Madhya Pradesh Power Generating Company Limited Tender
... More
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Madhya Pradesh Power Generating Company Limited - MPPGCL Tender
Energy, Oil and Gas
Eprocure
Opening Date7 Feb 2025
Closing Date3 Mar 2025
Tender Amount₹ 8,61,70,310
Costs
EMD
₹ 8,61,800Document Cost
₹ 5,000Tender Fee
₹ 1,534
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MPPGC_398084_1Tender No
398084Tender Authority
Madhya Pradesh Power Generating Company Limited ViewPurchaser Address
-Website
http://http://www.mppgcl.mp.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
CLEANING OF ASH FROM ECONOMISER HOPPER WITH CONNECTING DUCTS
3
-
-
... More
CLEANING OF PENT HOUSE, CAT HOUSE, DEAD CHAMBER
3
-
-
... More
BOTTOM ASH HOPPER CLEANING
3
-
-
... More
PREPARATION OF SCAFFOLDING
-
-
-
... More
PREPARATION OF SCAFFOLDING ABOVE ECONOMISER HOPPER FOR INSPECTION OF ECONOMISER COILS
3
-
-
... More
PREPARATION OF QUICK ERECT SCAFFOLDING SYSTEM (CUP-LOCK SYSTEM) IN BOILER FURNACE (FROM TOP TO BOTTOM) along with providing cup-lock system by firm
3
-
-
... More
PREPARATION OF SCAFFOLDING IN BOTTOM ASH HOPPER
3
-
-
... More
INSPECTION
-
-
-
... More
INSPECTION OF COMPLTE BOILER PRESSURE PARTS (IST & IIND PASS)
3
-
-
... More
INSPECTION & REPAIR OF ALL DOORS ,WINDOWS AND PEEP HOLES IN BOILER
35
-
-
... More
HEADER INSPECTION & INSPACTION OF SPRAY NOZZLE ATTEMPERATOR
30
-
-
... More
INTERNAL INSPECTION & CLEANING OF BOILER DRUM
3
-
-
... More
CLEANING AND REPAIR OF WIND BOX
-
-
-
... More
WITH STEEL
6
-
-
... More
WITHOUT STEEL
1200
-
-
... More
DYE PENETRATION TEST (DP TEST) WITH KIT
7000
-
-
... More
HYDRO JET CLEANING OF COMPLETE BOILER PRESSURE PARTS
-
-
-
... More
PLATEN SUPERHEATER COILS.
3
-
-
... More
PENDENT RE-HEATER COILS.
3
-
-
... More
FINAL SUPERHEATER
3
-
-
... More
WATER WALL ( FRONT, REAR, LEFT & RIGHT, ROOF)
3
-
-
... More
ASSISTANCE IN RADIOGRAPHY
3
-
-
... More
RECTIFICATION, REPLACEMENT AND REFIXING OF CASSETTE BAFFLES IN VARIOUS AREAS OF BOILER TUBES.
350
-
-
... More
FABRICATION & FIXING OF EROSION SHIELD
600
-
-
... More
FIXING OF EROSION SHIELD
6500
-
-
... More
REMOVAL OF EROSION SHIELD
5500
-
-
... More
PREPARATION OF BOILER TUBE SURFACE FOR TUBE THICKNESS SURVEY/OXIDE SCALE MEASUREMENT/STRESS RELIEVING
150000
-
-
... More
WELDING OF HP JOINTS OF BOILER TUBES
-
-
-
... More
WATER WALL TUBES-SCREEN TUBES, HANGER TUBES, REAR ARCH TUBES ETC.
400
-
-
... More
PRIMARY SUPERHEATER TUBES
1200
-
-
... More
PLATEN SUPERHEATER TUBES
800
-
-
... More
FINAL SUPERHEATER TUBES
600
-
-
... More
HORIZONTAL REHEATER
700
-
-
... More
PENDANT REHEATER
905
-
-
... More
ECONOMIZER TUBES
2100
-
-
... More
SLING
5
-
-
... More
RISER
5
-
-
... More
BLEED
102
-
-
... More
HYDRASTEP
40
-
-
... More
INSTRUMENT PIPINGS
150
-
-
... More
WELDING OF FINS
1800
-
-
... More
ECONOMIZER/WATER WALL/CAGE WALL
1500
-
-
... More
SLING
100
-
-
... More
REHEATER
200
-
-
... More
DRUM VENT
50
-
-
... More
WELDING & REPLACEMENT OF DRAIN & VENTS JOINTS
500
-
-
... More
WELDING & REPLACEMENT OF TRACING LINE / SAMPLING LINE
60
-
-
... More
REPLACEMENT OF COILS- Primary Super Heater Coils (Bottom/Middle/Top), Economizer Coils (Bottom/Middle/Top)
694
-
-
... More
PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS (SIZE 50MM X 50MM)
1200
-
-
... More
PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS (SIZE 50MM X 100MM)
200
-
-
... More
PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS (SIZE 50MM X 300MM)
200
-
-
... More
ALIGNMENT OF COILS/ TUBES
-
-
-
... More
ALIGNMENT OF COILS OF SH DIVISIONAL PANEL/FINAL
60
-
-
... More
ALIGNMENT OF COILS OF PLATEN SUPERHEATERS
35
-
-
... More
ALIGNMENT OF COIL OF ECONOMISER
220
-
-
... More
ALIGNMENT OF COIL OF LTSH (UPPER / LOWER) / PRIMARY SH
150
-
-
... More
ALIGNMENT OF REHEATER COIL (HORIZONTAL / PENDENT)
150
-
-
... More
ASSISTANCE IN HYDRAULIC TEST OF BOILER PRESSURE PART & PREPARATION FOR BOILER LIGHT UP
3
-
-
... More
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GR.A+GR.C+PLASTIC)
-
-
-
... More
BURNER MOUTH
15
-
-
... More
PENT HOUSE, DOOR, WINDOW MANHOLE & PEEPHOLE, ETC
15
-
-
... More
DEAD CHAMBER & SCREEN VALVE
11
-
-
... More
COOLING PIPE OF SEAL PLATE (BOTTOM ASH HOPPER)
27
-
-
... More
OTHER AREAS (LIKE HOPPER HEADER ETC.)
7
-
-
... More
REMOVAL / BREAKING OF DAMAGED REFRACTORY & TRANSPORTATION
24
-
-
... More
COMPLETE SERVICING/OVERHAULING OF HP VALVES (GLAND PACKING OF HP VALVES)
-
-
-
... More
UPTO 25 MM
90
-
-
... More
25 MM TO 50 MM
100
-
-
... More
50MM TO 100 MM
60
-
-
... More
100 MM TO 200 MM
24
-
-
... More
COMPLETE SERVICING OF VALVES (EXCLUDING ACTUATOR):
-
-
-
... More
UPTO 25 MM
90
-
-
... More
25 MM TO 50 MM
135
-
-
... More
50 MM TO 100 MM
30
-
-
... More
100 MM TO 200 MM
15
-
-
... More
REPLACEMENT OF VALVES (WELDED TYPE)
-
-
-
... More
UPTO 25 MM
30
-
-
... More
25 MM TO 50 MM
20
-
-
... More
50 MM TO 100 MM
6
-
-
... More
100 MM And Above
6
-
-
... More
SERVICING OF MAIN STEAM STOP VALVE
6
-
-
... More
SERVICING OF VALVE/CONTROL VALVE OF FEED REGULATING STATION IN-SITU
14
-
-
... More
REPLACEMENT OF FEED CONTROL VALVE/safety valve
2
-
-
... More
COMPLETE SERVICING OF SPRING LOADED SAFETY VALVES (SV)
-
-
-
... More
BOILER DRUM SV
7
-
-
... More
MAIN STEAM LINES SV
6
-
-
... More
CRH LINES SV
12
-
-
... More
HRH LINES SV
6
-
-
... More
BAS LINE SV
6
-
-
... More
PREPARATION / FABRICATION OF HP TUBE BENDS
300
-
-
... More
REPAIR OF PENT HOUSE OF BOILER
-
-
-
... More
REPAIR OF PENT HOUSE BY PATCHING (WITHOUT STEEL)
2000
-
-
... More
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)
15
-
-
... More
REPAIRING SEALING DEAD CHAMBER
3
-
-
... More
BUCKSTAYS
60
-
-
... More
DIAMOND TYPE LOCKS
150
-
-
... More
ROCKERS
150
-
-
... More
REPAIRING OF ECONOMISER HOPPERS & CONNECTION JOINT DUCTING & MAKING / STREGNTHEN OF THEIR PLATEFORM
3
-
-
... More
REPAIRING OF ECONOMIZER CASING
3
-
-
... More
REPAIRING OF BOTTOM ASH HOPPER LINER & SEAL TROUGH INCLUDING FIXING OF DIPPER PLATE
3
-
-
... More
REPAIRING OF FURNACE ZONE & REST OF THE AREAS
-
-
-
... More
WITH STEEL
6
-
-
... More
WITHOUT STEEL
900
-
-
... More
REPAIRING OF SECOND PASS CASING
-
-
-
... More
WITH STEEL
12
-
-
... More
WITHOUT STEEL
1200
-
-
... More
DISMNETLING, INSTALLATION, FEBRICATION OF STRUTURE & MISC. WORKS I.E. CANOPY, BROKEN STAIR/RAILING/DRAIN COVERING ETC.
9
-
-
... More
REPLACEMENT / STRENGTHENING OF BAFFLE PLATE BETWEEN PRIMARY SUPER HEATER & HORIZONTAL RE-HEATER
-
-
-
... More
WITHOUT STEEL
200
-
-
... More
REPAIRING/SEALING OF CAT HOUSE
1
-
-
... More
INSTALLATION OF MITP
210
-
-
... More
SERVICING, CLEANING & REPAIRING OF SAMPLING LINE COOLERS
6
-
-
... More
SERVICING & REPAIRING OF HANGERS & SUPPORTS
150
-
-
... More
REPAIRING OF Tapper DUCT & NEAR BY AREAS
-
-
-
... More
WITH STEEL
3
-
-
... More
WITHOUT STEEL
700
-
-
... More
REPAIRING OF RE-HEATER & SUPER HEATER AERO DYNAMIC DAMPER INCLUDING TOP / BOTTOM & NEAR BY AREAS
1
-
-
... More
DISPOSAL OF RUBBISH THERMAL INSULATION
3
-
-
... More
Insulation Work
-
-
-
... More
REMOVAL & APPLICATION OF THERMAL INSULATION IN COMPLETE BOILER FROM BOTTOM ASH HOPPER TO PENT HOUSE
3000
-
-
... More
REMOVAL & APPLICATION OF THERMAL INSULATION IN STEAM AND WATER PIPING
1500
-
-
... More
REMOVAL & APPLICATION OF THERMAL INSULATION IN ESP
2100
-
-
... More
REMOVAL & APPLICATION OF THERMAL INSULATION INAIR HEATER & HOPPER
1600
-
-
... More
COAL MILL, FUEL OIL AND ITS STEAM PIPING INCLUDING HEATERS FILTERS ETC.
900
-
-
... More
FLUE GAS & HOT AIR DUCT
1400
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%