MP Power Transmission Company Limited Tender

Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.

MP Power Transmission Company Limited - MPPTCL Tender

Works
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date16 Feb 2024
Closing Date12 Apr 2024
Tender Amount₹ 7,92,705 
Notes
Download

Costs

  • EMD

    ₹ 19,000
  • Document Cost

    ₹ 590
  • Tender Fee

    ₹ 295

Summary

Dismantling And Shifting Of 20mva Emco Make Transformer Sr. No. 1239-11293 And Erection Work Of New 50mva Bbl Make Transformer And Other Associated Works At Anjad 132kv Substation

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Stringing of ACSR Conductor on overhead gantries, vertical droppers including fixing of insulator string, spacers, clamp etc. ACSR Single Zebra conductor

200

13000

65

... More
Erection of 132 KV Circuit Breaker (3 Phase): Unloading and shifting of Circuit Breaker from the carriage and placement of C.B. on structure. Complete assembly of C.B. including Erection of control cabinet and mechanism box. Erection of all accessories for the Equipment

1

18000

18000

... More
Erection of 132 KV Current Transformer: Unloading of CT from the carriage and Shifting of 132 KV Current Transformer and placement on structure and fixing of all accessories, making all connections, checking and installation of insulator base and Surge counters, making all jumpers etc.

3

21600

7200

... More
Erection of 132 KV Isolator W/o Earth switch : Unloading of Isolator from the from Civil foundation and removing of complete isolator in all three phase of isolator structure and dismantling of mechanism box, Interconnection piping, alignment of contacts and all associated activities to make the installation completed including checking of successful technical and electrical operation.

2

36000

18000

... More
Erection of 132 KV Surge Lightning Arrester: Unloading of L.A. from the carriage and Shifting of 132 KV Surge Lightning Arrester and placement on structure and fixing of all accessories, making all connections, checking and installation of insulator base and Surge counters, making all jumpers etc.

3

14400

4800

... More
Erection of 33 KV Current Transformer: Unloading of C.T. from the carriage and Shifting of 33 KV C.T. up to Civil foundation and placement on structure and fixing of junction Box, including all accessories, making all jumpers etc.

6

21600

3600

... More
Erection of 33 KV Isolator without Earth switch (3phase): Unloading of Isolator Without Earth switch from the carriage and shifting up to Civil foundation and placement of complete isolator in all three phase of isolator structure and Erection/mounting of mechanism box, interconnection piping, alignment of contacts, with solid core Insulator and all associated activities to make the installation completed including checking of successful technical and electrical operation.

2

21600

10800

... More
Erection of 33 KV Circuit Breaker (3 Phase): Unloading and shifting of Circuit Breaker from the carriage and placement of C.B. on structure. Complete assembly of C.B. including Erection of control cabinet and mechanism box. Erection of all accessories for the Equipment

1

12000

12000

... More
Laying of cables on rack/cable trays/angle support overhead racks, conducts including dressing of cables with accessories for copper conductor and armour control cables: 2 Core x 2.5 sq.mm.

500

5000

10

... More
Laying of cables on rack/cable trays/angle support overhead racks, conducts including dressing of cables with accessories for copper conductor and armour control cables: 4 Core x 2.5 sq.mm.

500

6000

12

... More
Laying of cables on rack/cable trays/angle support overhead racks, conducts including dressing of cables with accessories for copper conductor and armour control cables: 8 Core x 2.5 sq.mm.

500

7000

14

... More
Laying of cables on rack/cable trays/angle support overhead racks, conducts including dressing of cables with accessories for copper conductor and armour control cables: 12 Core x 2.5 sq.mm.

500

9000

18

... More
Laying of cables on rack/cable trays/angle support overhead racks, conducts including dressing of cables with accessories for copper conductor and armour control cables: 19 Core x 2.5 sq.mm.

500

15000

30

... More
Cable terminations including fixing of cable glands, lugs etc. for each type of control / Power cables, including terminations at both end: 2 Core x 2.5 sq.mm.

6

612

102

... More
Cable terminations including fixing of cable glands, lugs etc. for each type of control / Power cables, including terminations at both end: 4 Core x 2.5 sq.mm.

10

1200

120

... More
Cable terminations including fixing of cable glands, lugs etc. for each type of control / Power cables, including terminations at both end: 8 Core x 2.5 sq.mm.

6

1080

180

... More
Cable terminations including fixing of cable glands, lugs etc. for each type of control / Power cables, including terminations at both end: 12 Core x 2.5 sq.mm.

6

1440

240

... More
Cable terminations including fixing of cable glands, lugs etc. for each type of control / Power cables, including terminations at both end: 19 Core x 2.5 sq.mm.

6

2520

420

... More
EARTHING INSTALLATION: Installation of steel risers and making earth mat (duly buried at a depth of 0.5 mtrs.) including back filling welding etc. and bolting of risers to the structures/ equipments at desired place: 65x8mm

250

19500

78

... More
EARTHING INSTALLATION: Installation of steel risers and making earth mat (duly buried at a depth of 0.5 mtrs.) including back filling welding etc. and bolting of risers to the structures/ equipments at desired place: 50x6mm

250

15000

60

... More
DISMANTLING OF STRUCTURES Dismantling of structures including shifting within Sub-station premises, fixing and alignment of templates for grouted/bolted type structures foundations, lighting of nuts, bolts, washers etc. and including alignment and levelling of structures (a) Dismantling of 33 KV Isolator structure

0.27

1016

3808

... More
Dismantling of 132/33KV 20 MVA EMCO make Transformer Sr. no. 1239/11293 Complete dismantling of 20 MVA 132/33KV Transformer, along with its accessories, like headers, Radiators, Conservators, Breathers, cooling fans, Marshalling box, OLTC mechanism. Thermosyphon, etc. after preliminary inspection.

1

45000

45000

... More
Dragging of 132/33KV 20 MVA CGL make Transformer Sr. no. 24400 along with oil 37MT and all accessories 3MT from existing plinth to the place with in Substation premises (Rs/MT/Mtr.) (` 35 x 40MT x 110 Mtr.); rates taken from CE (Procurement) MPPTCL Transport order no. 04-01/TR-40/2020/SE-II/04796-9 Dtd. 12.05.2021

4400

154000

35

... More
Dismantling of 132 KV CT by shifting & unloading up to the carriage and Shifting of 132 KV CT from structure and removing of all accessories, all connections, checking and dismantling of insulator base and Surge counters, removing all jumpers etc.

3

10800

3600

... More
Dismantling of 132 KV LA by shifting & unloading up to the carriage and removing of all accessories, all connections, checking, wire and dismantling etc.

3

7200

2400

... More
Dismantling of 33 KV CT by shifting & unloading up to the carriage and Shifting of 33 KV CT from structure and removing of all accessories, all connections, checking and dismantling of insulator base and Surge counters, removing all jumpers etc.

3

5400

1800

... More
Dismantling of 33 KV CB by shifting & unloading up to the carriage and Shifting of 33 KV CB from structure and removing of all accessories, all connections, checking and dismantling of insulator base and Surge counters, removing all jumpers etc.

1

6000

6000

... More
Dismantling of 33 KV Isolator by shifting & unloading up to the carriage and shifting from structure by removing isolator in all three phase of isolator structure and dismantling of mechanism box, interconnection piping, alignment of contacts.

1

5400

5400

... More
Preparation of Earthing Pits (1.5 x 1.5 x 3 meter) as per approved drawing which includes excavation (irrespective of the soil encountered), embedding of 4 nos. GI Pipes of size 40 mm dia3-Meter-long, backfilling with B.C. soil (soil to be arranged by contractor) free from boulders and harmful mixture. These GI Pipes are to be welded with M.S. flats by making mesh frame and cutting of pipes as also making holes in the pipe for water seepage. The earth pit is to be connected with earth mesh by M.S. flat. (G.I. pipe will be provided by MPPTCL).

2

21600

10800



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.