Madhya Pradesh Power Generating Company Limited Tender

Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.

Madhya Pradesh Power Generating Company Limited - MPPGCL Tender

Works
Machinery and Tools
Eprocure
Opening Date2 Feb 2024
Closing Date11 Mar 2024
Tender Amount₹ 1,79,50,875 
Notes
Download

Costs

  • EMD

    ₹ 2,00,000
  • Document Cost

    ₹ 5,000
  • Tender Fee

    ₹ 1,534

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
INTERNAL CLEANING OF BOILER IN SECOND PASS

1

-

-

... More
CLEANING OF ASH FROM ECONOMISER HOPPER WITH CONNECTING DUCTS

1

-

-

... More
CLEANING OF PENT HOUSE, CAT HOUSE, DEAD CHAMBER

1

-

-

... More
CLEANING OF PENT HOUSE ROOF

1

-

-

... More
PREPARATION OF SCAFFOLDING

-

-

-

... More
PREPARATION OF SCAFFOLDING IN BOILER HORIZONTAL PASS (SCREEN TUBES, REHEATER, FINAL SUPER HEATER)

1

-

-

... More
PREPARATION OF SCAFFOLDING ABOVE ECONOMISER HOPPER FOR INSPECTION OF ECONOMISER LOWER BANK COILS & C-HEADER.

1

-

-

... More
PREPARATION OF QUICK ERECT SCAFFOLDING SYSTEM (CUP-LOCK SYSTEM) IN BOILER FURNACE (FROM TOP TO BOTTOM)

1

-

-

... More
PREPARATION OF SCAFFOLDING IN WIND BOX

1

-

-

... More
PREPARATION OF SCAFFOLDING IN BOTTOM ASH HOPPER

1

-

-

... More
INSPECTION

-

-

-

... More
INSPECTION OF COMPLETE BOILER PRESSURE PARTS (IST & IIND PASS)

1

-

-

... More
INSPECTION & REPAIR OF ALL DOORS ,WINDOWS AND PEEP HOLES IN BOILER

30

-

-

... More
INTERNAL INSPECTION & CLEANING OF BOILER DRUM

1

-

-

... More
CLEANING AND REPAIR OF WIND BOX

-

-

-

... More
WITH STEEL

1

-

-

... More
WITHOUT STEEL

100

-

-

... More
DYE PENETRATION TEST (DP TEST) WITH KIT

400

-

-

... More
TRANSPORTATION OF ASH, SCRAPS, MS SCRAPS, DEBRIES AND OTHER WASTE MATERIALS ( INCLUDING LOADING/UNLOADING)

1500

-

-

... More
HYDRO JET CLEANING OF COMPLETE BOILER PRESSURE PARTS

-

-

-

... More
PLATEN SUPERHEATER COILS.

1

-

-

... More
RE-HEATER COILS.

1

-

-

... More
WATER WALL ( FRONT, REAR, LEFT & RIGHT)

1

-

-

... More
SECTION-B

-

-

-

... More
ASSISTANCE IN RADIOGRAPHY

1

-

-

... More
RECTIFICATION, REPLACEMENT AND REFIXING OF PROTECTION SLEEVE (SHIELDING) IN VARIOUS AREAS OF BOILER TUBES.

3000

-

-

... More
RECTIFICATION, REPLACEMENT AND REFIXING OF CASSETTE BAFFLES IN VARIOUS AREAS OF BOILER TUBES.

500

-

-

... More
EROSION SHIELD

-

-

-

... More
FABRICATION & FIXING OF EROSION SHIELD

100

-

-

... More
PREPARATION OF BOILER TUBE SURFACE FOR TUBE THICKNESS SURVEY/ OXIDE SCALE MEASUREMENT/ STRESS RELIEVING/DPT

40000

-

-

... More
WELDING OF HP JOINTS OF BOILER TUBES

-

-

-

... More
WATER WALL TUBES-SCREEN TUBES, HANGER TUBES, REAR ARCH TUBES ETC.

800

-

-

... More
PLATEN SUPERHEATER TUBES

50

-

-

... More
LTSH TUBES AND ASSOCIATED STEAM COOLED WALL

500

-

-

... More
FINAL SUPERHEATER TUBES

50

-

-

... More
ROOF TUBES

10

-

-

... More
REHEATER

30

-

-

... More
ECONOMISER TUBES

1200

-

-

... More
INSTRUMENT PIPINGS

50

-

-

... More
WELDING OF FINS

900

-

-

... More
RE-ENFORCEMENT OF WELDED JOINTS i. ECONOMISER ii. SLING iii. REHEATER iv. DRUM VENT v LTSH

300

-

-

... More
WELDING & REPLACEMENT OF DRAIN JOINTS

200

-

-

... More
WELDING & REPLACEMENT OF TRACING LINE / SAMPLING LINE

100

-

-

... More
PAD WELDING OF ERODED TUBES OF VARIOUS SIZE

-

-

-

... More
PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS ( SIZE 50MM X 50MM)

500

-

-

... More
ALIGNMENT OF COILS/ TUBES / BLOWERS

-

-

-

... More
ALIGNMENT OF TUBES OF PLATEN SUPERHEATERS

50

-

-

... More
ALIGNMENT OF REHEATER COIL (FRONT/ REAR)

50

-

-

... More
ALIGNMENT OF WALLBLOWERS/SERVICING OF WALL BLOWERS

56

-

-

... More
ALIGNMENT /SERVICING OF LONG RETRACTABLE SOOT BLOWER

12

-

-

... More
ASSISTANCE IN HYDRAULIC TEST OF BOILER PRESSURE PART & PREPARATION FOR BOILER LIGHT UP

1

-

-

... More
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GR.A+GR.C)

-

-

-

... More
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GRADE A) 1.REAR ARCH 2. SOOT BOLWER AREA 3. OTHER LOCATIONS 4. BURNER MOUTH

5

-

-

... More
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GRADE C) (1). PENT HOUSE, DOOR, WINDOW MANHOLE & PEEPHOLE, ETC (2)DEAD CHAMBER & SCREEN VALVE (3) FLUE GAS EROSION PLATE OF LTSH & ECO BEND (4) COOLING PIPE OF SEAL PLATE (5) OTHER AREAS (LIKE HOPPER HEADER ETC.)

10

-

-

... More
SECTION-C

-

-

-

... More
COMPLETE SERVICING/OVERHAULING OF HP VALVES

-

-

-

... More
GLAND PACKING OF HP VALVES

-

-

-

... More
UPTO 25 MM

70

-

-

... More
25 MM TO 50 MM

70

-

-

... More
50MM TO 100 MM

60

-

-

... More
100 MM TO 200 MM

20

-

-

... More
ABOVE 200 MM

4

-

-

... More
COMPLETE SERVICING OF VALVES (EXCLUDING ACTUATOR):

-

-

-

... More
UPTO 25 MM

30

-

-

... More
25 MM TO 50 MM

30

-

-

... More
50 MM TO 100 MM

40

-

-

... More
ABOVE 200 MM

5

-

-

... More
REPLACEMENT OF VALVES (WELDED TYPE)

-

-

-

... More
UPTO 25 MM

50

-

-

... More
25 MM TO 50 MM

10

-

-

... More
50 MM TO 100 MM

10

-

-

... More
100 MM TO 200 MM

5

-

-

... More
AVOBE 200 MM

3

-

-

... More
SERVICING OF STOP VALVE / CONTROL VALVE OF FEED REGULATING STATION

2

-

-

... More
SERVICING OF BOILER FILL PUMP

1

-

-

... More
SECTION-D

-

-

-

... More
COMPLETE SERVICING OF SPRING LOADED SAFETY VALVES (SV)

-

-

-

... More
BOILER DRUM SV

3

-

-

... More
MAIN STEAM LINES SV

1

-

-

... More
CRH LINES SV

1

-

-

... More
HRH LINES SV

3

-

-

... More
SERVICING OF SOOT BLOWER SAFETY VALVE

1

-

-

... More
SECTION-E

-

-

-

... More
PREPARATION / FABRICATION OF HP TUBE BENDS

50

-

-

... More
REPAIR OF PENT HOUSE OF BOILER

-

-

-

... More
REPAIR OF PENT HOUSE BY PATCHING (WITHOUT STEEL)

100

-

-

... More
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)

1

-

-

... More
REPAIRING OF DEAD CHAMBER

-

-

-

... More
REPAIR OF DEAD CHAMBER BY PATCHING

100

-

-

... More
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES

1

-

-

... More
REPAIR & SERVICING

-

-

-

... More
BUCKSTAYS

100

-

-

... More
REPALCEMENT/ REPAIRING OF ECONOMISER MODULE (CONSIST OF 2 COILS BOTH LOWER & UPPER BANK)

30

-

-

... More
PAINTING OF TAKEN OUT ECONOMISER COILS

2000

-

-

... More
REPAIRING OF BURNER CASING

-

-

-

... More
WITH STEEL

100

-

-

... More
WITHOUT STEEL

1

-

-

... More
REPAIRING OF CAT HOUSE

-

-

-

... More
WITH STEEL

1

-

-

... More
WITHOUT STEEL

100

-

-

... More
SERVICING, CLEANING & REPAIRING OF SAMPLING LINE COOLERS

6

-

-

... More
SERVICING & REPAIRING OF HANGERS & SUPPORTS

100

-

-

... More
SECTION-F

-

-

-

... More
FIXING OF CORRUGATED GI SHEET AT BOILER ROOF & OTHER PLACES

50

-

-

... More
PAINTING OF BOILER BASE STRUCTURE

1000

-

-

... More
DISPOSAL OF RUBBISH THERMAL INSULATION

1

-

-

... More
REPAIRING OF HEADER STUBS HAND HOLE PLUGS

10

-

-

... More
Insulation Work

-

-

-

... More
REMOVAL / APPLICATION OF THERMAL INSULATION IN COMPLETE BOILER FROM BOTTOM ASH HOPPER TO PENT HOUSE

700

-

-

... More
REMOVAL / APPLICATION OF THERMAL INSULATION IN STEAM AND WATER PIPING

200

-

-

... More
REMOVAL /APPLICATION OF THERMAL INSULATION IN ESP

300

-

-

... More
REMOVAL / APPLICATION OF THERMAL INSULATION INAIR HEATER & HOPPER

300

-

-

... More
FLUE GAS & HOT AIR DUCT

2500

-

-

... More
SHEETING WORK OVER INSULATION (WHERE INSULATION IS IN GOOD CONDITION)

4000

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.