South Eastern Coalfields Limited Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
South Eastern Coalfields Limited - SECL Tender
Civil And Construction
Machinery and Tools
Eprocure
Opening Date16 Sep 2024
Closing Date27 Sep 2024
Tender Amount₹ 16,98,048
Costs
EMD
₹ 21,300Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SECL_317599_1Bid Award Id
ViewTender No
SECL/SGP/SO(M)/e-T/35/24-2 5/666 Dt16.09.2024Tender Authority
South Eastern Coalfields Limited ViewPurchaser Address
-Website
http://http://www.secl-cil.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Item No. 03 of GM’ SOR-2019:
Cement concrete/PCC (1:2:4) in foundation/plinth/flooring/wall (any thickness) in u/g (Excluding centering, shuttering, and cost of CC materials)
For Double Drum Drive head:
a) for drive head- (4.00x0.50x1) x 02 nos. = 4.00 m3
b) for discharge - (0.40x0.40x1) x 04 nos. = 0.64 m3
c) for Loop Take up-(0.40x0.40x1) x 04 nos. = 0.64 m3 Total = 5.28 m3 (5.28m3x 03 nos ) = 15.84 m3 (A)
For Single Drum Drive head:
02 nos x (0.40x0.40x1.00) x 06. Nos = 1.92m3 (1.92m3x 03 nos ) = 5.76 m3(B) Total (A+B) = 21.60 m3
21.6
-
2799.5
Item No. 10 of GM’ SOR-2019:
Loading of all kinds of building materials in-to tub
At Incline mouth (1) Stone chips – 19.22 m3
(2) Sand - 09.61 m3
(3) Cement - 04.81 m3 - Total - 33.64 m3
33.64
-
271.38
Item No. 11 of GM’ SOR-2019:
Transportation of materials with tramming & pushing, coupling & uncoupling with haulages for a distance every 500 m 0r part thereof and bringing the empty tubs to surface. (2.00Km lead)
33.64
-
239.61
Item No. 12 of GM’ SOR-2019:
Unloading of all kinds of building materials in-to tub at destination in u/g
33.64
-
198.66
Item No. 33 of GM’ SOR-2019:
Dismantling and transporting of 800mm drive head (Double drive drum) with loop take up and all accessories (like as motor, gearbox, drive drum, girders, frame, chute & side plates etc) with lead of 100m/ up to track end. Double Drum Drive head : 03set
3
-
40775.68
Item No. 31 of GM’ SOR-2019:
Dismantling and transporting of 800mm drive head (Single drive drum) with all accessories (like as motor, gearbox, drive drum, girders, frame, chute & side plates etc) with lead of 100m/ up to track end. Single Drum Drive head : 03set
3
-
20387.84
Item No. 38 of GM’ SOR-2019:
Installation of 800 mm drive head (double drive drum) with loop take-up & all accessories (like as motor, gearbox, drive drum, girders, frame, chute& side plates etc) including carrying manually from end of track in u/g and assembling the same as per instruction of Exe. In-charge.
Double Drum Drive head : 03 set
3
-
43784.4
Item No. 36 of GM’ SOR-2019:
Installation of 800 mm drive head (Single drive drum) with all accessories (like as motor, gearbox, drive drum, girders, frame, chute& side plates etc) including carrying manually from end of track in u/g and assembling the same as per instruction of Exe. In-charge
Single Drum Drive head : 03 set
3
-
20387.84
Item No.41 of GM’ SOR-2019:
Installation of tail end drum of belt conveyor (800/1000mm) with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling & carrying/transporting from other section through haulages/pushing manually.
Double Drum Drive head : 03set
Single Drum Drive head : 03 set Total : 06 set
6
-
14482.6
Item No.23 of GM’SOR-2019:
Dismantling of belt structures along with PVC belt (800mm) including cleaning stacking the same within
a distance of 50m
1243
-
58.3
Item No.22 of GM’SOR-2019:
Transportation of steel structures materials from surface to underground through haulages with tramming & pushing, coupling/uncoupling etc for a distance every 1.0 Km or part thereof including loading/unloading &stacking the same at destination. (calculation sheet enclosed).
72.53
-
208.36
Item No.25 of GM’ SOR-2019:
Installation/erection of complete belt conveyor structure (800mm) in u/g including cleaning of site, laying & fitting stool, strangers, brackets, bottom rollers, top rollers, pull card switches etc complete. (i) 54D/1LW to 14LW = 270.00Mtrs.
(ii) 47D/1LW to 14LW = 270.00Mtrs.
(iii) 40D/1LW to 14LW = 270.00Mtrs.
(iv) 33R/1LW to -8LW = 200.00Mtrs.
(v) 33LW/33D to 40D = 150.00Mtrs.
(vi) 40D/-8LW to -4LW = 83.00Mtrs. Total =1,243.00Mtrs.
1243
-
349.83
Item No.27 of GM’ SOR-2019:
Placing of PVC belt (800mm) on conveyor structures in u/g including jointing of belt and aligning of belt conveyor. 1243.00 x 02 = 2,486.00 mtr.
2486
-
72.79
Part-B(Material cost) Supply & stacking of materialsCement
PCC 21.60 m3 @ 0.2225m3/m3= 4.806 m3 or 0.035 m3/bag= 137.31 Say 137 bags
137
-
224.58
Sand (Coarse grand)
Pcc 21.60 m3@0.445 m3/ m3 = 9.61 m3
9.61
-
1032.54
Stone chips (20mm size)
Pcc 21.60 m3@0.89 m3/m3= 19.22 m3
19.22
-
1692.54
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements