Public Health Engineering Department Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Public Health Engineering Department - PHED Tender
Civil And Construction
Excavation
Water Storage And Supply
Eprocure
Opening Date12 Feb 2024
Closing Date22 Feb 2024
Tender Amount₹ 14,47,040
Costs
EMD
₹ 28,942Document Cost
₹ 2,000Tender Fee
₹ 295
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PHED_332208_1Bid Award Id
ViewTender No
NIT No 42/2023-24/PHED/EE/T W Badnagar05Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://mptenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Drilling of perfectly vertical bore hole of 150mm dia upto the desired depth below ground level in all types of strata including all work pertaining to drilling such as transportation, installation and removal of drilling machine etc complete in intertrappean formations (collapsible strata between rocks) including charges for transportation and making all necessary arrangements etc, including loweing and fixing of 125mm nominal diameter (G.I. or UPVC) casing pipe.(From 108.00 m to 126.60 mm) .USOR ITEM NO. 21.8 pg no. 316
186
149358
803
... More
Drilling of perfectly vertical bore hole of115 m.m. diameter up to desired depth below ground level in all types of rocks including all works pertaining to drilling such as transportation, installation and removal of drilling machine etc. complete. (i) From 126.60 m to 180.00 m Depth below g.l..USOR ITEM NO. 21.2 pg no. 315
534
377538
707
... More
Providing and fixing of well cap on top of the tube well for protection ms cap 150 mm dia. 21.9.3 pg no. 316
10
3890
389
... More
Construction of 76 cm.x 76 cm x 40 cm. foundation block in 1:2:4 cement concrete for fixing the pedestal of Hand Pump including excavation, cost of material and labours etc. Complete Item No 23.3 Pg No 321
10
12500
1250
... More
Construction of cement concrete platform as per design around the hand pump in 1:2:4 cement concrete including excavation, centering, shuttering, cost of all the materials and labour and curing etc complete Item No 23.4 Pg No 321
10
39980
3998
... More
Construction of cement concrete drain as per design in 1:2:4 cement concrete including excavation, centering, shuttering, cost of all the materials and labour and curing etc complete Item No 23.6 Pg No 321
30
13260
442
... More
Construction of sokage pit of 70 cm dia. and 1.0 m deep including excavation, brick lining at top in 1:4 cement mortar, filling of broken bricks
etc. and cost of all the materials and labour and curing etc complete. Item No 23.10 Pg No 332
10
13590
1359
... More
Labour charges for installation of IndiaMark II Hand Pump with 30 meter long 32 mm dia. riser pipe assembly and all other accessories including transportation of Hand Pump from specified departmental stores to site. Item No 23.1 Pg No 321
10
13150
1315
... More
Add to item No.15 above for fixing the extra length of riser pipe assembly beyond 30 meters Item No 23.2 Pg No 321
300
8100
27
... More
Measurement of yield of tube well by operating hand pump continuously for four hours manually. Item No 24.4 Pg No 324
10
7060
706
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements