Public Health Engineering Department Tender

... More
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.

Public Health Engineering Department - PHED Tender

Works
Eprocure
Opening Date7 Jan 2019
Closing Date21 Jan 2019
Tender Amount₹ 17,52,577 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in excavation by mechanion by mechanical means (Hydraulic excavator)/ Manual means in over areas (exceeding 30 cm in depth 1.5 m in widht as well as 10 sqmon plan) including disposal of excavated earth leadupto 50 m and lift up to 1.5 m disposed earth to be levelled and neatly dressed 2.7.1. Ordinary rock SOR I.2.7.1 P.4 From 4.50 mt to 6.00mt. BGL.

-

-

183

... More
From 6.00mt BGL to 7.50 Mt. BGL

-

-

230

... More
From 7.5 BGL to 9.00 Mt. BGL

-

-

278

... More
From 9.00 0mt to BGL to 10.00mt BGL Excavation in or under water

-

-

366

... More
From 10.00 0mt to BGL to 10. 50 mt BGL

-

-

440

... More
From 10.50mt BGL to 12.00mt. BGL

-

-

527

... More
Earth work in excavation by mechanical means (Hydraulic exacavator) / manual means over areas (exceeding 30 cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of exacavated earth, lead upto 50 m and lift upto 1.5 m, disposed earth ,Hard Rock (Requiring Blasting Under water) From 12.00 mt BGL to 13.50 mt. BGL

-

-

575

... More
From 13.50 mt BGL to 15.00 mt. BGL

-

-

623

... More
From 15.00 mt BGL to 16.50 mt. BGL

-

-

671

... More
From 16.50 mt BGL to 18.00 mt. BGL

-

-

718

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level 4.1.1 With 20 mm nominal size graded stone aggregate 4.1.1.4 M.20,SOR P.15 I.4.1.4

-

-

4582

... More
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding induding cost of binding wire up to floor two level induding all wastage etc. complete. 5.16.3 Cold twisted bars (CTD)/ Themo mechnically Treatebed bars (TMT)

3400

-

57

... More
Centering and shuttering induding strutting, propping etc. and removal of form for: 5.9.2. wassl (any thickness) including attached pilasters butteresses plinth beams and string courses etc up to plinth level, in cicular work or any other geometrical shape .

-

-

259

... More
Reinforced cement concrete work in walls (any thickness) including attached pilasters buttresses plinth and string courses fillets columns pillars posts and struts suspended floor roof slab beams etc up to floor two level excluding cost of centering shuttering finihsing and reinforcement . From 17.70 Mt BGL to 1.50 Mt above GL(17.70 to16.50)

-

-

-

... More
(16.50 to15.50)

-

-

-

... More
(15.50 to14.50)

-

-

-

... More
(14.50 to13.50)

-

-

-

... More
(13.50 to12.50)

-

-

-

... More
(12.50 to11.50)

-

-

-

... More
(11.50 to10.50)

-

-

-

... More
(10.50 to 9.50)

-

-

-

... More
(9.50 to 8.50)

-

-

-

... More
(8.50 to7.50)

-

-

-

... More
(7.50 to6.50)

-

-

-

... More
(6.50 to 5.50)

-

-

-

... More
(5.50 to4.50)

-

-

-

... More
(4.50 to3.50)

-

-

-

... More
(3.50 to2.50)

-

-

-

... More
(2.50 to1.50)

-

-

-

... More
(1.50 to 0.50)

-

-

-

... More
(0.50 to G.L.)

2.88

-

4682

... More
1.50 M Above G.L.

8.68

-

4682

... More
5.2.1 M.20 nominal mix (with 20 mm nominal size graded stone aggregate) Plateform 1.00 m wide .

9.16

-

4682

... More
Filling available excavated earth (exduding rock) in trenches, plinth, sidea of foundations etc, in layers not exceeding 20am in depth, consolidafing each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.

-

-

65



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.