South Eastern Coalfields Limited Tender

Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.

South Eastern Coalfields Limited - SECL Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date24 Aug 2024
Closing Date14 Sep 2024
Tender Amount₹ 70,24,287 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Installation/erection of complete belt conveyor structure (1000mm/1200mm) in u/g including cleaning of site, laying & fitting stool, strangers, brackets, bottom rollers, top rollers, pull card switches etc complete.

4400

-

450.98

... More
Transportation of PVC belt (1000/1200mm) from surface to u/g or one section to other section in u/g through haulages with tramming, pushing, coupling/uncoupling etc for a distance every 1.0 Km or part thereof including loading, unloading & stacking the same at destination.(4400 x 02 = 8800 mtr.).

8800

-

74.78

... More
Placing of PVC belt (1000/1200mm) on conveyor structures in u/g including jointing of belt and aligning of belt conveyor. (4400 x 02 = 8800 mtr.)

8800

-

90.12

... More
Installation of tail end drum of belt conveyor (800/1000mm) with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling & carrying/transporting from other section through haulages/pushing manually

7

-

14955.6

... More
Shifting of tail end drum of belt conveyor (800/1000mm with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling, carrying , from one place to other place in same section/district within a lead of 50m. 4400 – (51 x 3) =4247/ 51 = 83 Shifting

83

-

7477.8

... More
General cleaning/house keeping not exceeding 5cm in depth including disposal of cleaned muck/debris to be stacked up to 50 m. or to be levelled and neatly dressed at site of drive head installations. 15.00x6.00x 07 nos. = 630 m2

630

-

13.24

... More
Cutting in soft stone by chisel & hammer for digging of pits of foundation work- a) for drive head- (4.00x0.50x1) x 02 nos. = 4.00 m3 x 07 Set = 28.00m3 b) for discharge - (0.40x0.40x1) x 04 nos. = 0.64 m3 x 07 Set = 4.48 m3 c) for Loop Take up- (0.40x0.40x1) x 04 nos. = 0.64 m3 x 07 Set = 4.48 m3 Total = 36.96 m3

36.96

-

5341.29

... More
Cement concrete/PCC (1:2:4) in foundation/plinth/ flooring/wall (any thickness) in u/g (Excluding centring, shuttering and cost of CC materials) a) for drive head- (4.00x0.50x1) x 02 nos. = 4.00 m3 x 07 Set = 28.00m3 b) for discharge - (0.40x0.40x1) x 04 nos. = 0.64 m3 x 07 Set = 4.48 m3 c) for Loop Take up- (0.40x0.40x1) x 04 nos. = 0.64 m3 x 07 Set = 4.48 m3 Total = 36.96 m3

36.96

-

2890.86

... More
Loading of all kind of building materials in to tubs at incline/Pit mouth on surface with lead of 50m.

57.56

-

281.11

... More
Transportation of all kind of building material from surface to u/g through haulages with tramming and pushing, coupling /uncoupling etc for a distance every 1.0 Km or part there of and bringing the empty tubs to surface. (calculation sheet enclosed

57.56

-

215.16

... More
Unloading of all kind of building materials from tubs at destination in u/g and stacking the same

57.56

-

205.15

... More
Dismantling and transporting of 1000mm drive head (Double drive drum) with loop take up and all accessories (like as motor, gearbox, drive drum, girders, frame, chute & side plates etc) with lead of 100m/ up to track end.

7

-

63119.32

... More
Installation of 1000 mm drive head (double drive drum) with loop take-up & all accessories (like as motor, gearbox, drive drum, girders, frame, chute& side plates etc) including carrying manually from end of track in u/g and assembling the same as per instruction of Exe. In-charge

7

-

75235.6

... More
Part-B Material Cost (As per market Analysis Rate) Supply & stacking of materials at Bangwar UG Mine. Cement-

235

-

224.58

... More
Sand -

16.45

-

1032.54

... More
Stone Chips

32.89

-

1692.54

... More
Total impact of GST for the purpose of CTC

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.