Northern Coalfields Limited Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Northern Coalfields Limited - NCL Tender
Eprocure
Opening Date21 Jan 2021
Closing Date12 Feb 2021
Tender Amount₹ 19,60,761 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_NCL_194137_1Bid Award Id
ViewTender No
NCL/Block-B/SO(C)/20-21/ETN/34 dtd 21.01.2021Tender Authority
Northern Coalfields Limited ViewPurchaser Address
-Website
http://http://nclcil.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly leveling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure).
1820
-
45.85
... More
Supplying and stacking of good earth at site including royalty and carriage upto 5 km complete (earth measured in stacks will be reduced by 20% for payment).
450
-
332.55
... More
Supplying and stacking at site dump manure from approved source, including carriage upto 5 km complete (manure measured in stacks will be reduced by 8% for payment) :
-
-
-
... More
Screened through sieve of I.S. designation 20 mm
225
-
170.7
... More
Rough dressing the trenched ground including breaking clods.
3030
-
0.9
... More
Fine dressing of the ground.
3030
-
2.15
... More
Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge
675
-
21.35
... More
Providing Circular Cement Concrete pots of specified size, cast with cement concrete of nominal mix 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 6 mm nominal size), reinforced with 7 Nos ( 3 nos horizontal & 4 nos vertical “ U “ shape) M.S. wires of 3.5 mm dia as per design, including required form work, finishing with cement punning on exposed surface, curing for specified period and stacking in required rows & height, all complete as per direction of Officer-in-charge.
-
-
-
... More
Top inside dia 30 cm, outer bottom dia 20 cm, total height 30 cm with wall thickness of 25.4 mm
100
-
112.2
... More
Providing & laying Selection no. 1 grass turf with earth 50mm to 60mm thickness on existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same, as per direction of officer in charge
3030
-
77
... More
Topairy cutting/shapping of plant removing of cut materials, cleaning, hoeing of plants complete design hoeing of trees (Topairy) watering manure etc.(excluding the cost of material which shall be supplied by the department) and as per direction of officer in charge as per direction of officer in charge.
-
-
-
... More
Height of Topairy upto 120 cm.
960
-
49.15
... More
Height of Topairy above 120 cm.
1200
-
62.05
... More
Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, hedge, flower beds, foliages, creepers etc. including hoeing,weeding pruning replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover and brush cutter , removal of garden waste, applying insecticide, pesticide & fertilizers(whenever required) top dressing of lawn with good earth and menure and maintenance of other garden related works as directed by office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide , Pesticide will be provided by the Department & lawn mover and brush cutter with fuel , other T & P material/articles shall be provided by the contractor.)
-
-
-
... More
Permanent office accommodation. (as per yard stick 1Mali =1.25Acre)
50040
-
2.25
... More
MPs accommodation and Govt. officers bungalows. (as per yard stick 1Mali =1.55Acre)
10177
-
1.8
... More
Play grounds / Public parks (as per yard stick 1Mali =2.00Acre).
270575
-
1.4
... More
Open spaces(as per yard stick 1Mali =3.00Acre).
133752
-
0.95
... More
Maintenance of Potted Plants at Nursery in Earthen pot including resetting/ displaying at Nursery, including watering, weeding, hoeing, colouring, transplanting the damaged pots and disposal of generated garbage at specified place as per direction of officer-in-charge. (Good earth, manure, fertilizer, insecticide & pesticide shall be provided by the department) (For Earthen pot 3000 Nos)
16900
-
3.7
... More
Maintenance of potted plant Earthen pot in displayed at ground floor only in bungalow,office complex including application of good earth, manure, insecticide, pesticide and fertilizer, removing of dry parts by pruning, cleaning dry leaves and displaying in appropriate place and replacement of broken pots coloring of pots and change of location of pots and replacing with fresh plants as and when required ( Materials shall be provided by the department) as per direction of officer in charge (For Earthen pot 750 Nos)
14400
-
14.8
... More
Maintenance of potted plants Cement pots at ground floor in flats and ground floor bungalow,office complex including application of good earth, manure, insecticide, pesticide and fertilizer, removing of dry parts by pruning, cleaning dry leaves and displaying in appropriate place and replacement of broken pots coloring of pots and change of location of pots and replacing with fresh plants as and when required (Materials shall be provided by the department) as per direction of officer in charge (For of Cement pots 300 Nos)
3600
-
37.05
... More
Supply of different varieties of saplings & plants
-
-
-
... More
Dehaliya
2000
-
9.75
... More
Guldawadi(HiB)
1500
-
9.75
... More
Marigold
2000
-
8.53
... More
Pansy(HiB)
500
-
14.64
... More
Saviya(HiB)
500
-
9.75
... More
Acrocarya (10" to 12")
80
-
182.94
... More
Cycus (2 years)
30
-
518.32
... More
Rose
200
-
34.14
... More
Caroten(Duck foot)
50
-
60.98
... More
Caroten(Ordinary)
50
-
54.88
... More
Caroten(Baby)
50
-
48.78
... More
Arica Palam (3 to 4 sticks size 3" to 4")
150
-
97.57
... More
China palm
50
-
48.78
... More
Silver star
50
-
79.27
... More
Pansutia
20
-
73.17
... More
Supply of various varieties of seeds of seasonal flowers & vegetables
-
-
-
... More
Supply of good quality of seeds of flower (ordinary)
200
-
7.62
... More
Supply of good quality of seeds of flower (Hybrid)
200
-
42.69
... More
Painting of flower pots as per instructions of EIC
-
-
-
... More
Earthen pots of 12" size with colour/terracotta
8000
-
2.19
... More
Mosaic pots of 15" size with enamel paint of approval brand
1500
-
7.75
... More
Planting different varieties of sampling plants including making earth pits, mixing of earth & manure (cost of earth & manure shall be paid separately) etc. all complete with tools & plants as per instruction of EIC
-
-
-
... More
On Ground
3300
-
2.82
... More
In Pots
4000
-
3.53
... More
Supply at site good quality pots
-
-
-
... More
Earthen pots of 12" size
300
-
68.3
... More
Supply of fertilizer insecticide and pesticide
-
-
-
... More
DAP
500
-
39.49
... More
Urea
500
-
15.69
... More
Bonemeal
100
-
58.08
... More
Rose Mixture
50
-
80.14
... More
Neem Cake
50
-
54.59
... More
Melathion
10
-
777.04
... More
Roger 30%
5
-
782.85
... More
Sarso Khalli
80
-
22.66
... More
Cleaning, mopping and washing of floor of public buildings and other places neatly with detergent /bleaching powder etc. all complete with tools tackles and consumable to make the floor clean and hygeininc as per instruction of EIC.
1077950
-
0.46
... More
Total impact of GST for the purpose of CTC
1
-
586468.89
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements