Madhya Pradesh Power Generating Company Limited Tender
... More
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Madhya Pradesh Power Generating Company Limited - MPPGCL Tender
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date29 Jan 2025
Closing Date21 Feb 2025
Tender Amount₹ 2,14,98,000
Costs
EMD
₹ 2,15,000Document Cost
Refer DocumentsTender Fee
₹ 1,534
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MPPGC_398013_1Tender No
WE360Tender Authority
Madhya Pradesh Power Generating Company Limited ViewPurchaser Address
-Website
http://http://www.mppgcl.mp.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
LP Turbine last two stages (3L & 3R and 2L & 2R) Blades Removal, Cleaning and NFT
1
-
-
... More
LP Turbine last two stages (3L & 3R and 2L & 2R) Blades MPI
1
-
-
... More
Installation of LP Turbine last two stages (3L & 3R and 2L & 2R) Blades
1
-
-
... More
Overhauling of Hydraulically Operated Valves
-
-
-
... More
ESV & HP Control Valves
4
-
-
... More
IV & IP Control Valves
4
-
-
... More
CRH NRV
1
-
-
... More
HPBP Steam Control Valves & HPBP Spray Control Valves
5
-
-
... More
IOverhauling of Extraction NRV/Valve
8
-
-
... More
Overhauling of MS Strainer / HRH Strainer
4
-
-
... More
Checking & Setting of Critical Piping Hanger & Support from Boiler to Turbine End
1
-
-
... More
Overhauling of MOT Coolers
2
-
-
... More
Overhauling of Feed Valves
4
-
-
... More
Generator Shaft Seal Inspection
1
-
-
... More
IWork of calibration, adjustment, and tuning of TG site C&I system with max DNA DCS system during AOH
1
-
-
... More
Generator Rotor Thread Out
1
-
-
... More
Exciter Maintenance
1
-
-
... More
Generator Hydrogen Cooler Maintenance & Exciter Cooler Maintenance
1
-
-
... More
Attending Lekage if found during Generator Rotor Gas Tightness Test
1
-
-
... More
Testing of Generator (Online Testing on Generator :- Online testing of Generator shall be carried out before shut down of unit and after COH of Unit and results shall be compare for improvement)
-
-
-
... More
Vibration Measurement
2
-
-
... More
Noise Measurement
2
-
-
... More
Thermography test
2
-
-
... More
Partial discharge Measurement
2
-
-
... More
Testing of Generator (Offline Testing)
-
-
-
... More
Stator Winding Resistance
1
-
-
... More
Resistance and Impedance of Generator Rotor & Exciter Rotor
1
-
-
... More
IR Test of Gen Stator, Rotor and Exciter Stator, Rotor
1
-
-
... More
ELCID test of Generator Stator
1
-
-
... More
NFT of Generator Stator Winding
1
-
-
... More
Boroscopic/Microscopic Test
1
-
-
... More
Tan Delta Test of Stator Winding (Upto 10 KV)
1
-
-
... More
DC Hipot of Stator (if Required)
1
-
-
... More
RSO Test of Generator Rotor
1
-
-
... More
Optional Work:
-
-
-
... More
Re-Finning of any Stage of LPT Casing (Rate is to be quoted on per stage basis (one no. means for 01 complete stage of any side)
6
-
-
... More
Generator Seal Oil System
1
-
-
... More
Vibration Analysis & Trim Balancing
1
-
-
... More
Seat Repairing / Replacement of HP Control valve
1
-
-
... More
Seat Replacement of HP Bypass Valve
3
-
-
... More
Seat Repairing / Replacement of Feed Valve
2
-
-
... More
Additional TG Baring Replacement (if more than 01 bearing needs to be replaced & if lifting of Generator End Shield is already included and to be carried out in Generator Overhauling work)
1
-
-
... More
Additional TG Baring Replacement For Bearing No. 05/06 Only ( if more than 01 bearing needs to be replaced & if lifting of Generator End Shield is not included in Generator Overhauling work)
1
-
-
... More
Replacement of Addition LPT Extraction Bellow (Except A-3 xtraction Bellow i.e. LPH-1 Extraction bellow)
1
-
-
... More
Cutting & Machinig work on Generator Shaft & Rotor Earth Fault Slip Rings
-
-
-
... More
In situ machining without balancing
1
-
-
... More
Machining and slow speed balancing
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements