South Eastern Coalfields Limited Tender

Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.

South Eastern Coalfields Limited - SECL Tender

Civil And Construction
Excavation
Eprocure
Opening Date13 Jan 2022
Closing Date24 Jan 2022
Tender Amount₹ 13,67,954 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Centring, shuttering, finishing and reinforcement including cutting, bending, placing in position and binding and strutting, propping etc complete. For Double drum drive : (5.00+1.00+1.00)x 0.30=2.10m2x 5 Nos.=10.50m2 (5.00+0.50+0.50)x 0.30=1.80m2x 5 Nos.=9.00m2 (5.00+5.00+0.50+0.50)x 0.30=3.3m2x 5 Nos.=16.50m2 (0.50+0.50+0.50+0.50)x 4=8.00m2x0.30 x5 Nos.=12.00m2 U/G Sub Station: 03Nos (7.00+7.00+1.00+1.00)x 0.30=4.80m2x 3 Nos.=14.40m2 Total = 62.40m2

62.4

-

275.88

... More
Loading of all kind of building materials in to tubs at incline/Pit mouth on surface with lead of 50m.

175.55

-

250.63

... More
Transportation of all kind of building material from surface to u/g through haulages with tramming and pushing, coupling /uncoupling etc for a distance every 2.0 Km or part there of and bringing the empty tubs to surface. (calculation sheet enclosed)

175.55

-

217.5

... More
Unloading of all kind of building materials from tubs at destination in u/g and stacking the same

175.55

-

180.33

... More
Dismantling and transporting of 1000mm drive head (Double drive drum) with loop take up and all accessories (like as motor, gearbox, drive drum, girders, frame, chute & side plates etc) with lead of 100m/ up to track end. Location:- MD2/37LE-38LE,41LE/MD2-MD1, 47LE/MD2-MD1 & 41LE/23D-24D/47LE

4

-

55610.42

... More
Installation of 1000 mm drive head (double drive drum) with loop take-up & all accessories (like as motor, gearbox, drive drum, girders, frame, chute& side plates etc) including carrying manually from end of track in u/g and assembling the same as per instruction of Exe. In-charge Location:- ECR/37LE , 29LE/MD1,7D/29LE, 37LE/7D, & 37LE/24D

5

-

66326.88

... More
Installation of 800 mm drive head (single drive drum) with all accessories ( without looptake up) including carrying manually from end of track in u/g and assembling the sameas per instruction of exe. In-charge/Engineer Location : 37LE/MD2-MD1

1

-

18553.24

... More
Dismantling, transporting and installation of direct haulage/Tugger haulage with all materials/Accessories (such as Base, drum, motor, gearbox, starter etc) including loading, transporting through aulages /pushing by manual from surface to u/g up to destination as per instruction of Exe. In-charge (exclusive foundation/grouting work)

2

-

21233.48

... More
Dismentling,transportation & installation of endless haulage with all accessories (such as Base, drum, motor,gearbox, starter resistance, controller etc) and anchoring tension pulley including loading on trolley, transporting through haulages/pushing by manual from surface to underground up to siteand assembling the same as per instruction of Exe. In-charge(exclusive foundation/grouting work Location : 28LE/MD2-MD1

1

-

92622.77

... More
Transportation and installation of direct haulage/Tugger haulage with all accessories(such as Base, drum, motor, gearbox, starter etc) including loading, transporting through haulages/Pushing by manual from surface to u/g up to destination and assembling the same as perinstruction of Exe. In-charge (exclusive foundation/grouting work) Location : 9D/28LE-29LE

1

-

15974.97

... More
Part-B Material Cost supply and stacking of building materials Cement

721

-

224.58

... More
Sand -

50.16

-

1032.54

... More
Stone chips(20mm)

100.31

-

1692.54

... More
Total impact of GST for the purpose of CTC

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.