Raja Ramanna Centre For Advanced Technology Tender
... More
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Raja Ramanna Centre For Advanced Technology - RRCAT Tender
Machinery and Tools
Eprocure
Opening Date4 Dec 2023
Closing Date29 Dec 2023
Tender Amount₹ 48,00,000
Costs
EMD
₹ 96,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_RRCAT_783785_1Bid Award Id
ViewTender No
RRCAT/CSD/W-4259/2024-25 /16 Dated 01/12Tender Authority
Raja Ramanna Centre For Advanced Technology ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
(2) Thorough examination of limit switches for all the three movements of crane and servicing & maintenance to ensure proper functioning of limit switches and the system. This shall include physical inspection of control and protection devices, control wiring checking & tightening, checking of earth connection etc. This shall also include verification of motor power circuit, performing Insulation Resistance (IR) measurements of motor as & when required.
-
-
-
... More
(3) Thorough examination of bearings for all the three movements of crane, greasing, servicving & maintenance, re-assembling and fixing properly the good bearings and replacing the worn out bearing.
-
-
-
... More
(4) Top -up, lubrication and general servicing of all gear boxes of a crane.
-
-
-
... More
(5) Greasing of rope drum and rope with rope compound.
-
-
-
... More
(6) Lubricating and greasing of all moving parts of the crane.
-
-
-
... More
(7) Thorough checking of electric supply of DSL of the crane & its contact parts, mechanical supports,wires etc.
-
-
-
... More
(8) Thorough checking of power supply status for all three movement including repair of control panels. Checking of the condition of contactors, relays, power cables, MPCB/MCB/fuses and replacement of the same, if required.
-
-
-
... More
(9) Thorough examination of rope, rope drum and crane hook and replacement of the same if worn out.
-
-
-
... More
(10) Thorough examination of crane pendent and replacement of the same if it is non functional.
-
-
-
... More
(11) Thorough examination of push buttons & indicating bulbs of the pendent and replacement of the same if these are not in working conditions.
-
-
-
... More
(12) Thorough examination of trolly girder, rails, cabins, crane stoppers,shock absorbers etc and carrying out riveting/welding as required.
-
-
-
... More
(13) All other servicings to ensure that the crane functions smoothly and effectively.
-
-
-
... More
(14) Field test to assure safe use of crane. Dead weights and fork lift with fork lift operator required for the field test for assuring safety shall be arranged by the department however contractor shall have to deploy necessary labour for the same.
-
-
-
... More
(15) Thorough cleaning of entire crane system including rails,girders,touching up of paint,marking in block capital letters depicting date of testing and 'SWL'.
-
-
-
... More
(16) Demonstration of successful acomplishment of servicing to RRCAT's authorised officials and incorporate suggested corrective measures if any within the perview of contract.
-
-
-
... More
(17) Maintaining log book issued by the department for each crane individually, showing details of routine maintenance,special maintenance, trouble shootings if any,details of part replaced,name of technicians/supervisors who carried out the job and who oversaw the job etc.
-
-
-
... More
Note: (1) The rate includes all taxes, surcharges,labour charges, labour cess,insurence,transport of tools & tackles,technician and labourers up to the work site, safety kit etc.
-
-
-
... More
(2) All liabilities related to various labour laws in force shall be borne by the contractor at his own cost.
-
-
-
... More
(3) The above item does not include cost of components to be replaced but includes labour charges of the same. The materials/parts as required shall be issued by the department at departments stores from where contractor shall make their own arrangement to bring the materials/parts up to work site.
-
-
-
... More
(4) Being maintenance contract, the quantities are tentative.
-
-
-
... More
5) The scope of work includes repair welding jobs but does not include removal of dents,replacement of girder,rail and structural steel work however contractor shall coordinate and cooperate with all other agencies carrying out some maintenance jobs /services in the vicinity which is not covered in this contract.
-
-
-
... More
6) The cranes may be physically inspected at site before furnishing the offer. Claim by the bidder on account of 'no or improper' pre-offer inspection shall not be entertained.
-
-
-
... More
7) This item includes the cost of all consumables required for smooth functioning of crane/ maintenance activity mentioned in the item or specifications however this will not cover the cost of the replacement of the components if required.
-
-
-
... More
For EOT cranes of capacity more than 5 (five) tonnes but less or equal to 10 ( ten) tonnes.
144
-
-
... More
For EOT cranes of capacity more than 3 ( three) tonnes but less or equal to 5( five) tonnes.
121
-
-
... More
For EOT cranes of capacity more than 2 (two) tonnes but less or equal to 3 (three) tonnes.
33
-
-
... More
For EOT cranes of capacity up to and including 2 (two) tonnes.
44
-
-
... More
For Mono rail cranes of capacity up to and including 3 (three) tonnes.
308
-
-
... More
For EOT cranes of capacity more than 30 (thirty ) tonnes but less or equal to 50 ( fifty) tonnes.
11
-
-
... More
Carrying load testing of the crane as per I S 3177 latest edition and AERB guidelines as and when informed and taking out measures as required for ensuring effective brake system for all the three movements of crane,efficient performance of limit switches, power units,all fuses,indicators,push buttons, reassembling of bearings,pendents etc including replacement if any, servicing of gear box,drum,rope, all moving parts,mechanical parts including rails,guides,welds etc complete and maintain the same to ensure proper functioning of brakes. Frequency of the load test shall be once in a year.Contractor should accordingly quote their rates.Dead weights and fork lift with fork lift operator required for the load test shall be arranged by the department however contractor shall have to deploy necessary labour for the same.Periodic inspection,preventive maintenance and servicing of EOT cranes of following capacity, at all heights, generally as per following steps including carrying out load test as per 3177 and AERB guidelines etc complete as per specifications and as directed by the Head Fire & Safety or his authorised representatives:
-
-
-
... More
NOTE: 1) Load testing of the crane shall be carried out as per I S 3177 latest edition and AERB guidelines
-
-
-
... More
2) Frequency of the load test as per this item shall be once in a year unless directed otherwise.
-
-
-
... More
3) Dead weights and fork lift with fork lift operator required for the load test shall be arranged by the department however contractor shall have to deploy necessary labour for the same.
-
-
-
... More
4) All maintenace work which become necessary in view of carrying out load test is included in this item which need to be carried out simultaneously. Contractor should accordingly quote their rates.
-
-
-
... More
5) Demonstration of successful acomplishment of servicing to RRCAT's authorised officials and incorporate suggested corrective measures if any within the perview of contract.
-
-
-
... More
6) Maintaining log book issued by the department for each crane individually, showing details of routine maintenance,special maintenance,trouble shootings if any,details of part replaced,name of technicians/supervisors who carried out the job and who oversaw the job etc.
-
-
-
... More
7) The rate includes all taxes,surcharges,labour charges, labour cess,insurence,transport of tools & tackles,technician and labourers up to work site, safety kit etc.
-
-
-
... More
8) All liabilities related to various labour laws in force shall be borne by the contractor at his own cost.
-
-
-
... More
9) The above item does not include cost of components to be replaced but includes labour charges of the same. The materials/parts as required shall be issued by the department at departments stores from where contractor shall make their own arrangement to bring the materials/parts up to work site.
-
-
-
... More
10) The scope of work includes repair welding jobs but does not include removal of dents,replacement of girder, rail and structural steel work however contractor shall coordinate and cooperate with all other agencies carrying out some maintenance jobs /services in the vicinity which is not covered in this contract.
-
-
-
... More
11) The cranes may be physically inspected at site before furnishing the offer. Claim by the bidder on account of 'no or improper' pre-offer inspection shall not be entertained.
-
-
-
... More
12) As load testing includes maintenance hence whenever this item is operated; item no 1 pertaining to general maintenance shall not be operated simultaneously.
-
-
-
... More
13) As load testing includes maintenance hence whenever this item is operated all other conditions and stages of work stipulated against item no 1 pertaining to general maintenance shall be applicable in this item also however no seperate payment is admissible for the same.
-
-
-
... More
14) This item includes the cost of all consumables required for smooth functioning of crane/ maintenance activity mentioned in the item or specifications however this will not cover the cost of the replacement of the components if required.
-
-
-
... More
For EOT cranes of capacity more than 5 (five) tonnes but less or equal to 10 ( ten) tonnes.
14
-
-
... More
For EOT cranes of capacity more than 3 ( three) tonnes but less or equal to 5 ( five) tonnes.
11
-
-
... More
For EOT cranes of capacity more than 2 (two) tonnes but less or equal to 3 (three) tonnes.
3
-
-
... More
For EOT cranes of capacity up to and including 2 (two) tonnes.
4
-
-
... More
For Mono rail cranes of capacity up to and including 3 (three) tonnes.
28
-
-
... More
For EOT cranes of capacity more than 30 (thirty ) tonnes but less or equal to 50 ( fifty) tonnes.
1
-
-
... More
Carrying out Hydrostatic Pressure testing of Pressure Vessels containing any type of fluid in reservoir/vessel under pressure in the design working pressure range of 1.5 bar to 60 bar, generally adhering to following steps complete as per specifications, ASME B 31.1/ ASME Section VIII, Division 1/ AERB guidelines or relevant codes and as directed by RRCAT:
-
-
-
... More
(1) Removal or isolate from the system including the compressor, air dryer, filters,instruments,all accessories, valves ,internal parts etc as required before commencing the testing to avoid damage caused by water during hydrostatic tests and re-install after successful completion of tests.
-
-
-
... More
(2) Through checking & removal of traces of all materials from inside in case of big vessels having manhole and then filling up of water.
-
-
-
... More
(3) Connect hose of Hydrostatic test pump to the vessel through flexible connections, hose assembly etc.
-
-
-
... More
(4) Apply a test pressure equal to ONE & HALF TIMES (1.5 times) of the Design working pressure sustainable for10 minutes .The testing pressure shall be applied gradually to achieve the required maximum pressure in one minute and than sustain the maximum pressure for 10 minutes.
-
-
-
... More
(5) Through checking of siphon tube, if any, nozzle, safety valve mounted/fitted on the vessels and all other parts to ensure their proper functioning at specified maximum pressure.
-
-
-
... More
(6) After the test remove all traces of moisture etc from the cylinders and make it fit for refilling.
-
-
-
... More
(7) After satisfactory completion of hydrostatic pressure test, blow systems dry with clean, oil-free compressed air, and test with clean, dry air at design working pressure. Brush joints with soapy water solution to check for leaks. Install a calibrated test pressure gauge in piping system to observe any loss in pressure. Maintain required test pressure for one hour to carry out final inspection of joints and connections.
-
-
-
... More
(8) The Master unit to be deployed for checking the pressure must not be older than TWO years and must have been calibrated and corrected before using it in RRCAT. Such calibration process must not be older than 30 days prior to use. Pressure guage used in pump shall be calibrated by NABL approved lab or Pressure guage OEM.
-
-
-
... More
(9) The tractor trolly duly filled with water shall be stationed at site till completion of work.
-
-
-
... More
Note: (1) The rate includes all taxes,surcharges,labour charges, labour cess,insurence,transport up to work site,royality,warantee,tools & tackles, safety kit testing etc complete.
-
-
-
... More
2) The cost of replacement of component IS NOT INCLUDED in this item however contractor shall bear the labour for removal and replacement of faulty components without raising any claim for the same.
-
-
-
... More
3) The job shall be carried out only at work places of RRCAT hence contractor is required to transport the set up in various buildings in RRCAT premises and after satisfactory servicing shall place the vessels in same position, all without raising any claim.
-
-
-
... More
(4) Keep the pressure vessel in a shielded place from safety point of view.
-
-
-
... More
(5) Follow all other precautions as stipulated in relevant ASTM/ASME/AERB and BIS codes.
-
-
-
... More
(6) It shall be mandatory for the contractor to make necessary entries in the inspection card which need to be put up for endorsement by authorized representative of the department. The sticker containing file no, firm's name and Tested OK or Tested NOT OK X need to be pasted firmly on the vessel.
-
-
-
... More
For pressure vessel up to 500 lit capacity
38
-
-
... More
For pressure vessel up to 501 lit to 1000 lt capacity
11
-
-
... More
For pressure vessel up to1001 lit to 2000 lt capacity
5
-
-
... More
For HP Tank of about 8000 Lt Capacity
1
-
-
... More
Carrying out Ultrasonic test for accurate measurement of thickness of Pressure Vessels containing any type of fluid in reservoir/vessel under pressure in the design working pressure range of 1.5 bar to 60 bar and calibration of gauge fixed in such vessels including testing of all safety valves generally adhering to following steps complete as per specifications, relevant ASTM/ASME/AERB or BIS code and as directed by RRCAT
51
-
-
... More
Supply & fixing of Spare parts for the EOT Cranes of capacity more than 2 (two ) tonns but less or equal to 50 (fifty ) tonnes installed at different location in Laboratory buildings and workshop buildings. including scaffolding, removing the existing component and staking the same at division's stores, testing to show proper performance all as per detailed specifications, standard operating procedures with total adherence to labour laws, contract conditions etc. and as directed by Engineer in Charge.
-
-
-
... More
In case of unsatisfactory quality of work, reduced rate shall be applied as per clause 16 of Section 5 of the tender. The decision of Engineer regarding reduced rate shall be final & binding.
-
-
-
... More
In case of non performance of work at any or all locations, recovery shall be made for non performance as per the quoted rate per number basis. In case of saving because of non existence of requirement question of recovery shall not arise.
-
-
-
... More
Magnetic Brake upto 1T capacity crane
1
-
-
... More
Magnetic Brake upto 2T capacity crane
1
-
-
... More
Magnetic Brake upto 2T to 5T capacity crane
1
-
-
... More
Magnetic Brake 6 to 10T capacity crane
1
-
-
... More
Magnetic Brake 11 to 50T capacity crane
1
-
-
... More
Magnetic Coil Break ; Drum OD 50mm to 75mm
1
-
-
... More
Magnetic Coil Break ; Drum OD 76 mm to 100mm
1
-
-
... More
Magnetic Coil Break ; Drum OD 101 mm to 150mm
1
-
-
... More
Crane duty bearing (ID 25 mm to 50 mm)
2
-
-
... More
Crane duty bearing (ID 51 mm to 75 mm)
2
-
-
... More
Crane duty bearing (ID 76 mm to 100 mm)
2
-
-
... More
Crane duty bearing (ID 101 mm to 150 mm)
1
-
-
... More
Crane duty bearing (ID 151 mm to 200 mm)
1
-
-
... More
Hydrolic Thruster Brake ; Drum OD 100mm to 150mm
1
-
-
... More
Hydrolic Thruster Brake ; Drum OD 151 mm to 200mm
1
-
-
... More
Hydrolic Thruster Brake ; Drum OD 201 mm to 250mm
1
-
-
... More
Hydrolic Thruster Brake ; Drum OD 251 mm to 300mm
1
-
-
... More
Rope Guide OD upto 6mm
1
-
-
... More
Rope Guide OD 7 mm to 10mm
1
-
-
... More
Rope Guide OD 11 mm to 15mm
1
-
-
... More
Rope Guide OD 16 mm to 20mm
1
-
-
... More
Current Collector
4
-
-
... More
Limit Switch (2 in 1)
2
-
-
... More
Radio Remote (wire less)
7
-
-
... More
PVC Wire rope for Pendent
20
-
-
... More
Wire Rope OD upto 6mm
8
-
-
... More
Rope OD 7 mm to 10mm
8
-
-
... More
Wire Rope OD 11 mm to 15mm
8
-
-
... More
Wire Rope OD 16 mm to 20mm
8
-
-
... More
Shaft, forged Material- EN24, Hardness 30 to 45 HRC
5
-
-
... More
Gears, forged Material-EN353, Hardness 40 to 50 HRC
5
-
-
... More
Couplings, Crane duty- Replaced by similar type
5
-
-
... More
Crane wheel , Material forged/Cast Steel, Hardness 250- 300 BHN
10
-
-
... More
DSL Buss bar (125 Amp 4 Bar RYB Green :GI
20
-
-
... More
Brake Liner
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements