Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
MP Power Transmission Company Limited - MPPTCL Tender
Civil And Construction
Eprocure
Opening Date9 Apr 2021
Closing Date24 Apr 2021
Tender AmountRefer Documents
Costs
EMD
₹ 19,000Document Cost
₹ 560Tender Fee
₹ 295
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_MPPTC_135536_2Tender No
TS-11/2020-21Tender Authority
MP Power Transmission Company Limited ViewPurchaser Address
-Website
http://http://www.mptransco.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
NIT for Installation 50 MVAR ,220 KV Bus Reactor at 220 KV Substation Pandhurna under EE(testing) Dn. Chhindwara.
Installation of 50MVAR 220KV Bus Reactor at 220KV Pandhurna under (Testing) Dn. Chhindwara
Key date as per 1st Extension Letter for 50MVAR Bus Reactor at 220KV Pandhurna
BOQ Items
Stringing of overhead shield wire with 7/3.66mm standard galvanised steel complete with fixing of strain clamps at the structures
1000
-
21
Installation and Erection of Outdoor/Indoor Equipments 50 MVAR 220 KV Bus Reactor - Complete assembly and erection of 50 MVAR 220 KV Bus Reactor with connection etc. including installation all accessories etc. for 50 MVAR 220 KV Bus Reactor including there preliminary checks. (With oil & associated equipments)
1
-
350000
220KV EQUIPMENTS, 220KV Circuit Breakers (3 Phase) -Unloading of Circuit Breakers from the carriage. Shifting within Sub-station premises and placment of all 3No. poles of C.B. on Structure. Complete assembly of Circuit breaker including errection of control cabinet and mechanism box,interconnecting piping work,errection of all accesories for the equipment. SF6 gas filling for which gas cylinder and filling equipments shall be provided by MPPTCL
1
-
31000
220KV Current Transformer Ratio:800-400/1-1-1-1-1 Amp. - Unloading of C.T. from the carriage . Shifting of 220KV CT.upto Civil foundation and placement on stucture and fixing of Junction Box, including all accessories,making all jumpers etc.
3
-
10000
Dismentling, Shifting & Errection of 220 KV PT - Dismentling of 220 KV PT
3
-
5000
Installation of 220 KV PT and placement of structure and fixing of all accessories, making all interconnections jumper etc.
3
-
10000
220 KV Isolator with out Earth switch (3-Phase) - Unloading of Isolator from the carriage . Shifting upto Civil foundation and placement of complete isolator in all three phase of isolator structure. Erection / mounting of mechanism box ,interconnection pippnig alignment of contacts and all associated activities to make the installtion complete including checking of successful technical and electrical operation.
1
-
25000
220KV Lighting Arrester - Unloading of L.A. from the carriage. Shifting of 220KV Lighting Arrester and placement on stucture and fixing of all accessories, making all interconnections, Checking and installation of insulator base and Surge counters, making all jumpers etc.
3
-
6000
Solid core Insulators for substation work - Unloading of P.I. from the carriage and proper Staking/Storage. Erection of 220KV Post Insulator/Solid core Insulator, their Connections and shifting within sub-staion permises.
8
-
1500
Solid core Insulators for Isolators - Unloading of P.I. from the carriage and proper Staking/Storage. Erection of 220KV Post Insulator/Solid core Insulator, their Connections and shifting within sub-staion permises.
9
-
1500
220KV Control & Relay Panels for 50 MVAR 220 KV Bus Reactor - Unloading of Control Realy Panels from the carriage. Shifting up to Control room(including Storage if required) & placment complet with all relays and accesories. The placement of C&R panel to be done on MS channel frame and MS channel frame will be suitably grouted in control room as per drawing.Proper alignment of C&R panel to be done. The earthing of C&R panel to be done.
1
-
13000
Cable Laying/Installation - Laying of copper cables (armoured/unarmoured) on racks/angles support Over head racks,conduits including dressing of cables with accessories for copper conductor & armoured control cables. 2Core x 2.5 / 4.0 Sq. mm
500
-
8
Cable Laying/Installation - Laying of copper cables (armoured/unarmoured) on racks/angles support Over head racks,conduits including dressing of cables with accessories for copper conductor & armoured control cables. 4Core x 2.5/4.0 Sq. mm
8000
-
10
Cable Laying/Installation - Laying of copper cables (armoured/unarmoured) on racks/angles support Over head racks,conduits including dressing of cables with accessories for copper conductor & armoured control cables. 8Core x 2.5 Sq. mm
1000
-
12
Cable Laying/Installation - Laying of copper cables (armoured/unarmoured) on racks/angles support Over head racks,conduits including dressing of cables with accessories for copper conductor & armoured control cables. 12Core x 2.5 Sq. mm
1000
-
15
Cable Laying/Installation - Laying of copper cables (armoured/unarmoured) on racks/angles support Over head racks,conduits including dressing of cables with accessories for copper conductor & armoured control cables. 19Core x 2.5 Sq. mm
2000
-
25
Providing Holes for cable entry, fixing of glands, dressing of cable leads, fixing of tags 2Core x 2.5 Sq. mm
22
-
85
Providing Holes for cable entry, fixing of glands, dressing of cable leads, fixing of tags 4Core x 2.5 Sq. mm
24
-
100
Providing Holes for cable entry, fixing of glands, dressing of cable leads, fixing of tags 8Core x 2.5 Sq. mm
12
-
150
Providing Holes for cable entry, fixing of glands, dressing of cable leads, fixing of tags 12Core x 2.5 Sq. mm
12
-
200
Providing Holes for cable entry, fixing of glands, dressing of cable leads, fixing of tags 19Core x 2.5 Sq. mm
24
-
350
Power cable 3.5 core 70/150 Sq mm
1
-
80
Earthing Installation -installation of 25mm dia 3000mm long MS rod earth electrodes by directly driving/ drilling (6''dia) in to earth including excavation(irrespective of soil encounterd), back filling with bentonite soil,welding to earth conductor etc.
25
-
900
installation of steel risers and making earth mat (duly buried at a depth of 0.5 mtrs.) including back filling welding etc. and bolting of risers to the structures/ eqipments at desired place: M.S.Flat 75X8mm
200
-
80
installation of steel risers and making earth mat (duly buried at a depth of 0.5 mtrs.) including back filling welding etc. and bolting of risers to the structures/ eqipments at desired place: M.S.Flat 65X8mm
220
-
65
installation of steel risers and making earth mat (duly buried at a depth of 0.5 mtrs.) including back filling welding etc. and bolting of risers to the structures/ eqipments at desired place: M.S.Flat 50X6mm
400
-
50
Preparation of pits(1.5x1.5x3Mtrs) as per Board's drawing No.XII-B-774 which includes excavation (irrespective of the soil encountered) embedding of 4 Nos GI Pipes of size 40mm dia 4 mm thickness along with clamp for earth pit back filling with black cotton soil free from boulder & harmful mixture and costruction of brick for earth pit.These GI Pipes are to be welded with MS Flat by making mesh frame and cutting of pipes as also making oles in the pipes for water seepage . the earth pit is to be connected with earth mesh of MS flat in four directions directly on pipe
5
-
9000