Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
MP Power Transmission Company Limited - MPPTCL Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date2 Mar 2023
Closing Date11 Apr 2023
Tender Amount₹ 40,90,000
Costs
EMD
₹ 81,800Document Cost
₹ 1,770Tender Fee
₹ 483
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_MPPTC_257289_1Bid Award Id
ViewTender No
2078Tender Authority
MP Power Transmission Company Limited ViewPurchaser Address
-Website
http://https://mptenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Civil works pertaining to installation of 1 No. 132 KV feeder Bay at 220 kV S/s Handia for power supply to Pump house No. -1 at village Fatehabad distt. Dewas for ISP Parwati lift irrigation project phase-I and II.
BOQ Items
2.24(SOR w.e.f 01.12.2020)Filling available excavated earth (excluding hard rock/Ordinary rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
5
360
72
2.7.3(SOR w.e.f 01.12.2020)Earth work in excavation/ by mechanical means (Hydraulic Excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottom disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. Hard rock (blasting prohibited)
15
8865
591
2.27.1(SOR w.e.f 01.12.2020)Supplying and filling in plinth under floors including watering ramming consolidating in layers not exceeding 20cm in depth and dressing complete. With hard muram having CBR 12 % at under floors including watering, ramming and compacting (minimum compaction 95% of MDD) in layers not exceeding 20cm in thickness and dressing complete. (Note:- maximum thickness of this layer to be provided shall be 30cm)
3100
930000
300
4.1.1.3(SOR w.e.f 01.12.2020)Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level : With 20mm nominal size graded stone aggregate. M-15 - Grade concrete
90
402390
4471
4.1.1.4(SOR w.e.f 01.12.2020)Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level : With 20mm nominal size graded stone aggregate. M-10Nominal (Mix-1 Cement : 3 sand : 6 graded stone aggregate )
47
182830
3890
4.1.2.3(SOR w.e.f 01.12.2020)Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level : With 40mm nominal size graded stone aggregate. M-7.5 Nominal Mix -1 Cement : 4 sand : 8 graded stone aggregate
14
48636
3474
4.3.1(SOR w.e.f 01.12.2020)Centering and shuttering including strutting, propping etc. and removal of form work for : Upto plinth: Foundations, footings, bases for columns, plinth beams, curtain walls, columns below plinth.
100
16900
169
4.3.2(SOR w.e.f 01.12.2020)Centering and shuttering including strutting, propping etc. and removal of form work for : above plinth: Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, and string courses fillets etc.
190
50730
267
5.16.1(SOR w.e.f 01.12.2020)Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding including cost of binding wire all wastages and overlaps, couplers (overlaps shall be provided as per requirement of IS 13920 for ductile detaling IS 456 RCC Design & SP 34 Reinforcement detailing ) etc. complete . (Note:-1. Spacer bars (chairs) shall be paid separately as shown in the drawing and as per direction of engineer in charge.2. No extra payment shall be done for overlaps and/or couplers.3.Couplers shall be conforming to IS code on "Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification") : Mild steel and Medium Tensile steel bars.
500
30000
60
5.16.6(SOR w.e.f 01.12.2020)Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding including cost of binding wire all wastages and overlaps, couplers (overlaps shall be provided as per requirement of IS 13920 for ductile detaling IS 456 RCC Design & SP 34 Reinforcement detailing ) etc. complete . (Note:-1. Spacer bars (chairs) shall be paid separately as shown in the drawing and as per direction of engineer in charge.2. No extra payment shall be done for overlaps and/or couplers.3.Couplers shall be conforming to IS code on "Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification")Thermo-Mechanically Treated bars. (TMT/TMX) FE 500 or more conforming to IS 1786
2800
176120
62.9
16 NSORLabour only for fixing bolts of any length i/c weight of nuts & washers , etc. complete as per direction of Engineer in charge.
2100
16800
8
5.1.1(SOR w.e.f 01.12.2020)Providing and laying in position specified grade of reinforced cement concrete (with 20mm nominal size graded stone aggregate) excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : M-20 Grade Concrete
52
301392
5796
53 NSORProviding & Laying in position Controlled cement Concrete of grade M-25 with clean graded metal of max.size 20 mm and clean sand free from all impurities excluding cost of reinforcement but including cost of all material & labour, formwork vibration, finishing, curing, transportation etc. complete (for structure foundations )
5
30675
6135
5.9.1(SOR w.e.f 01.12.2020)Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for concrete upto plinth level
160
30496
190.6
5.9.2.1(SOR w.e.f 01.12.2020)Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) in cluding attached pilasters butter esses, plinth beams and string courses etc. Uptoplinthlevel.
255
55845
219
5.9.3(SOR w.e.f 01.12.2020)Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platform.
3
1318
439.6
5.9.5(SOR w.e.f 01.12.2020)Centering and shuttering including strutting, propping etc. and removal of form for: Lintels, beams, girders, bressumers and cantilevers
2
712
356
5.9.6(SOR w.e.f 01.12.2020)Centering and shuttering including strutting, propping etc. and removal of form for: Columns, P i l l a r s , Piers, Abutments, Posts and Struts.
9
4240
471.2
5.9.7(SOR w.e.f 01.12.2020)Centering and shuttering including strutting, propping etc. and removal of form for: Stairs, (excluding landings) except spiral- Staircases.
1
435
435.7
13.54.2(SOR w.e.f 01.12.2020)Finishing walls by any mechanical or manual means with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand or manufacture.
13
923
71
37 NSORProviding & Fixing in position LDPE Film of 150 micron (0.15 mm ) , ISI mark- 2508 (Grade 231) , including heat sealed joints at ends as per IS 9698 including cost of all material, labour, T&P, taxes, transportation etc. complete as directed by Engineer in charge
800
20000
25
11.72.3 (SOR w.e.f 01.12.2020)Providing and laying factory made chamfered edge Cement Concrete paver blocks of required colour strength, thickness pattern, surface texture (smooth/rough) and size/shape, conforming to 15658-2006 IS marked made by table vibratory method using PU mould, laid in required colourand pattern over 50mm thick compacted bed of stone dust, compacting and proper embedding/ laying of inter locking paver blocks into the bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand including locking edges in 0.30 mm with courtyards, porch with M 15 cement concrete in footpath, parks, lawns, drive ways or light traffic parking etc. complete as per manufacturer'sspecifications and direction of Engineer-in- Charge. 60 mm thick C.C. paver block of M-30 grade
50
25900
518
8 NSORSupply,stacking and spreading of 40mm crusher broken metal black trap, basalt or granite uniformly in substation yard in desired thickness, free from dust and foreign matter,including transportation up to site, lead and lift, T&P, labour,royalty and taxes etc. complete as directed by Engineer-in-charge.
65
65195
1003
17.58.2(SOR w.e.f 01.12.2020)Providing and fixing unplasticised Rigid PVC soil and waste pipes conforming to IS: 13592 Type B including jointing with seal ring conforming to IS : 5382 leaving 10mm gap for thermal expansion. Single socketed pipes for working pressure of 4 kg/sqcm. (minimum wall thickness 3.2mm)..110 mm diameter
22
5236
238
18.7.2(SOR w.e.f 01.12.2020)Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,..having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings. This included jointing of pipes and fittings with one step CPVC solvent cement, trenching, refilling and testing of joints complete as per direction of Engineer-in- Charge. External Work..20 mm nominal outer dia .Pipes.
50
7050
141
18.7.3(SOR w.e.f 01.12.2020)Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,..having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings. This included jointing of pipes and fittings with one step CPVC solvent cement, trenching, refilling and testing of joints complete as per direction of Engineer-in- Charge. External Work.25 mm nominal outer dia .Pipes.
50
9250
185
18.29.1(SOR w.e.f 01.12.2020)Providing and fixing brass bib cock of approved quality..15 mm nominal bore
5
1530
306
140 NSOR132 KV LA (3 LO4) 1 No Foundation only Construction of Structure foundation as per standard drawing and details as given in standard MB vide page No.Vol-I/P-35
3
11590
3863.49
137 NSOR132 KV Isolator (3DO2) & (3DO5) Construction of Structure foundation as per standard drawing and details as given in standard MB vide page No.Vol-I/P-29
3
46777
15592.51
132 KV CT foundation (3CO5 Type)132 KV CT foundation (3CO5 Type)
3
9300
3100
141 NSOR132 KV CB (Circuit Breaqker) Construction of Structure foundation as per standard drawing and details as given in standard MB vide page No.Vol-I/P-37
1
23699
23699.77
199 NSORRCC Cable trench D Type Construction of civil work as per Standard drawings and details mentioned in SMB vide page No. Vol-II/P-29 to 31
40
129442
3236.07
200 NSORRCC Cable trench E Type Construction of civil work as per Standard drawings and details mentioned in SMB vide page No. Vol-II/P-32 to 34
10
23291
2329.11
201 NSORRCC Cable trench F Type Construction of civil work as per Standard drawings and details mentioned in SMB vide page No. Vol-II/P-35 to 37
10
17305
1730.53
220 NSOREarth Pit Construction of civil work as per Standard drawings and details mentioned in SMB vide page No.Vol-II/P-90-91
3
19317
6439.21
227 NSORBoundary Wall 2.4 M High Construction of civil work as per Standard drawings and details mentioned in SMB vide page NoVol-II/P-121 to 129
140
1116486
7974.9
10.14.1 (SOR w.e.f 01.12.2020)Steel work in built up M.S. tubular section (round, square or rectangular hollow tubes etc.) trusses/frame work etc. including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes
400
43200