Raja Ramanna Centre For Advanced Technology Tender

Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.

Raja Ramanna Centre For Advanced Technology - RRCAT Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date12 Feb 2024
Closing Date26 Feb 2024
Tender Amount₹ 97,50,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthwork excavation in foundations in soft rock by mechanical means (hydraulic Excavator)/manual means upto a depth not exceeding 1.5m below average G.L., including shoring and dewatering, if necessary and disposing of surplus excavated materials within a distance of 50 metre. All complete as per drawing, specifications & as directed by the Engineer-in-charge.

50

-

-

... More
Earthwork excavation over areas in all soils except soft and hard rock by mechanical means (hydraulic Excavator)/manual means and disposing off & levelling the soil within a distance of 50 metre. All complete as per drawing, specifications & as directed by the Engineer-in-charge.

10

-

-

... More
Lead charges, by mechanical transport to anywhere in RRCAT CAMPUS, including loading, unloading, stacking/levelling etc. All complete as per drawing, specifications & as directed by the Engineer-in-charge.

-

-

-

... More
For Soil

140

-

-

... More
Note: The rates in respect of item are applicable for the net quantities arrived at after making deductions for voids @ 20% in respect of soils and @ 50% in respect of rock from the corresponding stack/truck measurements.

-

-

-

... More
Taking out existing cement concrete interlocking paver blocks including bedding sand from footpath etc. including removal of rubbish etc., disposal of unserviceable materials to the dumping ground (Payment shall be made separately under relevant item) and stacking of serviceable materials within 50m lead complete as directed by Engineer-in-Charge.

45

-

-

... More
Dismantling the Mosaic/white glazed/Ceramic/Vitrified tiles /Kotah stone etc. in flooring/dado/skirting etc. including dismantling of bedding mortar, stacking of materials and disposing of debris within 50 metres lead etc. All complete as per drawing, specifications & as directed by the Engineer-in-charge.

55

-

-

... More
Demolishing plain cement concrete works by chiselling at all levels including scaffolding, disposal of materials within 50 metres lead etc. All complete as per drawing, specifications & as directed by the Engineer-in-charge.

10

-

-

... More
Demolishing Reinforced cement concrete works by chiselling at all levels including scaffolding, cutting of reinforcement bars by gas cutting, straightening & stacking of steel bars and disposal of unserviceable materials within 50 metres lead etc. All complete as per drawing, specifications & as directed by the Engineer-in-charge.specifications and as directed by Engineer-in-Charge.

5

-

-

... More
Demolishing brick work in cement mortar at all levels including scaffolding, stacking of serviceable materials and disposal of unserviceable materials within 50 metres lead etc. All complete as per drawing, specifications & as directed by the Engineer-in-charge.

5

-

-

... More
Labour Charges only for laying old cement cocrete interlocking paver blocks of any design/ shape laid in required line, level,curvature, colour and pattern over 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. Note:- 1) CC paver blocks shall be supplied by the department free of cost. The location of paver block kept in RRCAT shall be shown to contractor, contractor has to make arrangement for transportation to the site at their own cost. 2) The cost of sand shall be paid separately under relavant item.

45

-

-

... More
Supplying and filling in plinth with screened selected sand under floors, including watering, ramming, consolidating, finishing to level and dressing etc. All complete as per drawing, specifications & as directed by the Engineer-in-charge.

5

-

-

... More
Forming embankment with selected approved soil obtained from borrow pits (including cost of excavation & transportation within RRCAT campus by mechanical transport), in layers not exceeding 200mm thick including breaking clods, watering, consolidation, dressing the sides & top to the required profile & grade complete as per drawing, specifications & as directed by Engineer-in-Charge.

150

-

-

... More
Providing & laying in position Cement concrete 1:3:6 using graded stone aggregate 40 mm max. size including consolidating, finishing, curing etc. complete excluding formwork as per specifications. All complete as per specifications and as directed by Engineer-in-Charge.

15

-

-

... More
Providing & laying in position Design Mix REINFORCED CEMENT CONCRETE of M-25 grade at all levels using graded stone aggregate of 20mm max. size including machine mixing, transporting, weigh batching, mechanical vibration, consolidation, finishing, curing and cost of labour, machinary, and materials etc. complete as per specifications but excluding shuttering, formwork and steel reinforcement.(Minimum Cement content shall not be less than 387kg/cum of concrete.)

-

-

-

... More
In foundations, footings, plinth beams, base of columns, flooring.

70

-

-

... More
In columns, mullions, pillars, posts, struts

20

-

-

... More
Providing centering and shuttering at all heights using steel plates including strutting and propping etc. and removal of the same for in situ reinforced concrete and in plain mass concrete work as per drawings, specifications and as directed by Engineer-in-charge.

-

-

-

... More
Foundations, footings, base of columns, plinth beams, flooring, machine foundations, bed blocks, window cills, copings and mass concrete

200

-

-

... More
Columns, pillars, posts, struts, mullions etc.

130

-

-

... More
Providing and fixing reinforcement for reinforced cement concrete using TMT bars of preferred make having minimum yield strength of Fe 500 or higher grade as per IS:1786 at all levels including supplying, cutting, bending, fixing, tying in position with 1.6mm dia soft drawn annealed binding wire etc. All complete including cost of binding wire as per drawing, specifications and as directed by Engineer-in-Charge.

13

-

-

... More
Note :1 - The steel reinforcement bars shall be brought by the contractor at terms & conditions specified.TMT bars manufactured in the preferred brand shall only be permitted subject to furnishing of challans, valid test report issued by the manufacturer, pertaining to elongation,yield strength,Bend rebend test etc.

-

-

-

... More
2 - Random testing of sample collected at site shall be arranged by the contractor at their own cost.One sample comprising of three specimens shall be collected for every 25MT of bars brought at site .The representive of department shall associate with the engineer of contractor at each stage right from sampling of testing . All charges ,transport, taxes etc shall be borne by the contractor.

-

-

-

... More
3 - The contractor shall be solely respossible all the time for watch & ward of bars/binding wires etc at their own cost.

-

-

-

... More
4 - 1.60mm dia . Soft drawn annealed BINDING WIRE required for the work will have to be procured by the contractor at their own cost and will not be measured for payment .

-

-

-

... More
5 - Other conditions as stipulated in general condition, special conditions, additional conditions and specification shall also be applicable and no claim whatsoever on account of enforcing these provisions shall be entertained .

-

-

-

... More
Cement plastering to external surfaces of walls at all heights, 20mm thick, with cement mortar 1:4 over brick walls or concrete surfaces, including finishing rough (wooden float finish) hacking the concrete surfaces, double scaffolding wherever necessary, curing etc. All complete as per drawing, specifications & as directed by the Engineer-in-charge.

30

-

-

... More
Painting the exterior walls and roof with two coats of preferred make and approved shade including preparing the surface by removing loose dust and dirt with stiff brush and washing the surface with clean water, treating the surface with antifungal chemical wherever required, filling holes with putty, scaffolding and cleaning, tools & tackles, safety appliances etc. All complete as per drawing, specifications & as directed by the Engineer-in-charge.

30

-

-

... More
Design, supply and installing, Monsoon protected flame retardent high quality PVC coated membrane of 750 gsm (of Prefered make, Pre constraint 702 S2) with non weldable PVDF coating on top & weldable PVDF at bottom, with specified Warp and Weft strength & Tear resistance fabric to the existing steel frame work, including providing and fixing / using boundary cables – steel wire rope for proper shape and stiffning. The scope of work also includes making arrangement for drainage of rain water and all fittings ,accessories etc. complete as per drawing specification and as directed by the Engineer-in-Charge.

560

-

-

... More
Note :1 - Rate to include the cost of material, labour, tools, plants, transportation, wastage etc. to cornplete the work in all respect as per drawing and as directed by the Engineer-in- Charge.

-

-

-

... More
2 - The bidders are strongly encouraged to visit site at RRCAT to understand building design and their layout and associated technical requirements.

-

-

-

... More
3 - The tenderer have to furnish a three years onsite comprehensive warranty of the fabric used.

-

-

-

... More
4 - Mode of Measurements- Plan area cover by fabric in haozontal plan on ground shall be measured for payment.

-

-

-

... More
Providing, fabricating, cutting, erecting, and fixing in position structural steel works of any shape using RHS, SHS & circular hollow sections of Grade Yst 280 or higher as per relevent IS code at all levels including welding, painting with two coat of PU paint over a coat of approved steel primer and transportation etc. complete all as per drawings, specifications and as directed by the Engineer-in-charge. Note:1. Providing & fixing of steel cable/rope/rod/Tensile bolt for Foundation as required for work, shall be paid under this item. 2.The welding weights shall not be measured for payments but cost of same shall be included in the rate.

20

-

-

... More
Providing, fabricating, cutting, erecting, and fixing in position structural steel works of any shape using Structural steel M.S. plain & chequered plates at all levels including welding, painting with two coat of PU paint over a coat of approved steel primer and transportation etc. complete as per specifications and as directed by Engineer-in-Charge. (The welding weights shall not be measured for payments but cost of same shall be included in the rate.)

1

-

-

... More
Providing, fabricating, cutting, erecting, and fixing in position structural steel works of any shape using ISMBs, Joists, channels, angles, flats, Tees etc. of minimum grade Fe 250, at all levels including welding, painting with two coat of PU paint over a coat of approved steel primer and transportation etc. All complete as per specifications and as directed by Engineer-in-Charge. (The welding weights shall not be measured for payments but cost of same shall be included in the rate.)

1

-

-

... More
Note for item no. 20 to 22: 1. Structural steel conforming to IS: 2062 2. The contractor shall supply copy of Documentary evidence of purchase of steel, test certificates from the manufacturing firms and also testing from third party, if required to be arranged at no extra cost. 3. Welding weights, connections, bolts and nuts shall not be measured for payment but the cost of which shall be deemed to have been included in the rate. 4. All holes will be made by drilling only. Gas cutting of holes will not be permitted. 5. Electrodes manufactured by preferred brand only shall be used.

-

-

-

... More
Important Note

-

-

-

... More
Note - 1) The bidder must possess valid EPF & ESIC registration. The bidders need to deposit EPF & ESIC with appropriate authority. The reimbursement for EPF & ESIC deposit shall not be made. 2) The payment of wages to labourers should be made through bank. 3) The bidder must possess sufficient manpower & other resources (as detailed in SGF ) required for the timely completion of work.4) A land for the construction of contractor shade in RRCAT premises shall be provided for material storage and contractor has to make arrangement for temporary shade at the alloted space for the shade & same must be removed after the completion of the work at their own cost. If contractor is allow to use departmental constructed space, same shall be charge @ 500/- per Sqm per month and contractor has to handover the same in good condition after the storage use.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.