Public Health Engineering Department Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Public Health Engineering Department - PHED Tender
Civil And Construction
Excavation
Eprocure
Opening Date22 Feb 2024
Closing Date7 Mar 2024
Tender Amount₹ 5,61,041 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 11,221Document Cost
₹ 2,000Tender Fee
₹ 295
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PHED_335268_1Bid Award Id
ViewTender No
111/21.02.2024Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://mptenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
(PHE USOR wef 01.09.2023 it No. 15.15 Page No. 258) Demolishing Brick work in lime or cement mortar in any mix including stacking of serviceable material and disposal of unserviceable material with in 50 meter lead as per direction of engineer-in-charge. (In cement mortar)
20x[{1.66x1.36x0.42}-{1.20x0.90x0.42}]=9.9cum
9.9
7326
740
(PHE USOR wef 01.09.2023 it No. 15.40.2 Page No. 262) Brick work with well burnt chimney bricks having crushing strength not less than 25 kg/cm² and water absorption not more than 20 % in foundation & plinth i/c curing etc. complete. iii. In Cement Mortar 1:5
20x[{1.66x1.36x0.90}-{1.20x0.90x0.90}]=21.17cum
21.17
131804
6226
(PHE USOR wef 01.09.2023 it No. 15.6.1 Page No. 257) 12mm thick cement plaster in single coat including finishing even, smooth and curing complete. (ii) 1:4(Cement 1: Sand 4)
outer wall =20x2x(1.66+1.36)x0.90= 108.71 sqm
Internal wall= 20x2x(1.20+0.90)x0.90=75.6 sqm
181.31
34448
190
(PHE USOR wef 01.09.2023 it No.29.21.1 Page No. 376)Replacement of M.S. Foot rests in manhole including dismantling concrete block and fixing with 20x20x10 cm C.C. blocks of 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size)
48
14832
309
(PHE USOR wef 01.09.2023 it No. 15.24 Page No. 259) Providing & Fixing of stone slab 30 mm thick in cement mortar 1:6 (1 cement 6 sand)
20x2x0.35x1.10 = 15.40 sqm
15.4
2849
185
(PHE USOR wef 01.09.2023 it No29.25.5 Page No.377) Providing & fixing of ISI marked pre cast reinforced cement concrete manhole cover including frame and transporting at site, cost of all material etc. 560 mm dia heavy duty
22
63866
2903
(PHE USOR wef 01.09.2023 it No. 15.30.1.4 Page No. 260)Providing & laying mechanically mixed cement concrete 40 mmgraded crushed stone excluding cost of centering & shuttering. In Plinth & foundation 1:2:4 (M-15)
D.P.C. above top of C/R Brick wall
20{1.66x1.36x0.15}-{1.20x0.90x0.15}]=3.50cum
C.C. for rep. of channels
20X1.20x0.75x0.20 = 3.60 cum
C.C. around M.H. chamber on top of MH 20X[(1.70X1.40X0.15)-(0.785X0.56²X0.15)]= 6.40cum
Total = 14.87cum.
13.5
70551
5226
(PHE USOR wef 01.09.2023 it No. 15.12 Page No. 258) Filling available excavated earth in trenches, lead up to 50m and lift up to 1.5m in all kind of soil excluding watering and ramming .
53.86
1669
31
(PHE USOR we 01.09.2023 it No. 29.27.2 Page No.377) Lifting & Placing of manhole cover during cleaning of chocked sewer line & manhole. 560 mm dia
65
2665
41
(PHE USOR we 01.09.2023 it No. 29.31.1 Page No. 377) Making arrangement for dat (plugging of sewer) including all required material such as steel plate, manila rope, gunny bags, earth etc. or by and other plugging device with all required T & P and safety equipment including dewatering. (A) Depth upto 1.5 m (i) 100 mm dia
75
51150
682
(ii) 150 mm dia
28
27748
991
(iii) 200 mm dia
15
14910
994
(PHE USOR wef 01.09.2023 it No.29.32.1 Page No. 380) Cleaning of Silt, sludge brick bats, polythene bags, garbage etc. from chocked sewer manholes / sewer drains & Nallahs/ wet well of SPH/ Anaerobic & Facultative Pond of STP with all required T&P such as bucket, manila rope, and all required safety equipment such as safety belt, gas mask, oxygen cylinder etc. including disposal of silt/ sludge upto 50 mtr lead & 1.5 mtr. lift as directed by Engineer-in-Charge including dewatering but excluding dat plugging of sewer pipe line) 100 mm dia to 300 mm dia.
Depth up to 1.5 mtr ( normal fond)
65X1.20X0.90X0.78 = 54.75 cum
54.75
30112
550
(PHE USOR wef 01.09.2023 it No.29.33 Page No. 380) Cleaning of Silt, sludge brick bats, polythene bags, garbage etc. from chocked sewer line with all required T&P and Safety equipment such as bucket, manila rope, safety belt, gas mask, oxygen cylinder etc. including disposal of silt, sludge upto 50m lead & lift up to 1.5mtr. as directed by Engineer-in- Charge including dewatering but excluding dat (plugging of sewer pipe line) (A) Depth upto 1.5 mtr.(i) 150 mm dia (25.7.1)
1300
66300
51
(ii) 200 mm dia (25.7.2)
200
12400
62
(PHE USOR wef 01.09.2023 it No.29.35.8 Page No. 383)
Carriage of desilted sludge & other material from sewage components by mechanical transport including loading unloading & stacking etc. Distance uptp 20 km
43.8
9329
213
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements