MP Power Transmission Company Limited Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
MP Power Transmission Company Limited - MPPTCL Tender
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date4 Mar 2024
Closing Date27 May 2024
Tender AmountRefer Documents
Costs
EMD
₹ 9,200Document Cost
₹ 590Tender Fee
₹ 295
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MPPTC_339684_1Bid Award Id
ViewTender No
4381000/TS-15/2023-24/1128 DT. 04.03.2024Tender Authority
MP Power Transmission Company Limited ViewPurchaser Address
-Website
http://https://mptenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Dismantling & Shifting of Equipment :- Complete Dismantling of equipment on structure along with connected jumpers and clamps & connectors including shifting and placement within S/s Premises. 132 KV Lightning Arrestor
3
7200
2400
Dismantling & Shifting of Equipment :- Complete Dismantling of equipment on structure along with connected jumpers and clamps & connectors including shifting and placement within S/s Premises. 33 KV CT (800/1-1-1)
3
5400
1800
Dismantling & Shifting of Equipment :- Complete Dismantling of equipment on structure along with connected jumpers and clamps & connectors including shifting and placement within S/s Premises. 33 KV Lightning Arrestor
3
3600
1200
Dismantling & Shifting of Equipment :- Complete Dismantling of equipment on structure along with connected jumpers and clamps & connectors including shifting and placement within S/s Premises. 33 KV Isolator
1
5400
5400
Erection of Equipment :- Complete erection, unloading from carriage and shifting of equipment and placement on civil foundation and fixing of junction / mechanism boxes, all aceessories, making all connections, interconnecting piping, alignment of contact, installation of insulator base, making all jumpers and all associated activities to make the installation completed including checking of successful technical and electrical operation.
132 KV Lightning Arrestor
3
14400
4800
Erection of Equipment :- Complete erection, unloading from carriage and shifting of equipment and placement on civil foundation and fixing of junction / mechanism boxes, all aceessories, making all connections, interconnecting piping, alignment of contact, installation of insulator base, making all jumpers and all associated activities to make the installation completed including checking of successful technical and electrical operation.
132 KV Isolator
3
54000
18000
Erection of Equipment :- Complete erection, unloading from carriage and shifting of equipment and placement on civil foundation and fixing of junction / mechanism boxes, all aceessories, making all connections, interconnecting piping, alignment of contact, installation of insulator base, making all jumpers and all associated activities to make the installation completed including checking of successful technical and electrical operation.
33KV CT (1200/1-1-1)
3
10800
3600
Erection of Equipment :- Complete erection, unloading from carriage and shifting of equipment and placement on civil foundation and fixing of junction / mechanism boxes, all aceessories, making all connections, interconnecting piping, alignment of contact, installation of insulator base, making all jumpers and all associated activities to make the installation completed including checking of successful technical and electrical operation.
33 KV Lightning Arrestor
3
7200
2400
Erection of Equipment :- Complete erection, unloading from carriage and shifting of equipment and placement on civil foundation and fixing of junction / mechanism boxes, all aceessories, making all connections, interconnecting piping, alignment of contact, installation of insulator base, making all jumpers and all associated activities to make the installation completed including checking of successful technical and electrical operation.
33 KV Isolator
1
10800
10800
Stringing of ACSR Conductor on overhead gantries, vertical droppers including fixing of insulator string, spacers, clamp etc.
ACSR Single Zebra conductor
300
19500
65
Stringing of ACSR Conductor on overhead gantries, vertical droppers including fixing of insulator string, spacers, clamp etc.
ACSR Twin Zebra conductor
200
25200
126
EARTHING INSTALLATION:
Installation of steel risers and making earth mat (duly buried at a depth of 0.5 mtrs.) including back filling welding etc. and bolting of risers to the structures/ equipments at desired place: 65x8mm
500
39000
78
EARTHING INSTALLATION:
Installation of steel risers and making earth mat (duly buried at a depth of 0.5 mtrs.) including back filling welding etc. and bolting of risers to the structures/ equipments at desired place: 50x6mm
500
30000
60
EARTHING INSTALLATION:
25 mm dia X 3000mm long M.S. rod earth electrodes installation directly driven / drilled (40 to 50 mm dia) into earth including excavation (irrespective of type of soil encountered), backfilling with bentonite soil (to be arranged by contractor) welding to earth conductor etc.
15
16200
1080
Preparation of Earthing Pits (1.5 x 1.5 x 3 meter) as per approved drawing which includes excavation (irrespective of the soil encountered), embedding of 4 nos. GI Pipes of size 40 mm dia3-Meter-long, backfilling with B.C. soil (soil to be arranged by contractor) free from boulders and harmful mixture. These GI Pipes are to be welded with M.S. flats by making mesh frame and cutting of pipes as also making holes in the pipe for water seepage. The earth pit is to be connected with earth mesh by M.S. flat.
(G.I. pipe will be provided by MPPTCL).
3
32400
10800
Laying of cables on rack/cable trays/angle support overhead racks, conducts including dressing of cables with accessories for copper conductor and armour control cables:
8 Core x 2.5 sq.mm.
500
7000
14
Laying of cables on rack/cable trays/angle support overhead racks, conducts including dressing of cables with accessories for copper conductor and armour control cables:
12 Core x 2.5 sq.mm.
1000
18000
18
Laying of cables on rack/cable trays/angle support overhead racks, conducts including dressing of cables with accessories for copper conductor and armour control cables:
19 Core x 2.5 sq.mm.
500
15000
30
Cable terminations including fixing of cable glands, lugs etc. for each type of control / Power cables, including terminations at both end:
8 Core x 2.5 sq.mm.
10
1800
180
Cable terminations including fixing of cable glands, lugs etc. for each type of control / Power cables, including terminations at both end:
12 Core x 2.5 sq.mm.
15
3600
240
Cable terminations including fixing of cable glands, lugs etc. for each type of control / Power cables, including terminations at both end:
19 Core x 2.5 sq.mm.
10
4200
420