NHDC Limited Tender

Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.

NHDC Limited - NHDC Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date21 Jan 2025
Closing Date12 Feb 2025
Tender Amount₹ 38,94,915 
Notes
Download

Costs

Summary

Construction Of Boundary Wall Of Community Health Center Killod, Block Killod, Distt. Khandwa Under Csr Of Omkareshwar Power Station

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position specified grade of reinforced cement concrete (nominal / design mix with 20mm nominal size graded stone aggregate) excluding the cost of centering,shuttering, finishing and reinforcement -All work up to plinth level : M-20 Grade Concrete

75.59

-

554312.81

... More
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding including cost of binding wire all wastages and overlaps, couplers (overlaps shall be provided as per requirement of IS 13920 for ductile detaling IS 456 RCC Design & SP 34 Reinforcement detailing ) etc. complete . (Note:- 1. Spacer bars (chairs) shall be paid separately as shown in the drawing and as per direction of engineer in charge. 2. No extra payment shall be done for overlaps and/or couplers. 3. Couplers shall be conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”) Thermo-Mechanically Treated bars. FE 500 D or more conforming to IS 1786

9230.4

-

880026.34

... More
:Centering and shuttering in cluding strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for concrete upto plinth level

263.86

-

59938.44

... More
Centering and shuttering in cluding strutting, propping etc. and removal of form for: Walls (any thickness) in cluding attached pilasters butter esses, plinth beams and string courses etc up to plinth level.

300

-

78300

... More
Filling available excavated earth (excluding hard rock/Ordinary rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. Filling available excavated earth in footing.

141.79

-

16053.46

... More
Reinforced cement concrete work (with 20 mm nominal size graded stone aggregate) in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, posts and struts etc. above plinth level and upto floor two level excluding cost of centering, shuttering, finishing and reinforcement: M20 Grade Concrete

26.97

-

200282.19

... More
Centering and shuttering in cluding strutting, propping etc. and removal of form for: Lintels, beams, girders, bressumers and cantilevers

99.4

-

42173.43

... More
Centering and shuttering in cluding strutting, propping etc. and removal of form for: Columns, Pillars , Piers, Abutments, Posts and Struts

283.9

-

159429.72

... More
Brick work with fly ash lime bricks (FALG Bricks) conforming to IS:12894-2002, in super structure above plinth level up to floor two level in :Having 50 kg / cm2 average compressive strength. Cement mortar 1:6 (1 cement : 6 sand)

151.95

-

893879.3

... More
12 mm cement plaster of mix : 1:6 (1 cement : 6 sand)

1094.28

-

208668.25

... More
15 mm cement plaster on the rough side of single or half brick wall of mix 1:6 (1 cement : 6 sand)

1094.28

-

219096.74

... More
Finishing walls by any mechanical or manual means with water proofing cement paint of required shade: New work (Two or more coats applied @ 3.84 kg/10 sqm)

2188.56

-

125207.52

... More
Structural steel work using M.S. flats, angles, channels I-section, H-section etc. riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

836.67

-

102709.61

... More
Fencing with barbed G.I. wire angle iron post placed fitted to at required distance embedded in cement concrete blocks,every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only andprovided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum) between the two posts fitted and fixed with G.I.staples,turn buckles etc. complete. (Cost of posts,struts, earth work and concrete work to be paid for separately):- Payment to be made per metre cost of total length of barbed wire used.

5467

-

110761.42

... More
Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer usingstructural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.

52.5

-

6569.85

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more oats on new work.

33.36

-

2107.35

... More
Re-lettering with black Japan paint of approved brand and manufacture.

1350

-

1444.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.