Madhya Pradesh Power Generating Company Limited Tender

Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.

Madhya Pradesh Power Generating Company Limited - MPPGCL Tender

Works
Machinery and Tools
Eprocure
Opening Date7 Apr 2023
Closing Date1 May 2023
Tender Amount₹ 1,70,05,000 
Notes
Download

Costs

  • EMD

    ₹ 2,00,000
  • Document Cost

    ₹ 5,000
  • Tender Fee

    ₹ 1,534

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Internal Cleaning of Pent House

10

-

-

... More
Internal Cleaning of Dead Chamber

4

-

-

... More
Internal Cleaning of Economiser Hopper up to Eco Duct

20

-

-

... More
Internal Cleaning of 2nd pass of Boiler

4

-

-

... More
Transpotation of Ash, Debris and other waste material including loading/unloading

3000

-

-

... More
Preparation of Scaffolding

-

-

-

... More
Preparation of scaffolding from bottom ash hopper to goose neck/roof

2

-

-

... More
Preparation of Scaffolding above Goose Neck for Inspection of Pendent Re-heater / Final / Platen Super Heater

12

-

-

... More
Welding of HP Joints of Boiler tubes

-

-

-

... More
Economizer Tube / Stringer Tubes

800

-

-

... More
Primary Super Heater

100

-

-

... More
Final Super Heater / Platen Super Heater

80

-

-

... More
Water Wall/Cage wall tube

40

-

-

... More
Horizontal/Pendent Re-heater

700

-

-

... More
Bleed Tubes

10

-

-

... More
Slings Tubes

20

-

-

... More
Hydra Step HP Line

40

-

-

... More
Various Drains & Vents lines

200

-

-

... More
Alignment of Coils/Tubes

-

-

-

... More
Alignment of Economiser Coils

200

-

-

... More
Alignment of Primary Super Heater Coils

40

-

-

... More
Alignment of Horizontal / Pendent Re-heater Coils

100

-

-

... More
REPAIRING OF BOILER

-

-

-

... More
Repairing of Wind Box with Steel

10

-

-

... More
Repairing of Wind Box without Steel

600

-

-

... More
Repairing of Furnace Man Hole / Peep Hole / View Window

20

-

-

... More
Repairing of Skin Casing / Hoppers & Support of Furnace with Steel

10

-

-

... More
Repairing of Skin Casing / Hoppers & Support of Furnace without Steel

1500

-

-

... More
HP VALVES

-

-

-

... More
Replacement of HP Valve size upto 25 mm

30

-

-

... More
Servicing of HP Valve size upto 25 mm

40

-

-

... More
Gland Packing of HP Valve size upto 25 mm

60

-

-

... More
Replacement of HP Valve size above 25 to 100 mm

20

-

-

... More
Servicing of HP Valve size above 25 to 100 mm

70

-

-

... More
Gland Packing of HP Valve above 25 to 100 mm

150

-

-

... More
Replacement of HP Valve size above 100 mm

7

-

-

... More
Servicing of HP Valve size above 100 mm

25

-

-

... More
Gland Packing of HP Valves size above 100 mm

40

-

-

... More
Servicing of spring loaded safety valves (Drum/MS/CRH/HRH/BAS)

10

-

-

... More
MISCELANEOUS

-

-

-

... More
Bend Fabrication

40

-

-

... More
Welding on Eroded Tubes size (50 x 50) sq.mm

1200

-

-

... More
Header Inspection and Flushing/Attemperator Nozzle inspection

10

-

-

... More
Assistance in Hydraulic test of boiler

2

-

-

... More
Assistance in Thickness Survey & Radiography

16

-

-

... More
Fixing of Erosion Shield

2000

-

-

... More
Application of Cassette Baffle

600

-

-

... More
Welding of Fins

500

-

-

... More
Servicing, Cleaning, Repairing of sampling line of coolers

6

-

-

... More
Application of Refractory - Grade A/ P/C/ Plastic (At any area)

17

-

-

... More
Reinforcement of Welding Joints

3000

-

-

... More
Assistant in Safety Valve Setting

4

-

-

... More
Removal and Application of Thermal Insulation

1000

-

-

... More
Disposal of Rubish Thermal Insulation

2

-

-

... More
Dismantling, Installation, Fabrication of Structure & Misc. Work i.e. Canopy, Broken Stair / Railing / Drain Covering etc.

15

-

-

... More
Initial Mobilization Charge

16

-

-

... More
Painting of Boiler structure

6000

-

-

... More
Servicing and repairing of hangers & supports

40

-

-

... More
PH-III 1X500 MW

-

-

-

... More
CLEANING OF BOILER

-

-

-

... More
COMPLETE EXTERNAL CLEANING OF BOILER FROM TOP TO BOTTOM

3

-

-

... More
INTERNAL CLEANING OF BOILER IN SECOND PASS

2

-

-

... More
CLEANING OF ASH FROM ECONOMISER HOPPER

1

-

-

... More
CLEANING OF PENT HOUSE, CAT HOUSE, DEAD CHAMBER, WIND BOX

4

-

-

... More
BOTTOM ASH HOPPER CLEANING

1

-

-

... More
PREPARATION OF SCAFFOLDING

-

-

-

... More
BOILER HORIZONTAL PASS (SCREEN TUBES, LTSH TERMINAL, RH/SH)

4

-

-

... More
ABOVE ECONOMISER HOPPER FOR INSPECTION OF ECONOMISER LOWER BANK COILS & C-HEADER.

2

-

-

... More
WIND BOX IN ALL FOUR CORNER

1

-

-

... More
CAT HOUSE FOR FRONT/REAR S-PANEL BACKSIDE CHECKING, REPAIRING

1

-

-

... More
BOTTOM ASH HOPPER UP TO S-PANEL TUBES

1

-

-

... More
PREPARATION AND OPERATION OF SKY CLIMBER IN FURNACE

3

-

-

... More
INSPECTION

-

-

-

... More
INSPECTION OF COMPLETE BOILER PRESSURE PARTS (1ST & 2ND PASS)

1

-

-

... More
INSPECTION & REPAIR OF ALL DOORS ,WINDOWS AND PEEP HOLES IN BOILER

10

-

-

... More
SERVICING OF SECONDARY AIR DAMPERS

10

-

-

... More
DYE PENETRATION TEST (DP TEST) WITH KIT (1sq. Inch = 645 sq. mm)

500

-

-

... More
TRANSPORTATION OF ASH, SCRAPS, DEBRIES AND OTHER WASTE MATERIALS (INCLUDING LOADING/UNLOADING)

500

-

-

... More
ASSISTANCE IN RADIOGRAPHY

5

-

-

... More
ASSISTANCE IN SAFETY VALVE SETTING

1

-

-

... More
ASSISTANCE IN SOOT BLOWING IN BOILER

730

-

-

... More
ASSISTANCE IN HYDRAULIC TEST OF BOILER PRESSURE PART & PREPARATION FOR BOILER LIGHT UP

1

-

-

... More
RECTIFICATION, REPLACEMENT AND REFIXING OF PROTECTION SLEEVE (SHIELDING) IN VARIOUS AREAS OF BOILER TUBES.

500

-

-

... More
RECTIFICATION, REPLACEMENT AND REFIXING OF CASSETTE BAFFLES IN VARIOUS AREAS OF BOILER TUBES.

50

-

-

... More
REPAIR & REFIXING OF PROTECTION PLATE OVER LTSH/ECO COIL BENDS (1000X300X5)MM

10

-

-

... More
PREPARATION OF BOILER TUBE SURFACE FOR TUBE THICKNESS SURVEY/ OXIDE SCALE MEASUREMENT/ STRESS RELIEVING

8000

-

-

... More
WELDING OF HP JOINTS OF BOILER TUBES

-

-

-

... More
WATER WALL TUBES, SCREEN TUBES, HANGER TUBES, REAR ARCH TUBES ETC.

50

-

-

... More
REPLACEMENT OF WW BURNER PANEL TUBES

30

-

-

... More
STEAM COOLED WALL TUBES

20

-

-

... More
DIVISIONAL SUPERHEATER TUBES

30

-

-

... More
PLATEN SUPERHEATER TUBES

30

-

-

... More
SUPERHEATER STEAM COOLED SPACER TUBES

10

-

-

... More
PENDANT REHEATER FRONT & REAR

100

-

-

... More
REHEATER CROSS OVER TUBES

20

-

-

... More
REHEATER STEAM COOLED SPACER TUBES

10

-

-

... More
LTSH TUBES

50

-

-

... More
LTSH SUPPORT TUBES

20

-

-

... More
ECONOMISER TUBES

100

-

-

... More
ECONOMISER SUPPORT TUBES

40

-

-

... More
ROOF TUBES

10

-

-

... More
HEADER STUBS

5

-

-

... More
HYDRASTEP TUBES

10

-

-

... More
INSTRUMENT PIPINGS

10

-

-

... More
WELDING & REPLACEMENT OF DRAIN & VENT JOINTS

200

-

-

... More
WELDING & REPLACEMENT OF SAMPLING LINE

100

-

-

... More
WELDING OF FINS

100

-

-

... More
RE-ENFORCEMENT OF WELDED JOINTS

100

-

-

... More
ALIGNMENT OF COILS/ TUBES / BLOWERS

-

-

-

... More
ALIGNMENT OF COILS OF DIVISIONAL SH PANEL

5

-

-

... More
ALIGNMENT OF COILS OF PLATEN SUPERHEATERS

10

-

-

... More
ALIGNMENT OF REHEATER COIL (FRONT/ REAR)

20

-

-

... More
ALIGNMENT OF COIL OF LTSH (UPPER / LOWER)

30

-

-

... More
ALIGNMENT OF COIL OF ECONOMISER (UPPER / MIDDLE / LOWER)

30

-

-

... More
CHECKING AND RECTIFICATION OF EXPANSION INDICATOR IN BOILER AREA

5

-

-

... More
GLAND PACKING OF HP/LP VALVES

-

-

-

... More
UPTO 25 MM

20

-

-

... More
25 MM TO 50 MM

30

-

-

... More
50MM TO 100 MM

20

-

-

... More
ABOVE 100 MM

15

-

-

... More
COMPLETE SERVICING OF HP/LP VALVES (EXCLUDING ACTUATOR):

-

-

-

... More
UPTO 25 MM

30

-

-

... More
25 MM TO 50 MM

30

-

-

... More
50 MM TO 100 MM

20

-

-

... More
ABOVE 100 MM

15

-

-

... More
REPLACEMENT OF HP/LP VALVES (WELDED TYPE)

-

-

-

... More
UPTO 25 MM

30

-

-

... More
25 MM TO 50 MM

20

-

-

... More
50 MM TO 100 MM

5

-

-

... More
ABOVE 100 MM

5

-

-

... More
ASSISTANT IN REMOVAL/INSTALLATION OF ACTUATORS OF HP/LP VALVES

10

-

-

... More
SERVICING OF MAIN STEAM STOP VALVE

1

-

-

... More
COMPLETE SERVICING OF SPRING LOADED SAFETY VALVES (SV)

-

-

-

... More
BOILER DRUM SV

3

-

-

... More
MAIN STEAM LINES SV

2

-

-

... More
CRH LINES SV

2

-

-

... More
HRH LINES SV

2

-

-

... More
ELECTROMATIC RELIEF VALVE AND PILOT VALVE

2

-

-

... More
CLEANING / REPAIRING OF SAFETY VALVE DRAIN TRAY & LINE

5

-

-

... More
PREPARATION / FABRICATION OF HP TUBE BENDS

50

-

-

... More
REPAIR AND RE-FIXING OF SEAL PLATES OF S-PANEL AT BOTTOM ASH HOPPER

30

-

-

... More
REPAIR AND RE-FIXING OF REFRACTORY COOLING PIPE AT TROUGH SEAL.

20

-

-

... More
REPAIR OF PENT HOUSE OF BOILER

-

-

-

... More
REPAIR OF PENT HOUSE BY PATCHING (WITHOUT STEEL)

50

-

-

... More
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)

1

-

-

... More
REPAIR OF WIND BOX

-

-

-

... More
REPAIR OF WIND BOX BY PATCHING (WITHOUT STEEL)

50

-

-

... More
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)

1

-

-

... More
REPAIRING OF DEAD CHAMBER

-

-

-

... More
REPAIR OF DEAD CHAMBER BY PATCHING

50

-

-

... More
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)

1

-

-

... More
REPAIRING OF CAT HOUSE

-

-

-

... More
REPAIR OF CAT HOUSE BY PATCHING

50

-

-

... More
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES

1

-

-

... More
REPAIR & SERVICING

-

-

-

... More
BUCKSTAYS

5

-

-

... More
DIAMOND TYPE LOCKS

5

-

-

... More
ROCKERS

5

-

-

... More
DISMNETLING, INSTALLATION, FEBRICATION OF STRUTURE & MISC. WORKS I.E. CANOPY, BROKEN STAIR/RAILING/DRAIN COVERING ETC.

5

-

-

... More
SERVICING, CLEANING & REPAIRING OF SAMPLING LINE COOLERS

5

-

-

... More
CLEANING, SERVICING & REPAIRING OF HANGERS & SUPPORTS

10

-

-

... More
FIXING OF CORRUGATED GI SHEET AT BOILER ROOF & OTHER PLACES

50

-

-

... More
PAINTING OF BOILER BASE STRUCTURE & ASSOSIATED AUXILIARIES

1000

-

-

... More
APPLICATION OF REFRACTORY

-

-

-

... More
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GRADE A)

10

-

-

... More
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GRADE C/P)

30

-

-

... More
REMOVAL / BREAKING OF DAMAGED REFRACTORY & TRANSPORTATION

20

-

-

... More
THERMAL INSULATION WORK

-

-

-

... More
REMOVAL & APPLICATION OF THERMAL INSULATION (THICKNESS 100 MM)

2000

-

-

... More
REMOVAL & APPLICATION OF THERMAL INSULATION (THICKNESS 50 MM)

1000

-

-

... More
DISPOSAL OF RUBBISH THERMAL INSULATION

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.