South Eastern Coalfields Limited Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
South Eastern Coalfields Limited - SECL Tender
Civil And Construction
Eprocure
Opening Date14 Nov 2024
Closing Soon29 Nov 2024
Tender Amount₹ 22,50,220
Costs
EMD
₹ 28,200Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SECL_321095_1Tender No
SECL/SGP/SO(M)/e-T/35/24-2 5/669 Dt13.11.2024Tender Authority
South Eastern Coalfields Limited ViewPurchaser Address
-Website
http://http://www.secl-cil.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Groove cutting in soft stone In roof –i) 4{2X(4.80m.x0.15m.X0.10 m.)}=0.58 m3 ii) 2{2X(5.30m.x0.15m.X0.10 m.)}=0.32 m3
In side – i) 4{4X(1.20m.x0.15m.X0.10 m.))=0.29 m3 ii) 2{4X(1.80m.x0.15m.X0.10 m.)}=0.22 m3 Total = 1.41
1.41
5341
-
Groove cutting in coal/shale -
In floor – 2{2X( 5.60m.x0.30m.X0.30 m.)}=2.02 m3
In side –i)2{4X (2.50m.x0.30m.X0.30 m.)}=1.80 m3 ii) 2{4X(0.50m.x0.15m.X0.10 m.)}=0.06 m3 Total = 3.88 m3
3.88
1466
-
Reinforced cement concrete (1:2:4) in wall/roof ceiling of air crossing/stopping (any thickness) in u/g (Excluding centring, shuttering, reinforcement cutting, bending, placing in position and binding etc all complete as well as cost of RCC materials) Lower wall-
2{2X6.35m.X2.80m.X0.30m.} = 21.34 m3
Upper wall –
i)4{2X5.10m.X2.50m.X0.15m.} = 15.30 m3
ii)2{2X5.90m.X2.50m.X0.15m.} = 8.85 m3 Roof slab of Air crossing- i)4{5.80m. X 4.50m. X 0.10m.}= 10.44 m3
ii)2{6.35m. X 5.00m. X 0.10m.}= 6.35 m3 Total = 62.28 m3
62.28
4773
-
Centring, shuttering, finishing and reinforcement including cutting, bending, placing in position and binding and strutting, propping etc compleCentring, shuttering, finishing and reinforcement including cutting, bending, placing in position and binding and strutting, propping etc complete
Lower wall-
2{2X5.75m.X2.50m.} = 57.50 m2
Upper wall –
i) 4{2X4.80m.X2.20m.} = 84.48 m2
ii)2{2X5.60m.X2.20m.} = 49.28 m2
Roof slab of Air crossing-
i)4{5.50m. X 4.50m. } = 99.00 m2
ii)2{6.05m. X 5.00m. } = 60.50 m2 Total = 350.76 m2
350.76
916
-
6 mm thick cement plaster along with making of Board (1:6) Lower wall- 2{2 X (5.75m. X 2.50m. )}= 57.50 m2
Upper wall i)4{2 X (4.50m. X 2.20m. ))= 79.20 m2
ii)2{2 X (5.30m. X 2.20m. ))= 46.64 m2 TOTAL = 183.34 m2
183.34
333
-
Loading of all kind building materials in to tub at Inc. mouth- a) Cement
406
9
-
b) Sand + stone chips (29.12+55.43 m³)
84.55
281
-
d) Steel rod(12 mm)
2.67
95
-
Transportation of all kind of building material from surface to ug through haulages with tramming and coupling/uncoupling etc for a distance every 1.0 km there of and bringing the empty tubs to surface
a) Cement
406
7
-
b) Sand + stone chips (29.12+55.43 m³)
84.55
215
-
d) Steel rod(12 mm)
2.67
73
-
Unloading of all kind building materials in to tub at distination
a) Cement
406
6
-
b) Sand + stone chips (29.12+55.43 m³)
84.55
205
-
d) Steel rod(12 mm)
2.67
87
-
Lead for transportation/carriage of all kinds building materials by manually in u/g.
(46 to 60 mtr.)
99.1
84
-
Roof support including drilling of holes (stone) by providing of drill bit. drill rod, & jet pump by the contractor and installation of roof bolts (1.50m to 1.80m) with bearing plate & w-strap (where required) , Anchorage testing and carrying of support materials.
Total length – 65.00/0.80=81.25X 5 nos. = 405 nos.
Additional bolts required in 06 Junctions = 12 rows x 5 nos. = 60 No.
Total = 465 nos
465
269
-
Part-B Material Cost supply and stacking of building materials Cement
406
319
-
Sand -
29.12
1291
-
Stone chips
55.43
1614
-
Steel rod(12mm)
2672.4
63
-
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%