MP Power Transmission Company Limited Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
MP Power Transmission Company Limited - MPPTCL Tender
Civil And Construction
Eprocure
Opening Date20 Jun 2024
Closing Date24 Jul 2024
Tender AmountRefer Documents
Costs
EMD
₹ 7,700Document Cost
₹ 590Tender Fee
₹ 295
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MPPTC_352012_1Bid Award Id
ViewTender No
4384000/NIT/TS-01/166 Dt.19.06.2024Tender Authority
MP Power Transmission Company Limited ViewPurchaser Address
-Website
http://https://mptenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Complete Erection of 02 no. 33KV Feeder Bay for 33KV New Feeder for West Discom Under (RDSS Scheme) At 132KV Substation Pandhana under Executive Engineer (400KV Testing Dn.) Chhegaon
BOQ Items
Stringing of ACSR Conductor on overhead gantries, vertical droppers including fixing of insulator string, spacers, clamp etc.
Screening conductor
100
2500
25
Erection of 33 KV Circuit Breaker (3 Phase):
Unloading and shifting of Circuit Breaker from the carriage and placement of C.B. on structure. Complete assembly of C.B. including Erection of control cabinet and mechanism box. Erection of all accessories for the Equipment
2
24000
12000
Erection of 33 KV Current Transformer:
Unloading of C.T. from the carriage and Shifting of 33 KV C.T. up to Civil foundation and placement on structure and fixing of junction Box, including all accessories, making all jumpers etc.
6
21600
3600
Erection of 33 KV Isolator without Earth switch (3phase):
Unloading of Isolator Without Earth switch from the carriage and shifting up to Civil foundation and placement of complete isolator in all three phase of isolator structure,Insulator and Erection/mounting of mechanism box, interconnection piping, alignment of contacts and all associated activities to make the installation completed including checking of successful technical and electrical operation.
4
43200
10800
Erection of 33 KV Isolator with Earth switch (3phase):
Unloading of Isolator with Earth switch from the carriage and shifting up to Civil foundation and placement of complete isolator in all three phase of isolator structure, Insulator and Erection/mounting of mechanism box, interconnection piping, alignment of contacts and all associated activities to make the installation completed including checking of successful technical and electrical operation.
2
21600
10800
Erection of 33 KV Surge Lightning Arrester:
Unloading of L.A. from the carriage and Shifting of 33 KV Surge Lightning Arrester and placement on structure and fixing of all accessories, making all connections, checking and installation of insulator base and Surge counters, making all jumpers etc.
6
14400
2400
Control & Relay Panel for 33 KV Feeder (2F):
Unloading of C&R Panel, shifting up to control room (including storage if required) and placement complete with all relays & accessories. The placement of C&R panel to be done on MS channel frame and MS channel frame will suitable grouted in control room as per drawing. The cutting welding & fabrication of MS Channel frame is to done as per drawing. Proper alignment of C&R panel to be done. The earthing of control & relay panel to be done. Making of all inter connection for the control & relay panel on terminal block as per drawing including all AC & DC connections.
1
7800
7800
Erection of 33 KV P.I./ Solid Core Insulators:
Unloading of P.I. from the carriage and proper Stocking/Storage and Erection of 33 KV P.I. and their Connections
9
6480
720
Laying of cables on rack/cable trays/angle support overhead racks, conducts including dressing of cables with accessories for copper conductor and armour control cables:
2 Core x 2.5 sq.mm.
100
1000
10
Laying of cables on rack/cable trays/angle support overhead racks, conducts including dressing of cables with accessories for copper conductor and armour control cables:
4 Core x 2.5 sq.mm.
600
7200
12
Laying of cables on rack/cable trays/angle support overhead racks, conducts including dressing of cables with accessories for copper conductor and armour control cables:
8 Core x 2.5 sq.mm.
200
2800
14
Laying of cables on rack/cable trays/angle support overhead racks, conducts including dressing of cables with accessories for copper conductor and armour control cables:
12 Core x 2.5 sq.mm.
200
6000
30
Cable terminations including fixing of cable glands, lugs etc. for each type of control / Power cables, including terminations at both end:
2 Core x 2.5 sq.mm.
6
612
102
Cable terminations including fixing of cable glands, lugs etc. for each type of control / Power cables, including terminations at both end:
4 Core x 2.5 sq.mm.
6
720
120
Cable terminations including fixing of cable glands, lugs etc. for each type of control / Power cables, including terminations at both end:
8 Core x 2.5 sq.mm.
4
720
180
Cable terminations including fixing of cable glands, lugs etc. for each type of control / Power cables, including terminations at both end:
12 Core x 2.5 sq.mm.
4
960
240
Erection of Junction Box
4
4800
1200
Installation of HPSV/HPMH Lighting Fixture (250 Watt) on gantry column:
Unloading of HPSV/HPMH Lighting Fixture (250 Watt) from the carriage and proper stocking/storage and erection of HPSV/HPMH Lighting Fixture (250 Watt) and their connections
10
4800
480
EARTHING INSTALLATION:
25 mm dia X 3000mm long M.S. rod earth electrodes installation directly driven / drilled (40 to 50 mm dia) into earth including excavation (irrespective of type of soil encountered), backfilling with bentonite soil (to be arranged by contractor) welding to earth conductor etc.
10
10800
1080
EARTHING INSTALLATION:
Installation of steel risers and making earth mat (duly buried at a depth of 0.5 mtrs.) including back filling welding etc. and bolting of risers to the structures/ equipments at desired place: 65x8mm
1250
97500
78
EARTHING INSTALLATION:
Installation of steel risers and making earth mat (duly buried at a depth of 0.5 mtrs.) including back filling welding etc. and bolting of risers to the structures/ equipments at desired place: 50x6mm
500
30000
60
Preparation of Earthing Pits (1.5 x 1.5 x 3 meter) as per approved drawing which includes excavation (irrespective of the soil encountered), embedding of 4 nos. GI Pipes of size 40 mm dia3-Meter-long, backfilling with B.C. soil (soil to be arranged by contractor) free from boulders and harmful mixture. These GI Pipes are to be welded with M.S. flats by making mesh frame and cutting of pipes as also making holes in the pipe for water seepage. The earth pit is to be connected with earth mesh by M.S. flat.
(G.I. pipe will be provided by MPPTCL).
2
21600
10800