Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.

MP Power Transmission Company Limited - MPPTCL Tender

Works
Consultancy Services
Eprocure
Opening Date22 Feb 2019
Closing Date25 May 2019
Tender Amount₹ 15,00,00,000 
Notes
Download

Costs

Summary

Asset Mapping Of Various Transmission Lines And Substations

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
NIT for Asset Mapping of various Transmission lines and Substations using modern DGPS Survey Techniques and Web based Transmission Asset Management Systems.
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply of Geospatial Web Server & Desktop Software as per Web GIS software capabilities mentioned in the Bid Document (One Server license + Four desktop license each)

1

-

-

... More
Multi user Mobile application software for maintenance Work Reporting integrated with TAMS (Android &Ios)

1

-

-

... More
Database server SQL server standard edition (One License)

1

-

-

... More
AT FIELD OFFICES

-

-

-

... More
EQUIPMENT

-

-

-

... More
Differential Global Positioning System (DGPS) with RTK and all accessories & associated software at field offices (The minimum configuration is indicated in Annexure- III of Section-IV)

1

-

-

... More
Hand held Differential Global Positioning System (DGPS) with all accessories & associated software at field offices (The minimum configuration is indicated in Annexure- II of Section-IV)

33

-

-

... More
PRICE SCHEDULE TOWARDS SERVICES FOR INSTALLATION, TESTING, COMMISSIONING AND IMPLEMENTATION OF TAMS SCHEME SCHEDULE- I (B)

-

-

-

... More
Field Work

-

-

-

... More
Base Map preparation on 100 meter of both side of the transmission network covering villages, towns, cities, approach roads, National highways, express high way, rivers, terrain, hills, costal area, forest area, desert, dams etc. from Open Source freely available Satellite Imagery like Google/Bing or similar

1300

-

-

... More
Surveying for data collection using DGPS at each & every towers in the alignment of transmission lines and LT/HT/EHT electric lines, railway lines, water body, buildings/structures other than the line‘s towers, forest etc in Right of Way and establishment of GCP

13000

-

-

... More
Development of the Sub-Station Land Utilization Plan (LUP) Map including Single Line Diagram (SLD) through DGPS survey upto a desired accuracy level and vectorization of the same on GIS layers with proper labelling and standard symbology so that area of the assets can be assessed on demand in metric units

225

-

-

... More
Establishing reinforced cement concrete pillar as per drawing at each substation as secondary Grid Control Point and depending upon, after,on an average of every 10 Km of transmission lines, which will be known as tertiary control points and other important points as per requirement of MPPTCL which also includes supply of required material like cement, sand, metal, reinforcement bars, steel plates, bolts/Nuts etc. and associated work of excavation, verticality & levelling, PCC & RCC concrete, fixing of reinforcement tore bars & bolts/nuts, backfilling, curing, marking of point of reading, numbering, painting etc.

1800

-

-

... More
Installation, Testing, Commissioning, and implementation

-

-

-

... More
Development, Installation, Customization & Deployment of TAMS on Web server

1

-

-

... More
Integration of TAMS with ERP

1

-

-

... More
Development of Dash Board

1

-

-

... More
Hosting of Towers, Transmission Lines & Substations in the Geo Portal, Development of geo-relation database for report generation, querying database in user- friendly manner, integration of data base on application software/s for analyzing & output as per MPPTCL‘s requirements

1

-

-

... More
Security Audit of the Application for Hosting on NIC Server of as suggested by MPPTCL

1

-

-

... More
Installation, Testing, Commissioning, and implementation of Mobile Application for all officers (meeting all requirements as per Section-I & Section-IV).

1

-

-

... More
Onsite at least 03 days Training at 4 Location for Web GIS Application, Mobile Application and technique of DGPS Survey

4

-

-

... More
PRICE SCHEDULE FOR ANNUAL MAINTENANCE SERVICES FOR TAMS (FOR HEAD QUARTER AND CONTROL CENTRES AND ALL FIELD UNITS) SCHEDULE- I©

-

-

-

... More
Comprehensive AMC for all hardware /Web Application software / equipments installed under TAMS for 1st Year after Defect Liability period

1

-

-

... More
Comprehensive AMC for all hardware / Web Applicationsoftware / equipments installed under TAMS for 2nd Year after Defect Liability period

1

-

-

... More
Comprehensive AMC for all hardware / Web Applicationsoftware / equipments installed under TAMS for 3rd Year after Defect Liability period

1

-

-

... More
Comprehensive AMC for all hardware / Web Applicationsoftware / equipments installed under TAMS for 4th Year after Defect Liability period

1

-

-

... More
Comprehensive AMC for all hardware / Web Applicationsoftware / equipments installed under TAMS for 5thYear after Defect Liability period

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.