Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
MP Power Transmission Company Limited - MPPTCL Tender
Eprocure
Opening Date12 Aug 2021
Closing Date1 Sep 2021
Tender Amount₹ 4,50,113 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 15,000Document Cost
₹ 560Tender Fee
₹ 295
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_MPPTC_155031_1Bid Award Id
ViewTender No
3380000/2021-22/TS-03Tender Authority
MP Power Transmission Company Limited ViewPurchaser Address
-Website
http://https://mptenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Erection of 132 KV and 33 KV Bays along with additional 50 MVA Transformer at 132 KV S/s Khimlasa under EE, 400 KV Testing Dn. Bina
Erection of 132 KV and 33 KV Bays along with additional 50 MVA Transformer at 132 KV S/s Khimlasa under EE, 400 KV Testing Dn. Bina.
BOQ Items
... More
Erection of structure including shifting within Sub-station premises, fixing and alignment of templates for grouted/bolted type structures foundations, tightening of nuts, bolts, washers etc and including alignment and leveling of structures of 132 KV Post/Solid Core Insulator Structure (03 No.)
0.58
-
6347
... More
Erection of structure including shifting within Sub-station premises, fixing and alignment of templates for grouted/bolted type structures foundations, tightening of nuts, bolts, washers etc and including alignment and leveling of structures of 33 KV CT Structure (03 No.)
0.26
-
6347
... More
Erection of structure including shifting within Sub-station premises, fixing and alignment of templates for grouted/bolted type structures foundations, tightening of nuts, bolts, washers etc and including alignment and leveling of structures of 33 KV LA Structure (03 No.)
0.26
-
6347
... More
Erection of structure including shifting within Sub-station premises, fixing and alignment of templates for grouted/bolted type structures foundations, tightening of nuts, bolts, washers etc and including alignment and leveling of structures of 33 KV Isolator Structure (02 No.)
0.53
-
6347
... More
Erection of structure including shifting within Sub-station premises, fixing and alignment of templates for grouted/bolted type structures foundations, tightening of nuts, bolts, washers etc and including alignment and leveling of structures of 33 KV Post/Solid Core Insulator Structure (03 No.)
0.26
-
6347
... More
Complete assembly and erection of 50 MVA 132/33 KV Power Transformer with connection etc. including installation of Marshalling Boxes, Control Cabinet, RTCC Panels, Aero cell, Radiators, Cooling Fans , Header etc. including their preliminary checks , Filtration, filling of Transformer Oil etc. and handling of Filter Machine, Vacuum Pump etc. which shall be provided by the Company.
1
-
150000
... More
Stringing of over head gantries vertical droppers with ACSR conductor including fixing of insulator string spares, clamps etc (Single Zebra Conductor).
500
-
54
... More
Stringing of over head gantries vertical droppers with ACSR conductor including fixing of insulator string spares, clamps etc (Twin Zebra Conductor).
250
-
105
... More
Stringing of over head shield wire with 7/3.66 mm standard galvanized steel complete with fixing of strain clamps at the structures.
500
-
21
... More
Shifting & Placement of all the three circuit breaker Poles on structure including shifting with in Substation premises. Complete assembly of 132 KV Circuit Breaker including erection of mechanism Box interconnections piping work, erection of all accessories of the equipments & making interconnections and its earthing
1
-
15000
... More
Shifting of 132 KV Current Transformer from Sub-station premises to Civil foundation and placement on structure and Erection of CT ,fixing of junction Box , including all accessories , making all jumpers etc.
3
-
6000
... More
Shifting and placement of complete 132 KV isolator without Earth switch in all three phase of isolator on structure and its earthing along with mounting of mechanism Box, interconnections piping, alignment of contacts & all accessories along with application of Petroleum Jelly on Jaws & Contracts
3
-
15000
... More
132KV Surge Lighting Arrester Shifting up to Civil foundation and placement on structure and fixing of all accessories, making all connections, Checking and installation of insulator base and Surge counters, making all jumpers etc...
3
-
4000
... More
Shifting and placement of 132 KV solid core insulator (PI) on structure, its earthing and associated works.
6
-
1200
... More
Shifting & Placement of all the three circuit breaker Poles on structure including shifting with in Substation premises. Complete assembly of 33 KV Circuit Breaker including erection of mechanism Box interconnections piping work, erection of all accessories of the equipments & making interconnections and its earthing
1
-
10000
... More
Shifting of 33 KV Current Transformer from Sub-station premises to Civil foundation and placement on structure and Erection of CT ,fixing of junction Box , including all accessories , making all jumpers etc.
3
-
3000
... More
Shifting and placement of complete 33 KV isolator without Earth switch in all three phase of isolator on structure and its earthing along with mounting of mechanism Box, interconnections piping, alignment of contacts & all accessories along with application of Petroleum Jelly on Jaws & Contracts
3
-
9000
... More
33 KV Surge Lighting Arrester Shifting up to Civil foundation and placement on structure and fixing of all accessories, making all connections, Checking and installation of insulator base and Surge counters, making all jumpers etc...
3
-
2000
... More
Shifting and placement of 33 KV solid core insulator (PI) on structure, its earthing and associated works.
6
-
600
... More
132 KV C&R Panel for transformer, shifting up to control room (including storage if required) and placement complete with all relays & accessories . The placement of C&R panel to be done on MS channel frame and MS channel frame will suitable grouted in control room as per drawing . The cutting welding & fabrication of MS Channel frame is to done as per drawing. Proper alignment of C&R panel to be done. The earthing of control & relay panel to be done . Making of all inter connection for the control & relay panel on terminal block as per drawing including all AC & DC connections
1
-
8000
... More
33 KV C&R Panel for transformer, shifting up to control room (including storage if required) and placement complete with all relays & accessories . The placement of C&R panel to be done on MS channel frame and MS channel frame will suitable grouted in control room as per drawing . The cutting welding & fabrication of MS Channel frame is to done as per drawing. Proper alignment of C&R panel to be done. The earthing of control & relay panel to be done . Making of all inter connection for the control & relay panel on terminal block as per drawing including all AC & DC connections
1
-
6500
... More
Laying of cables 2 Core x 2.5 Sq.mm on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables
1000
-
8
... More
Laying of cables 4 Core x 2.5 Sq.mm on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables
2000
-
10
... More
Laying of cables 8 Core x 2.5 Sq.mm on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables
1000
-
12
... More
Laying of cables 12 Core x 2.5 Sq.mm on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables
1000
-
15
... More
Laying of cables 19 Core x 2.5 Sq.mm on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables
1000
-
25
... More
Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 2 Core x 2.5 Sq.mm control / Power cables, including terminations at both end
10
-
85
... More
Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 4 Core x 2.5 Sq.mm control / Power cables, including terminations at both end
12
-
100
... More
Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 8 Core x 2.5 Sq.mm control / Power cables, including terminations at both end
4
-
150
... More
Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 12 Core x 2.5 Sq.mm control / Power cables, including terminations at both end
3
-
200
... More
Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 19 Core x 2.5 Sq.mm control / Power cables, including terminations at both end
8
-
350
... More
Laying of Flat (50 mm x 6 mm ) duly buried at a depth of 0.5 mtr. providing or risers for structures earthing including back filling welding etc. structure earthing of following length.
848
-
50
... More
Laying of Flat (65 mm x 8 mm ) duly buried at a depth of 0.5 mtr. providing or risers for structures earthing including back filling welding etc. structure earthing of following length.
492
-
65
... More
25mm dia x 3000 mm long M.S. rod earth electrodes installation directly driven/drilled (6’’ dia) into earth including excavation (inrespective of type of soil encountered) backfilling with betonite soil (to be arranged by contractor) welding to earth conductor etc.
20
-
900
... More
Preparation of earthing pits (1.5x1.5x3 Mtrs) as per boards drawing No. XII-8-774b, which includes excavation (Irrespective of the soil encountered) embading of 4 No GI Pipes of size 40mm dia, 3 Mtrs long back filling with B.C. soil (to be arranged by the contractor) free from boulders and harmful mixture. These GI pipes are to be welded with MS flats by making mesh frame and cutting of pipes as also making holes in the pipe for water seepage. The earth pit is to be connected with earth mesh of MS flat
4
-
9000
... More
Installation of light fixtures (H.P.S.V.) on gantry columns in supply connection to the light fitting from the nearest lighting board in the yard etc.
10
-
400
... More
Junction Box (36 way)
2
-
1000