MP Power Transmission Company Limited Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
MP Power Transmission Company Limited - MPPTCL Tender
Electrical and Electronics
Eprocure
Opening Date16 Dec 2022
Closing Date19 Jan 2023
Tender Amount₹ 8,20,890
Costs
EMD
₹ 16,418Document Cost
₹ 590Tender Fee
₹ 295
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_MPPTC_238045_1Bid Award Id
ViewTender No
TS12/2022Tender Authority
MP Power Transmission Company Limited ViewPurchaser Address
-Website
http://https://www.mptransco.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Work of Erection of additional 50 MVA X mer at 132 KV Sub station Chinore under EHT construction Division II Gwalior
BOQ Items
DISMANTLING OF STRUCTURE 33 Kv Structure of solid core insulator
3
-
5400
DISMANTLING OF EQUIPMENT
33 Kv isolator
1
-
1800
DISMANTLING OF EQUIPMENT
33 Kv CT
3
-
600
DISMANTLING OF EQUIPMENT
132 KV solid core insulator
3
-
600
DISMANTLING OF EQUIPMENT
33 KV solid core insulator
3
-
120
Stringing of overhead Gantries, vertical Droppers with ACSR Conductor including fixing of Insulators string, spacers, clamps etc.
Single Zebra
500
-
65
Stringing of overhead Gantries, vertical Droppers with ACSR Conductor including fixing of Insulators string, spacers, clamps etc.
Double Zebra
250
-
126
Stringing of overhead Gantries, vertical Droppers with ACSR Conductor including fixing of Insulators string, spacers, clamps etc.
Overhead Earth wire
500
-
25
132 Kv Circuit Breaker.
Shifting & placement of all the three Circuit Breaker Poles on structure including shifting with in Substation premises. Complete assembly of Circuit Breaker including erection of mechanism Box interconnecting piping work, erection of all accessories of the equipments & making interconnections and its earthing
1
-
18000
132KV C.T.
Shifting & placement on structure fixing of Junction Box & all accessories making all interconnections etc. including its earthing.
3
-
7200
132KV Isolator without E/S (Three Phase)
Shifting and placement of complete Isolator in all three phase of Isolator on structure and its earthing along with mounting of mechanism Box, interconnections piping, alignment of contacts & all accessories along with application of Petroleum Jelly on Jaws & Contacts.
3
-
18000
132 KV LA
Shifting & placement of LA equipment on structure including all accessories making all interconnection checking & installation along with earthing etc
3
-
4800
132 KVPost/ Solid Core insulator
Shifting & placement of PI on structure including all accessories making all interconnection checking & installation along with earthing etc.
3
-
1440
132KV C&R Panel ( For 132/33KV X-mer)
Storage, shifting of Control & Relay Panel and placement grouting of Panel complete with all Relay & their accessories and earthing and fixing of Glands etc. Making of all connections for the Control & Relay Panel on Terminal block as per drawing provided by EE, Testing Dn., II MPPTCL, Gwalior including all AC & DC connections.
1
-
9600
33KV Circuit Breaker Shifting & placement of all the three Circuit Breaker Poles on structure including shifting with in Substation premises. Complete assembly of Circuit Breaker including erection of mechanism Box interconnecting piping work, erection of all accessories of the equipments & making interconnections and its earthing.
1
-
12000
33KV C.T.
Shifting & placement on structure fixing of Junction Box & all accessories making all interconnections etc. including its earthing.
3
-
3600
33KV Isolator without E/S(Three Phase)
Shifting and placement of complete Isolator in all three phase of Isolator on structure and its earthing along with mounting of mechanism Box, interconnections piping, alignment of contacts & all accessories along with application of Petroleum Jelly on Jaws & Contacts.
3
-
10800
33 KV LA
Shifting & placement of LA equipment on structure including all accessories making all interconnection checking & installation along with earthing etc.
3
-
2400
33 KV Post/ Solid Core insulator
Shifting & placement of PI on structure including all accessories making all interconnection checking & installation along with earthing etc.
3
-
720
33KV C&R Panel Storage, shifting of Control & Relay Panel and placement grouting of Panel complete with all Relay & their accessories and earthing and fixing of Glands etc. Making of all connections for the Control & Relay Panel on Terminal block as per drawing provided by EE, Testing Dn., II MPPTCL, Gwalior including all AC & DC connections.
1
-
7800
CABLE LAYING Laying of Copper cable (armored-un armored on racks/Cable Trays? Angle support overhead racks conduits including dressing of cable with accessories for Copper Conductor and uarmored Control cable. (2 CORE X 2.5 SQMM)
1000
-
10
CABLE LAYING Laying of Copper cable (armored-un armored on racks/Cable Trays? Angle support overhead racks conduits including dressing of cable with accessories for Copper Conductor and uarmored Control cable. (4 CORE X 2.5 SQMM)
2000
-
12
CABLE LAYING Laying of Copper cable (armored-un armored on racks/Cable Trays? Angle support overhead racks conduits including dressing of cable with accessories for Copper Conductor and uarmored Control cable. (8 CORE X 2.5 SQMM)
1000
-
14
CABLE LAYING Laying of Copper cable (armored-un armored on racks/Cable Trays? Angle support overhead racks conduits including dressing of cable with accessories for Copper Conductor and uarmored Control cable. (12 CORE X 2.5 SQMM)
1000
-
18
CABLE LAYING Laying of Copper cable (armored-un armored on racks/Cable Trays? Angle support overhead racks conduits including dressing of cable with accessories for Copper Conductor and uarmored Control cable. (19 CORE X 2.5 SQMM)
1000
-
30
Cable Termination including providing of holes for Cable entry fixing of glands, dressing of Cable leads, fixing of lugs, etc. for each type of control cable including termination at both ends. (2 CORE X 2.5 SQMM)
10
-
102
Cable Termination including providing of holes for Cable entry fixing of glands, dressing of Cable leads, fixing of lugs, etc. for each type of control cable including termination at both ends. (4 CORE X 2.5 SQMM)
12
-
120
Cable Termination including providing of holes for Cable entry fixing of glands, dressing of Cable leads, fixing of lugs, etc. for each type of control cable including termination at both ends. (8 CORE X 2.5 SQMM)
4
-
180
Cable Termination including providing of holes for Cable entry fixing of glands, dressing of Cable leads, fixing of lugs, etc. for each type of control cable including termination at both ends. (12 CORE X 2.5 SQMM)
3
-
240
Cable Termination including providing of holes for Cable entry fixing of glands, dressing of Cable leads, fixing of lugs, etc. for each type of control cable including termination at both ends. (19 CORE X 2.5 SQMM)
8
-
420
Preparation of Earthing Pits (1.25Mx1.25Mx3M) as per Board's drawing No. XII-B-774 which includes excavation of the soil encountered embedding of 4 Nos. GI pipes of size 40mm 3 Mtr. long back filling with Black Cotton soil free from boulders & harmful mixture. These GI pipe are to be welded with MS Flat at 3 places by making mesh frame and cutting of pipes as also making holes in the pipe for water seepage. The earth pit is to be connected with earth mesh of MS Flat.
4
-
10800
Installation of 25 mm dia 3000 mm long MS Rod earth Electrodes by directly driving/drilling (6” dia) to in earth including excavation (irrespective of type of solid encountered), back filling with bentonite soil, welding to earth Conductor etc.
20
-
1080
Laying of Flat (65mmx or 50mmx6mm) duly buried at a depth of 0.5 Mtr. providing of risers for structures earthing including back filling, welding etc. structures earthing of following length. 50X6MM
850
-
60
Laying of Flat (65mmx or 50mmx6mm) duly buried at a depth of 0.5 Mtr. providing of risers for structures earthing including back filling, welding etc. structures earthing of following length. 65X8MM
500
-
78
Installation of light fixtures on gantry column, supply connection to the light fitting from the nearest lighting board in the Yard etc
10
-
4730
Erection of Junction Box
Junction Box(64 ways)
1
-
1200
Erection of Junction Box
Junction Box(36 ways)
1
-
1200
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements