Madhya Pradesh Power Generating Company Limited Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Madhya Pradesh Power Generating Company Limited - MPPGCL Tender
Machinery and Tools
Eprocure
Opening Date20 Feb 2023
Closing Date21 Mar 2023
Tender Amount₹ 2,87,45,904
Costs
EMD
₹ 2,87,500Document Cost
₹ 5,000Tender Fee
₹ 1,534
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_MPPGC_246891_1Bid Award Id
ViewTender No
246891Tender Authority
Madhya Pradesh Power Generating Company Limited ViewPurchaser Address
-Website
http://http://www.mppgcl.mp.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
CLEANING OF ASH FROM ECONOMISER HOPPER
1
-
-
CLEANING OF PENT HOUSE, WIND BOX AND CAT HOUSE, DOG HOUSE & DEAD CHAMBER,
3
-
-
CLEANING OF EMERGENCY COOLING WATER SUPPLY TANK FOR BCW MOTOR
1
-
-
BOTTOM ASH HOPPER CLEANING
1
-
-
CLEANING OF PENT HOUSE ROOF
1
-
-
HYDROJET CLEANING OF SCAPH
4
-
-
PREPARATION OF SCAFFOLDING
-
-
-
BOILER HORIZONTAL PASS (SCREEN TUBES, LTSH TERMINAL)
2
-
-
ABOVE ECONOMISER HOPPER FOR INSPECTION OF ECONOMISER LOWER BANK COILS & C-HEADER.
1
-
-
QUICK ERECT SCAFFOLDING SYSTEM (CUP-LOCK SYSTEM) IN BOILER FURNACE (FROM BOTTOM TO TOP INCLUDING RH)
1
-
-
WIND BOX IN ALL FOUR CORNER
1
-
-
CAT HOUSE FOR FRONT/REAR S-PANEL BACKSIDE CHECKING, REPAIRING
1
-
-
BOTTOM ASH HOPPER UP TO S-PANEL TUBES
1
-
-
INSPECTION
-
-
-
INSPECTION OF COMPLETE BOILER PRESSURE PARTS (1ST & 2ND PASS)
1
-
-
INSPECTION & REPAIR OF ALL DOORS ,WINDOWS AND PEEP HOLES IN BOILER
20
-
-
INSPECTION OF RING HEADER & REFIXING/REPLACEMENT OF STRAINERS & ORIFICES
1
-
-
INTERNAL INSPECTION & CLEANING OF BOILER DRUM
1
-
-
SERVICING OF SECONDARY AIR DAMPERS
88
-
-
DYE PENETRATION TEST (DP TEST) WITH KIT (1sq. Inch = 645 sq. mm)
2000
-
-
TRANSPORTATION OF ASH, SCRAPS, DEBRIES AND OTHER WASTE MATERIALS (INCLUDING LOADING/UNLOADING)
500
-
-
HYDROJET CLEANING OF COMPLETE BOILER PRESSURE PARTS COMPONENT
-
-
-
DIVISIONAL SUPERHEATER COILS
1
-
-
PLATEN SUPERHEATER COILS.
1
-
-
RE-HEATER COILS.
1
-
-
WATER WALL ( FRONT, REAR, LEFT & RIGHT)
1
-
-
SECTION-B
-
-
-
ASSISTANCE IN RADIOGRAPHY
1
-
-
ASSISTANCE IN HYDRAULIC TEST OF BOILER PRESSURE PART & PREPARATION FOR BOILER LIGHT UP
1
-
-
RECTIFICATION, REPLACEMENT AND REFIXING OF PROTECTION SLEEVE (SHIELDING) IN VARIOUS AREAS OF BOILER TUBES.
5000
-
-
RECTIFICATION, REPLACEMENT AND REFIXING OF CASSETTE BAFFLES IN VARIOUS AREAS OF BOILER TUBES.
100
-
-
REPAIR & REFIXING OF PROTECTION PLATE OVER LTSH/ECO COIL BENDS (1000X300X5)MM
50
-
-
PREPARATION OF BOILER TUBE SURFACE FOR TUBE THICKNESS SURVEY/ OXIDE SCALE MEASUREMENT/ STRESS RELIEVING
60000
-
-
WELDING OF HP JOINTS OF BOILER TUBES
-
-
-
WATER WALL TUBES, SCREEN TUBES, HANGER TUBES, REAR ARCH TUBES ETC.
1800
-
-
REPLACEMENT OF WW BURNER PANEL TUBES
50
-
-
STEAM COOLED WALL TUBES
50
-
-
DIVISIONAL SUPERHEATER TUBES
100
-
-
PLATEN SUPERHEATER TUBES
150
-
-
SUPERHEATER STEAM COOLED SPACER TUBES
20
-
-
PENDANT REHEATER FRONT & REAR
600
-
-
REHEATER CROSS OVER TUBES
50
-
-
REHEATER STEAM COOLED SPACER TUBES
20
-
-
LTSH TUBES
500
-
-
LTSH SUPPORT TUBES
150
-
-
ECONOMISER TUBES
1500
-
-
ECONOMISER SUPPORT TUBES
400
-
-
ROOF TUBES
50
-
-
HEADER STUBS
20
-
-
HYDRASTEP TUBES
10
-
-
INSTRUMENT PIPINGS
50
-
-
WELDING & REPLACEMENT OF DRAIN & VENT JOINTS
150
-
-
WELDING & REPLACEMENT OF TRACING LINE / SAMPLING LINE
150
-
-
REPLACEMENT/ REPAIRING OF ECONOMISER COIL MODULE (CONSIST OF 02 COILS ALL LOWER, MIDDLE & UPPER BANK)
-
-
-
ECONOMIZER UPPER BANK COIL MODULE
35
-
-
ECONOMIZER MIDDLE BANK COIL MODULE
16
-
-
ECONOMIZER LOWER BANK COIL MODULE
16
-
-
WELDING OF FINS
2000
-
-
RE-ENFORCEMENT OF WELDED JOINTS
1000
-
-
ALIGNMENT OF COILS/ TUBES
-
-
-
ALIGNMENT OF COILS OF DIVISIONAL SH PANEL
5
-
-
ALIGNMENT OF COILS OF PLATEN SUPERHEATERS
5
-
-
ALIGNMENT OF REHEATER COIL (FRONT/ REAR)
10
-
-
ALIGNMENT OF COIL OF LTSH (UPPER / LOWER)
10
-
-
ALIGNMENT OF COIL OF ECONOMISER (UPPER / MIDDLE / LOWER)
50
-
-
ALIGNMENT & SERVICING OF WALL BLOWERS
88
-
-
ALIGNMENT & SERVICING OF LONG RETRACTABLE SOOT BLOWER
2
-
-
CHECKING AND RECTIFICATION OF EXPANSION INDICATOR IN BOILER AREA
12
-
-
SECTION-C
-
-
-
GLAND PACKING OF HP VALVES
-
-
-
UPTO 25 MM
50
-
-
25 MM TO 50 MM
75
-
-
50MM TO 100 MM
50
-
-
ABOVE 100 MM
20
-
-
COMPLETE SERVICING OF VALVES (EXCLUDING ACTUATOR):
-
-
-
UPTO 25 MM
50
-
-
25 MM TO 50 MM
50
-
-
50 MM TO 100 MM
30
-
-
ABOVE 100 MM
20
-
-
REPLACEMENT OF VALVES (WELDED TYPE)
-
-
-
UPTO 25 MM
30
-
-
25 MM TO 50 MM
20
-
-
50 MM TO 100 MM
5
-
-
ABOVE 100 MM
5
-
-
ASSISTANT IN REMOVAL/INSTALLATION OF ACTUATORS OF HP VALVES
50
-
-
SERVICING OF MAIN STEAM STOP VALVE
2
-
-
COMPLETE SERVICING OF SPRING LOADED SAFETY VALVES (SV)
-
-
-
BOILER DRUM SV
6
-
-
MAIN STEAM LINES SV
2
-
-
CRH LINES SV
4
-
-
HRH LINES SV
4
-
-
ELECTROMATIC RELIEF VALVE AND PILOT VALVE
1
-
-
CLEANING / REPAIRING OF SAFETY VALVE DRAIN TRAY & LINE
16
-
-
REPLACEMENT OF BOILER DRUM SAFETY VALVE
1
-
-
SECTION-D
-
-
-
PREPARATION / FABRICATION OF HP TUBE BENDS
100
-
-
REPAIR AND RE-FIXING OF SEAL PLATES OF S-PANEL AT BOTTOM ASH HOPPER
20
-
-
REPAIR AND RE-FIXING OF REFRACTORY COOLING PIPE AT TROUGH SEAL.
50
-
-
REPAIR OF PENT HOUSE OF BOILER
-
-
-
REPAIR OF PENT HOUSE BY PATCHING (WITHOUT STEEL)
500
-
-
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)
5
-
-
REPAIR OF WIND BOX
-
-
-
REPAIR OF PENT HOUSE BY PATCHING (WITHOUT STEEL)
500
-
-
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)
2
-
-
REPAIRING OF DEAD CHAMBER
-
-
-
REPAIR OF DEAD CHAMBER BY PATCHING
200
-
-
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)
1
-
-
REPAIRING OF CAT HOUSE
-
-
-
REPAIR OF DEAD CHAMBER BY PATCHING
100
-
-
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)
1
-
-
REPAIR & SERVICING
-
-
-
BUCKSTAYS
50
-
-
DIAMOND TYPE LOCKS
50
-
-
ROCKERS
50
-
-
DISMNETLING, INSTALLATION, FEBRICATION OF STRUTURE & MISC. WORKS I.E. CANOPY, BROKEN STAIR/RAILING/DRAIN COVERING ETC.
5
-
-
INSTALLATION OF MITP
14
-
-
SERVICING, CLEANING & REPAIRING OF SAMPLING LINE COOLERS
6
-
-
CLEANING, SERVICING & REPAIRING OF HANGERS & SUPPORTS
100
-
-
REPAIRING OF SKY CLIMBER ROPE INSERT GUIDE PIPE AT PENT HOUSE ROOF.
5
-
-
SECTION-E
-
-
-
FIXING OF CORRUGATED GI SHEET AT BOILER ROOF & OTHER PLACES
50
-
-
PAINTING OF BOILER BASE STRUCTURE/STAIR RAILING/COOLING PIPING ETC.
1000
-
-
APPLICATION OF REFRACTORY
-
-
-
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GRADE A)
30
-
-
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GRADE C/P)
100
-
-
APPLICATION OF PLASTIC REFRACTORY AT VARIOUS LOCATIONS OF BOILER
5
-
-
REMOVAL / BREAKING OF DAMAGED REFRACTORY & TRANSPORTATION
10
-
-
THERMAL INSULATION WORK
-
-
-
REMOVAL & APPLICATION OF THERMAL INSULATION (THICKNESS 100 MM)
8000
-
-
REMOVAL & APPLICATION OF THERMAL INSULATION (THICKNESS 50 MM)
4000
-
-
DISPOSAL OF RUBBISH THERMAL INSULATION
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements