North Central Railway Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
North Central Railway - NCR Tender
Civil And Construction
Civil Works Others
Railway
Ireps
Opening Date4 May 2022
Closing Date15 Jun 2022
Tender Amount₹ 40,54,23,547
Costs
EMD
₹ 21,77,100Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Gwalior-jhansi:- Provision Of Normal Height Subway (rubs) By Box Pushing Technique In Lieu Of 05 Nos
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
Br-JHS-2022-01Tender No
Br-JHS-2022-01Tender Authority
North Central Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supplying fabricating and erecting welded and/or bolted and/or riveted steel work in built up sections, trusses and framed work, staging, racks etc.for Steel Structures other than bridge girders, using RSJ, 4 tees, angles and channels/flats, plates, gussets, round or square bars, cleats, bolts etc., with contractors own steel including cutting, bending, straightening, drilling, riveting, hoisting, fixing, erecting, welding, bolting etc., with Providing stiffeners wherever required as per approved drawing including applying a priming coat of a approved steel primer with all contractor's materials, labour, tools & plants, lead & lift including crossing of tracks if required etc., complete as per specification and as directed by Engineer-in-charge.
112
76366
8082649.41
... More
Providing & laying non pressure NP-4 Class RCC pipe with collars, jointing with 1:2 cement and 5 ordinary sand mortar including testing of joints, but excluding earthwork with all labour and material as a complete job. Cement for mortar will be paid separately.(Pipes of 600mm dia and above will be laid using crane/hydra). 600mm dia.
150
2567
363936.04
... More
Providing and laying in position machine batched, machine mixed and machine vibrated Design Mix Cement Concrete of specified grade (Cast in-Situ) using 20mm graded crushed stone aggregate and coarse sand 6 of approved quality for the following Reinforced cement concrete structural elements up to height of 10 m from foundation top level, including finishing, using Admixtures in approved proportions (as per IS:9103), to modify workability & other properties without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Payment for cement, reinforcement, shuttering shall be paid extra. Wing wall and Return wall
3400
2719
8737914.15
... More
Providing and laying in position machine batched, machine mixed and machine vibrated Design Mix Cement Concrete of specified grade (Cast in-Situ) using 20mm graded crushed stone aggregate and coarse sand 7 of approved quality for the following Reinforced cement concrete structural elements up to height of 10 m from foundation top level, including finishing, using Admixtures in approved proportions (as per IS:9103), to modify workability & other properties without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Payment for cement, reinforcement, shuttering shall be paid extra. Approach slab at formation level, Dirt wall/ ballast wall at formation level
5400
2595
13247030.79
... More
Providing and laying in position machine batched, machine mixed and machine vibrated Design Mix Cement Concrete of specified grade (Cast in-Situ/Pre-cast) in bottom/top slab, side walls, toe wall and sumps 8 haunch filling head walls or any other component using 20mm graded crushed stone aggregate and coarse sand of approved quality of RCC box of any size including finishing, Admixtures in approved proportions (as per IS:9103), to modify workability & other properties without impairing strength and durability, complete as per drawings and technical specifications as directed by Engineer in charge. Payment for cement, reinforcement and shuttering shall be made extra.
800
2719
2055979.8
... More
centering and shuttering including strutting, propping etc. and removal of form for : All types of bridge sub-structures, e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. upto 5m above ground level
12800
602
7291226.88
... More
Providing and laying Pitching with Stone Boulders, weighing not less than 35kg each with voids 10 filled with cement sand mortar 1:4 on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical Specifications (filter media to be paid separately under the relevant item). Rate is excluding cost of cement which shall be paid extra under relevant item.
300
3648
1034304.39
... More
Supply and laying of quarry dust including consolidation, supply of all materials, labour, lead, lift, tools, plants, crossing of tracks as per drawing and technical specification as directed by the Engineer in charge in case loose slush is encountered at site of foundation before casting the foundation or laying the filtering media.
550
1019
529968.29
... More
Grouting of masonry/concrete by injection process duly Sealing of cracks, through nipples complete as per Technical Specification and procedure given in IRBM Para No 209 including necessary admixutre. (Cement wil be paid extra) Neat Cement Grout with 20% anti shrinkage compound w.r.t. cement.
22000
296
6166106.1
... More
Grouting of masonry/concrete by injection process duly Sealing of cracks, through nipples complete as per Technical Specification and procedure given in IRBM Para No 209 including necessary admixutre. (Cement wil be paid extra) Epoxy Grout
1500
1187
1683890.78
... More
Providing and laying of filter media consisting of granular materials of GW, GP, SW groups as per IS:1498 (latest) in required profile behind boulder filling of abutments, wing walls / return walls etc. above bed level with all labour and material complete job as per drawing and technical specification of RDSO Guidelines.
660
2535
1581653.3
... More
Dewatering of natural or accumulated water from any location. Payment to be done for Horse power of pump multiplied by pumping hours.
2600
-
5.5
... More
Cutting / cropping of rail of 60Kg - 90 UTS, manually and perfectly vertical with contractor's labour, 16 hacksaw blade and tools & plants - NOTE: 1.Manual cutting should be used only in emergencies with prior permission of sectional ADEN where machine cutting can not be arranged in time. 2. Cutting of Rails with blade and forcing to part by using other means to break the rails is prohibited. 3.Rails should be cut right through hacksaw blades only. In-situ situation
50
550
26013.96
... More
Drilling of hole in rail of any section and any UTS, manually (in emergencies only) with contractor's labours, tools & plants, consumables etc. for - Hole of dia. 25mm and above
410
221
85862.79
... More
Running out / Putting of railway's stone ballast from existing stacks available along alignment either 18 on top of cutting or on formation or at toe of bank by head leads or by any other means and spreading to the required profile with contractor's labour, tools & plants, as directed by Engineer in-charge. {Payment shall be made based on ballast stack measurement} For lead upto 50m and lift up to 5m
1200
113
128391.48
... More
Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of 19 bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil upto a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also. like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines All kinds of soils
18500
174
3052094.85
... More
Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the 20 layers by ramming and watering etc. including all lift, disposal of surplus soil upto a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also. like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines Ordinary rock
5400
361
1846214.37
... More
Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the 21 layers by ramming and watering etc. including all lift, disposal of surplus soil upto a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also. like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines Hard rock (blasting prohibited ) Track 131031 1161.00 113.92 132261.12 (-) 5.50 124986.76
3000
998
2829953.7
... More
Maintenance of track on main line & loops, Points & crossings etc. including special attention to section for carrying out various maintenance works listed in Indian Railways P.Way Manual / Bridge Manual / LWR 23 Manual for safe running of goods and passenger trains with contractor's tools / labours etc. complete, as directed by Engineer in-charge. {Note : (1) Contractor shall arrange one gang at any point of time comprising of minimum 20 labours with sufficient experience in P.Way working and one P.Way Supervisor. (2) In case, contractor provides less no. of Labour / Supervisor, payment will be deducted @ 10% of the accepted rate per person} Track
150
14717
2086178.69
... More
Hiring of JCB/Hitachi for levelling and dressing ground/dismantling structures ,Removal of jungle, clearing of earth, lowering high cess etc., along side the track between up and down lines obstructing drainages of 25 rain water, clearing of bushes obstructing visibility at curves and Level Crossings with all lead and lift etc. complete and as directed by the Engineer-in-charge .All labour, tools and plants consumables stores including supply of JCB/Hitachi with crew to be provided by the contractor at his own cost. The contractor shall arrange road permit for vehicle for all the States of operation, as per instructions of engineer in-charge and vehicle shall not be more than three years old. Payment shall be made for actual working hours at site.
150
1284
182066.54
... More
MASONRY WORK // Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : // Cement mortar 1:4 (1 cement : 4 coarse sand)
300
7809
2342775
... More
STEEL WORK // Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. // Hot finished welded type tubes
275000
143
39448750
... More
STEEL WORK // Providing and fixing mild steel round holding down bolts with nuts and washer plates complete.
6000
83
503100
... More
ROOFING // SHEET ROOFING // Extra for providing and fixing wind ties of 40x 6 mm flat iron section.
4500
151
679950
... More
FINISHING // CEMENT PLASTER (IN FINE SAND) // 20 mm cement plaster of mix : // 1:4 (1 cement: 4 fine sand)
1200
365
438300
... More
FINISHING // EXTERIOR FINISHING // Finishing walls with water proofing cement paint of required shade : // New work (Two or more coats applied @ 3.84 kg/10 sqm)
8000
91
730000
... More
FINISHING // Painting with aluminium paint of approved brand and manufacture to give an even shade . // Two or more coats on new work
8000
112
898000
... More
ROOFING // Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion. // Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) 34 total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
10425
627
6542208.75
... More
RAIN WATER HARVESTING & TUBEWELLS // Boring/drilling bore well of required dia for casing/ 35 strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer -in-charge, beyond 90 metre & upto 150 metre depth below ground level. // All types of soil // 400 mm dia
400
896
358600
... More
RAIN WATER HARVESTING & TUBEWELLS // Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & 36 machineries required for the job, all complete as per direction of Engineer -in-charge, beyond 90 metre & upto 150 metre depth below ground level. // Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe of required dia, conforming to IS: 12818, including required hire and labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer -in-charge. // 200 mm nominal size dia
350
1066
373117.5
... More
RAIN WATER HARVESTING & TUBEWELLS // Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, 37 preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer -in-charge, beyond 90 metre & upto 150 metre depth below ground level. // Gravel packing in tubewell construction in accordance with IS: 4097, including providing gravel fine/ medium/ coarse, in required grading & sizes as per actual requirement, all complete as per direction of Engineer-in-charge.
150
1497
224655
... More
RAIN WATER HARVESTING & TUBEWELLS // Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer -in-charge, beyond 90 metre & upto 38 150 metre depth below ground level. // Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by "V" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge.
120
857
102912
... More
Supplying and stacking of 65 mm gauge machine crushed track ballst confirming to Railway 39 specification IRS-GEI, June 2004 with latest correction slips as directed at indicated places at defence yard Jhansi with contractors labour, tools, plants & amchinery complete including all lead & lift, taxes, royalty charges and duties for complete job as directed by engineer in charge. (a) Cost of ballast
1
-
1.6
... More
Supplying and stacking of 65 mm gauge machine crushed track ballst confirming to Railway 40 specification IRS-GEI, June 2004 with latest correction slips as directed at indicated places at defence yard Jhansi with contractors labour, tools, plants & machinery complete including all lead & lift, taxes, royalty charges and duties for complete job as directed by engineer in charge. (b) Cost of labour including transportation, loading, unloading & stacking etc.
1
-
1.6
... More
Design casting & jacking RCC box (minimum grade of concrete M35) as per approved Drawing below railway track under running traffic conditions by box pushing technique in all type of strata including, providing RCC Thrust bed , casting of Box, suitable epoxy coating on the wall and top slab and pushing of Box with contractor design includiing all tools and Plants, providing drag sheet if required provided intermediate jacking point if required , dewatering including all temporary arrangements to carry out the work in the safe condition, 41 making joints of Box watertight with the help of epoxy or suitable material with contractor men, machinery and material including cement (OPC 43 Grade) & reinforcement steel required for carrying out the work etc complete in all respect. in the present base appr. size of Box is taken as 5.0x4.50 M inside dimension. Note:- (i) Locations of Thrust bed will be decided by Engineer In charge in view of the safety of running tracks and other expect. (ii) Mode of Payment (a) On casting of Thrust bed 15% of the item (b) On casting of RCC Box 50% (c) On pushing of Boxes under the Railway embankment/track as per the approved design and drawing 30% (d) On completion & finishing remaining 5%.
2
-
1.6
... More
Fabrication of rail cluster with Railway's 52 kg/60 Kg SH/US rails and contractor's fuel, equipment 42 and labour etc, erection, fixing in position for supporting and protection of running track during pushing of precast RCC box and removal of the same after completion of site . The rate includes cutting of rail, fixing of rail in position & removal of the same with contractor's all machinery, labour, fuel, tools and plants and other equipment's as per requirement, all applicable taxes and charges.
3
173926
1690560.72
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements