MP Power Transmission Company Limited Tender

Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.

MP Power Transmission Company Limited - MPPTCL Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date18 Jul 2024
Closing Date13 Aug 2024
Tender AmountRefer Documents 
Notes
Download

Costs

  • EMD

    ₹ 8,000
  • Document Cost

    ₹ 590
  • Tender Fee

    ₹ 295

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
complete erection work of 01 No. 132KV and 01 No. 33KV Bus Coupler Bay at 132 KV Sub-Station Berasiya under EE Testing Dn. MPPTCL Vidisha, against NIT Tender Specification No. 3373000/2024-25/TS-02.
complete erection work of 01 No. 132KV and 01 No. 33KV Bus Coupler Bay at 132 KV Sub-Station Berasiya under EE Testing Dn. MPPTCL Vidisha, against NIT Tender Specification No. 3373000/2024-25/TS-02.
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Erection of structure including shifting within Sub-station premises, fixing and alignment of templates for grouted/bolted type structures foundations, tightening of nuts, bolts, washers etc and including alignment and leveling of structures of132 KV Solid core Structure (03 No.)

0.58

4409

7616

... More
Erection of structure including shifting within Sub-station premises, fixing and alignment of templates for grouted/bolted type structures foundations, tightening of nuts, bolts, washers etc and including alignment and leveling of structures of 33 KV Isolator (02 No.)

0.54

4112

7616

... More
Erection of structure including shifting within Sub-station premises, fixing and alignment of templates for grouted/bolted type structures foundations, tightening of nuts, bolts, washers etc and including alignment and leveling of structures of 33 KV CT Structure (03 No.)

0.26

1987

7616

... More
Erection of structure including shifting within Sub-station premises, fixing and alignment of templates for grouted/bolted type structures foundations, tightening of nuts, bolts, washers etc and including alignment and leveling of structures of 33 KV Solid core Structure (03 No.)

0.26

1987

7616

... More
Stringing of over head gantries vertical droppers with ACSR conductor including fixing of insulator string spares, clamps etc (Twin Zebra Conductor).

100

12600

126

... More
Shifting & Placement of all the three circuit breaker Poles on structure including shifting with in Substation premises. Complete assembly of 132 KV Circuit Breaker including erection of mechanism Box interconnections piping work, erection of all accessories of the equipments & making interconnections and its earthing

1

18000

18000

... More
Shifting of 132 KV Current Transformer from Sub-station premises to Civil foundation and placement on structure and Erection of CT ,fixing of junction Box , including all accessories , making all jumpers etc.

3

21600

7200

... More
Shifting and placement of complete 132KV isolator without Earth switch (Three Phase) in all three phase of isolator on structure and its earthing along with mounting of mechanism Box, interconnections piping, alignment of contacts & all accessories along with application of Petroleum Jelly on Jaws & Contracts

2

36000

18000

... More
132 KV C&R Panel for Bus coupler, shifting up to control room (including storage if required) and placement complete with all relays & accessories . The placement of C&R panel to be done on MS channel frame and MS channel frame will suitable grouted in control room as per drawing . The cutting welding & fabrication of MS Channel frame is to done as per drawing. Proper alignment of C&R panel to be done. The earthing of control & relay panel to be done . Making of all inter connection for the control & relay panel on terminal block as per drawing including all AC & DC connections

1

9600

9600

... More
132 KV Solid core Insulator Shifting up to Civil foundation and placement on structure and fixing of all accessories, making all connections, Checking and installation of insulator base and Surge counters, making all jumpers etc...

6

8640

1440

... More
Stringing of over head gantries vertical droppers with ACSR conductor including fixing of insulator string spares, clamps etc (Single Zebra Conductor).

300

19500

65

... More
Stringing of Screening Conductor/OH shield wire

200

5000

25

... More
Shifting & Placement of all the three circuit breaker Poles on structure including shifting with in Substation premises. Complete assembly of 33 KV Circuit Breaker including erection of mechanism Box interconnections piping work, erection of all accessories of the equipments & making interconnections and its earthing

1

12000

12000

... More
Shifting of 33 KV Current Transformer from Sub-station premises to Civil foundation and placement on structure and Erection of CT ,fixing of junction Box , including all accessories , making all jumpers etc.

3

10800

3600

... More
Shifting and placement of complete 33 KV isolator without Earth switch (Three Phase) in all three phase of isolator on structure and its earthing along with mounting of mechanism Box, interconnections piping, alignment of contacts & all accessories along with application of Petroleum Jelly on Jaws & Contracts

2

21600

10800

... More
33 KV C&R Panel for Bus couler, shifting up to control room (including storage if required) and placement complete with all relays & accessories . The placement of C&R panel to be done on MS channel frame and MS channel frame will suitable grouted in control room as per drawing . The cutting welding & fabrication of MS Channel frame is to done as per drawing. Proper alignment of C&R panel to be done. The earthing of control & relay panel to be done . Making of all inter connection for the control & relay panel on terminal block as per drawing including all AC & DC connections

1

7800

7800

... More
33 KV Solid core Insulator Shifting up to Civil foundation and placement on structure and fixing of all accessories, making all connections, Checking and installation of insulator base and Surge counters, making all jumpers etc...

3

2160

720

... More
Laying of cables 2 Core x 2.5 Sq.mm Unarmoured on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables

500

5000

10

... More
Laying of cables 4 Core x 2.5 Sq.mmUnarmoured on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables

500

6000

12

... More
Laying of cables 8 Core x 2.5 Sq.mmUnarmoured on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables

500

7000

14

... More
Laying of cables 12 Core x 2.5 Sq.mmUnarmoured on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables

500

9000

18

... More
Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 2 Core x 2.5 Sq.mm Unarmoured control / Power cables, including terminations at both end

10

1020

102

... More
Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 4 Core x 2.5 Sq.mm Unarmoured control / Power cables, including terminations at both end

8

960

120

... More
Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 8 Core x 2.5 Sq.mm Unarmoured control / Power cables, including terminations at both end

8

1440

180

... More
Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 12 Core x 2.5 Sq.mm Unarmoured control / Power cables, including terminations at both end

8

1920

240

... More
Laying of Flat (65 mm x 8 mm) duly buried at a depth of 0.5 mtr. providing or risers for structures earthing including back filling welding etc. structure earthing of following length.

200

15600

78

... More
Laying of Flat (50 mm x 6 mm ) duly buried at a depth of 0.5 mtr. providing or risers for structures earthing including back filling welding etc. structure earthing of following length.

300

18000

60

... More
25mm dia x 3000 mm long M.S. rod earth electrodes installation directly driven/drilled (6’’ dia) into earth including excavation (inrespective of type of soil encountered) backfilling with betonite soil (to be arranged by contractor) welding to earth conductor etc.

10

10800

1080

... More
Preparation of earthing pits (1.5x1.5x3 Mtrs) as per boards drawing No. XII-8-774b, which includes excavation (Irrespective of the soil encountered) embading of 4 No GI Pipes of size 40mm dia, 3 Mtrs long back filling with B.C. soil (to be arranged by the contractor) free from boulders and harmful mixture. These GI pipes are to be welded with MS flats by making mesh frame and cutting of pipes as also making holes in the pipe for water seepage. The earth pit is to be connected with earth mesh of MS flat

2

21600

10800

... More
Installation of HPSV/HPMH light fixtures (250 Watt) on gantry columns in supply connection to the light fitting from the nearest lighting board in the yard etc.

5

2400

480



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.