South Eastern Coalfields Limited Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
South Eastern Coalfields Limited - SECL Tender
Machinery and Tools
Electrical and Electronics
Electrical Works
Eprocure
Opening Date16 Feb 2022
Closing Date7 Mar 2022
Tender Amount₹ 11,02,445 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 21,700Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_SECL_234278_1Bid Award Id
ViewTender No
GM/HSD/C/e-Tender/21-22/72 Date 15.02.2022Tender Authority
South Eastern Coalfields Limited ViewPurchaser Address
-Website
http://http://www.secl-cil.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
PART B - RCC Foundation of Weigh Bridge
-
-
-
... More
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil
84
-
211.4
... More
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
12.6
-
779
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
12.6
-
4141.5
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone
aggregate 20 mm nominal size)
12.94
-
6405.5
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone
aggregate 20 mm nominal size)
5.83
-
5032.7
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars
1165
-
68
... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns
52.92
-
244.4
... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
42
-
537.9
... More
6 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand)
106.66
-
186.6
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
28
-
179.3
... More
PART C - Approach Road
-
-
-
... More
Transportation By Mechanical Transport including loading, unloading and stacking. Loose moorum/ sand/ earth/ surkhi/ cement/ stone dust/ hot mix asphalt material
420
-
129.13
... More
Dry Lean Cement Concrete Sub- base
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8- 10 tonnes vibratory roller, finishing and curing as per clause 601 of specification complete in all respect.
82.5
-
2639.72
... More
Providing and laying Plain/ Reinforced cement concrete in open foundation including form work shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of sections 1500, 1700 & 2100 with. PCC Grade M20
110
-
5075.84
... More
Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and technical specification and as per relevant clause of section 1600.
2200
-
63.38
... More
Total impact of GST for the purpose of CTC
1
-
-