
82.24
-
215.16
Unloading of all kind of building materials from tubs at destination in u/g and stacking the same
82.24
-
205.15
Dismantling and transporting of 1000mm drive head (Double drive drum) with loop take up and all accessories (like as motor, gearbox, drive drum, girders, frame, chute & side plates etc) with lead of 100m/ up to track end.
5
-
63119.32
Installation of 1000 mm drive head (double drive drum) with loop take-up & all accessories (like as motor, gearbox, drive drum, girders, frame, chute& side plates etc) including carrying manually from end of track in u/g and assembling the same as per instruction of Exe. In-charge.
5
-
75235.6
Dismantling & transporting of 1200 mm drive head (double drive drum) with loop take up and all accessories (like as motor, gear box, drive drum, girders, frame, chute & side plate etc) with lead of 100m/up to track end in u/g.
5
-
78226.72
Installation of 1200 mm drive head (double drive drum) with loop take up and all accessories (like as motor, gear box, drive drum, girders, frame, chute & side plate etc) including carrying manually from end of track in u/g and assembling the same as per instruction of Exe. In-charge
5
-
96173.44
Part-B Material Cost (As per market Analysis Rate) Supply & stacking of materials at Bangwar UG Mine. Cement-
336
-
224.58
Sand -
23.5
-
1032.54
Stone Chips
46.99
-
1692.54
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements