Public Works Department Tender

Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.

Public Works Department - PWD Tender

Works
Eprocure
Opening Date11 Jan 2019
Closing Date24 Jan 2019
Tender Amount₹ 2,45,06,368 
Notes
Download

Costs

Summary

Installation Of Mgps System Gas Manifold Central Compressed Air System In Teaching Hospital Associated With Govt. Medical College Datia Mp Pac Rs. 245.06 Lacs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Emergency manifold for Oxygen

4

18000

4500

... More
Main maniflod for Nitrous Oxide

8

36000

4500

... More
Emergency manifold for Nitrous Oxide

2

9000

4500

... More
Main Manifold for Carbon dioxide

2

9000

4500

... More
Emergency manifold for carbon dioxide.

2

9000

4500

... More
Control System

1

-

-

... More
Fully automatic Three port Control panel for Oxygen Supply, installation, testing and commissioning of Automatic manifold contorl panel would provides a duty or standby gas supply from two cylinder banks with automatic changeover the manifold indicates local status and has a remote indicator facility. automatic manifold control panel would be designed to supply the MGPS with a constant pressure supply via a control panel form two equal banks of cylinders and the changeover from the duty to the standby bank of cylinders would be automatic. automatic changeover fron the duty to the standby bank would occur at a cylinder pressure that will ensure the maximum usage of the contents of the duty bank. the changeover unit would be provided with monitoring to detect and display: duty bank operating, duty bank empty, standby bank operating, and standby bank below 10% when the duty bank is empty, reserve bank low pipeline pressure faulty. there would be facility to connect liquid oxygen supply (i.e. three port control panel) (It should be CE and ISO 13485 Certified)

1

455000

455000

... More
Fully automatic Three port Control Panel for Oxygen input pressure 150 kg/cm2 output pressure 4kg/cm2 capacity:1500LPM media:oxygen It should be Ce mark and with four digit number European notified body no. and country of origin certificate should be provided

1

-

-

... More
Fully-Automatic Control Panel for Nitrous Oxide input pressure 150kg/cm2 output pressure 10kg/cm2 capacity:500 LPM media:Nitrous oxide It should be CE mark and with four digit European notified body number and country of origin certificate should be provided

1

345800

345800

... More
Emergency Manifold Line Regulator Supply, installation, testing and commissioning of Emergency Manifold Line Regulator input pressure 150kg/cm1 working pressure 4kg/cm2 should be CE and ISO 13485 Certified.

1

-

-

... More
oxygen input pressure 150kg/cm2 working pressure 4kg/cm2 Capacity : 1500 LPM

1

22000

22000

... More
Carbon dioxide input pressure 150kg/cm2 output pressure 4kg/cm2 including heater Capacity : 1500 LPM

2

44000

22000

... More
Nitrous Oxide including heater capacity:500LPM

1

22000

22000

... More
Supply, installation, testing and commissioning of cylinder connecting pipe (pig tail) made up of Flexible SS hose with safety cord 5/8 inch BSP gland nut and one side 1/2 inch BSP internal threasds having one meter length. (Oxygen-24, N20-10,CO2-4)

38

152000

4000

... More
Gas outlet Front Loaded DIN/BS STD: Supply, installation, testing and commissioning of DIN/British standard Gas Outlets are for use with medical gas system. The gas outlets completely comply with HTM2002 and C11 standard regulations and pass the test of leakage and connector stability. Medical Gas outlet shall be gas specific for the services indicated and accept only corresponding DIN/British standard Quick Connect adanter. Specifically, Gas specific indexed to eliminate interchangeablility of gas services. The gas outlet is offered in console type, wall type with box and hose barb type gas system. it should be CE and ISO 13485 Certified. DIN/BIS std. Gas outlets feature and benefits: *Comply with HTM2002 and C11 standard regulations *Color coded according to ISO32 Color 100% pressure and leak tested *Full range of mountine options *Available in wall type with box, console type and hose barb type *Gas specific adapters It should be CE mark and with four digit number European/US and country of origin certificate should be provided

1

-

-

... More
DIN/British standard Quick Connect Adapter (safety probe)

1

-

-

... More
Oxygen

335

182910

546

... More
Nitrous Oxide including heater capacity:500LPM

18

9828

546

... More
Medical Air (4 bar)

99

54054

546

... More
Surgical Air (7 bar)

8

4368

546

... More
Vacuum

281

153426

546

... More
AGSS

8

4368

546

... More
CO2

4

2184

546

... More
Gas outlet Front Loaded DIN/BS STD.

1

-

-

... More
Oxygen

335

914550

2730

... More
Nitrous Oxide

18

49140

2730

... More
Medical Air (4 bar)

99

270270

2730

... More
Surgical Air (7 bar)

8

21840

2730

... More
Vacuum

281

767130

2730

... More
AGSS

8

21840

2730

... More
CO2

4

10920

2730

... More
Copper pipes

1

-

-

... More
Supply, installation, testing and commissioning of copper pipe used would be half hard drawn, tempered seamless phosphorous deoxidized, non-arsenical and degreased confirming to BS EN:13348. For copper and copper alloys seamless, round copper tubes for medical gases or vacuum. The supply of pipes would be accompanied with manufactures tes certificates for the physical properties of copper pipes and chemical composition. The Supply of pipes is further substantiated with inspection certificates from a third party by LLOYD/KITE/TUV

1

-

-

... More
Supply and Installation of Diameter 12mm O.D.X0.7 mm thick

1150

576150

501

... More
Supply and Installation of Diameter 15mm O.D.X0.9 mm thick

2535

1452555

573

... More
Supply and Installation of Diameter 22mm O.D.X0.9 mm thick

2695

2331175

865

... More
Supply and Installation of Diameter 28 mm O.D.X0.1.2 mm thick

4665

4669665

1001

... More
Supply and Installation of Diameter 42 mm O.D.X0.1.2 mm thick

165

292875

1775

... More
Supply and Installation of Diameter 54 mm O.D.X0.1.2 mm thick

745

1898260

2548

... More
Supply and Installation of Diameter 76 mm O.D.X0.1.2 mm thick

120

354960

2958

... More
Back Pressure Compensated Flow Meter Metallic body with Humidifier

1

-

-

... More
Supply, installation, testing and commissioning of Back Pressure Compensated [BPC] Oxygen flow meter body should be made of brass material dully chrome plated and graduated from 0-15 L/m on an expanded lower scale for precision setting at low flow and 5-15L/m for general use. The humidifier bottle should be made up of unbreakable polycarbonate/Polysulphone material and autoclavable at 1.2.1 degree Centigrade temperature. It should be CE and ISO 13485 Certificed.

327

506850

1550

... More
Digital Area Alarm

1

-

-

... More
Suppyl, installation. Testing and commissioning of Area Pressure Alarm Panel would be with digital display, closed circuit, self-monitoring type. The alarm would be designed to monitorthe line pressure in piping systems. It should be CE and ISO 13485 Certified.

1

-

-

... More
3 gas

5

121500

24300

... More
5 gas

4

118800

29700

... More
6 gas

2

62600

31300

... More
Area Valve Service unit

1

-

-

... More
Supply, installation, testing and commissioning of Area Valve Box should be made up of M.S. body with powder coated. In side fitting copper pipe with on/off valve and pressure gauge. Lockable cover with breakable glass so that during normal operation access has been by key but during emergency operation, access by breaking the glass panel. The unit should providea zone isolation facility. Gas flow direction should be indicated. It should be CE and ISO 13485 Certified.

1

-

-

... More
3 gas

5

60750

12150

... More
5 gas

4

64000

16000

... More
6 gas

2

38000

19000

... More
Line Shut off isolation Valve

1

-

-

... More
Supply, installation, testing and commissioning of The ball valves [for dividing the pipelines into various zones for the case of maintenance] the internal ball with full borne is made of stainless steel with Teflon seats. These valves are leak proof and needs only quarter turn for its operation [either fully open or fully closed]. It should be CE and ISO 13485 Certified.

1

-

-

... More
15 mm O.D

63

94500

1500

... More
22 mm O.D

62

200880

3240

... More
28 mm O.D

63

221130

3510

... More
42 mm O.D

8

38400

4800

... More
Conversion Kit for O.T. (3m Pipe) Supply, installation, testing and commissioning of conversion kit. It should have Safety plug on one end side and another side pin index according to specific gas and there should be standard 3mm long pipe in between those two ends. color coded, and made of food grade material & suitable for wirking pressure of minimum 10 bar & Vacuum to 710 mm hg. One end is pin index and the respective end diameter indexing with safety plug. It should be CE and ISO 13485 Certified Oxygen-8 Nitrous-8,

16

21600

1350

... More
High Pressure Tubing

1

-

-

... More
Supply, installation, testing and commissioning of Color coded, and made of food grade material & suitable for wirking. If should be CE and ISO 13485 Certified Pressure of minimum 10 bar & Vacuum to 710 mm hg.

1

-

-

... More
Oxygen

10

1100

110

... More
Nitrous Oxide

10

1100

110

... More
Air

10

1100

110

... More
Vacuum

440

48400

110

... More
CO2

5

550

110

... More
Central Compressed Air System

1

-

-

... More
Supply, installation, testing and commissioning of oil free compressor having following system: a. The medical air plant should be manufactured under an ISO 13485 qualify management system. B. The Duplex medical air plant should be provided with 15 HP motor each. Type of Compressor-Oil free air cooled compressor. Motor-15 HP, 50 Hz NO. of Stages-Two stages. Piston Displacement in CFM-36.66 CFM Outlet pressure-8.5kg/Cm2 c. Duplex air compressor system suitable for both continuous and frequnt start/stop operation d.Two compressors shall be designated as one running and one standby operating in Duplex or Cascade mode. e. commpressor body should be of Alumimum alloy. f. Duplex desccant heatless dryer of 100 CFM capacity shall be provided to reduce moisture content of the air. g. 2 Nos. of Air receiver should be provided with the capacity of 500 liters. h. Air Filtration system should be provided to supply medical quality it should be Ce and ISO 13485 Certified air for each system (Running & Stand by) Pre filter-Max Operating flow:60 cfm Max inlet pressure:16kg/cm2 Hsg. MOC-Aluminum die Casting Initial Pressure Loss 0.1 (kg/cm2) Element MOC-Borosilicate End Connection-1/2'' BSP After Filter- Hsg. MOC - Aluminum die Casting Initial Pressure Loss 0.1 (kg/cm2) Element MOC-Borosilicate End Connection -1/2'' BSP i. Separate pressure reducing system should be provided for each system (running & Stand by).

1

-

-

... More
Reciprocating Type Air Cooled Oil Free Air Compressors-2 Numbers

1

1865500

1865500

... More
Electrical Control Panel-1 Number

1

-

-

... More
Vertical Air storage tank with all accessories Capacity:500L-2 Numbers

1

-

-

... More
Air Dryer-100 CFM Desiccant type - 2 Numbers

1

-

-

... More
Air filters (3Stage) 1 micron, 0.1 micron, 0.01 micron with 1 inch end connection-2 Numbers

1

-

-

... More
Air Regulator (Pressure Reducing System)-2 Numbers

1

-

-

... More
Central Vacuum System

1

-

-

... More
Supply, installation, testing and commissioning of central vacuum pump a. Vacuum plant should be capable of running in Triplex mode depending on Hospital requirement (2 Running & 1 as stand by.) b. The medical plant should be manufactured under in ISO 13485 quality management system. c. The vacuum plant should comprise of 3 nos of motors of 10 HP Each. e. The plant should be fitted with filters. f. There should be a 2 no. of vacuum receiver of 2000 liters capacity. g. one bacterial filter with secretion bottle having end connection of 2inch. h. Electrical Control panel

1

-

-

... More
Vacuum pump with notor 10 HP (Two Running & one stand by) Electrical control panel Vacuum reservoir tank with safety accessories capacity:2000LFilter with Sceretion Tap Bottle

1

1164800

1164800

... More
Ward Vacuum jar with regulator capacity:600ml

201

395970

1970

... More
a. The suction regulator should incorporate an anti-bacterial filter, an anti over flow safety device, wide membrane continuous suctin controller and 600 m. polysulphone jar. B. Should have vacuum gauge fitted with a protective bumper device. C. Should have ON/OFF knob allowing quick readjustment of vacuum level. d. Must have central knob with 0-1000m bar/kpa range. e. jar with lid should be unbreakable and auto cleavable upto 134 deg C, must be transparent to ensure perfect sucked liquid visibility. Is Should be CE and ISO 13485 Certified.

1

-

-

... More
Low ward Vacuum jar with regulator for pediatric ward

72

622440

8645

... More
Vacuum jar trolley for O.T.

8

98280

12285

... More
AGSS

1

-

-

... More
Supply, installation, testing and commissioning of AGSS system should contain Duplex system having capacity of 2500 LPM each. These are dedicated low velocity exhaust system for Collection of excess gases from one or more Ors and discharged to the outdoors. The powerful side channel exhaust blower the unit very compact, reliable and createssufficient negative pressure, so that cross contamination does not occur in the other ORs connected to this system. It should consist of Balancer/receiver unit along with connecting hose for anesthesia machine to receiver and from outlet to receiver unit, AGSS hose assemblies, AGSS Remote Switch. AGSS central system is manufactured according to the regulatins of EN ISO 7396-2d. It should be CE and ISO 13485 Certified.

1

-

-

... More
Duplex AGSS Unit

1

560250

560250

... More
Balancer/receiver unit along with connecting hose for anesthesia machine to receiver and from outlet to receiver unit

1

50000

50000

... More
AGSS hose assemblies

8

96000

12000

... More
AGSS Remote switch

1

10000

10000

... More
Probe for AGSS outlets

8

5600

700

... More
Accessories

1

-

-

... More
Supply, installation, testing and commissionig of Bed head panels for Icu with electrical fitting (Aluminum Extruded with Powder Coating and Length of 1500 mm, having Provision for Gas Outlets & Electrical Switch & Socket) It Should be Ce marked and ISO 13485 certified. It should be effiecient, safe & Robust design in extruded aluminum section. It should have the Provision of gas outlets & Electricals as per requirement. The smooth surfaces, with acceptable colour choice should have an integrated rail system to mount accessories. Entire pipe line should run in continuous horizontal panels with no break for each unit & length as per area where it has to be installed.

37

592000

16000

... More
Operating & maintaining MGPS, Gas manifold & Compressed air system (Excluding gas supply & electric power supply) for 500 bedded hospital by deploying qualified (Diploma/ITI) technician, working 24/7 throughout the year to keep the system in readiness during defect liability period (DLP) after successfully completion & handing over the project. Period of this item can be extended with the mutual consent between employer & contractor.

3

2100000

700000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.