Madhya Pradesh Power Generating Company Limited Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Madhya Pradesh Power Generating Company Limited - MPPGCL Tender
Energy, Oil and Gas
Eprocure
Opening Date28 Dec 2024
Closing Date24 Jan 2025
Tender Amount₹ 2,48,24,803
Costs
EMD
₹ 2,48,500Document Cost
₹ 5,000Tender Fee
₹ 1,534
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MPPGC_380640_1Tender No
WT-2552Tender Authority
Madhya Pradesh Power Generating Company Limited ViewPurchaser Address
-Website
http://http://www.mppgcl.mp.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
INTERNAL CLEANING OF BOILER II ND PASS
1
-
-
... More
CLEANING OF ASH FROM ECONOMIZER HOPPER, DEAD CHAMBER, CAT HOUSE DOG HOUSE
1
-
-
... More
PREPARATION OF SCAFFOLDING IN BOILER HORIZONTAL PASS (SCREEN TUBES, RE-HEATER HANGER, SUPER HEATER HANGER TUBES)
1
-
-
... More
PREPARATION OF SCAFFOLDING ABOVE ECONOMIZER HOPPER FOR INSPECTION OF ECONOMISER LOWER BANK COILS.
1
-
-
... More
PREPARATION OF SCAFFOLDING AT WW RING HEADER FOR INSPECTION OF RING HEADER & REFIXING/REPLACEMENT OF ORIFICES.
1
-
-
... More
INSPECTION OF COMPLETE BOILER PRESSURE PARTS (I ST & II ND PASS)
1
-
-
... More
INSPECTION/REPAIR OF ALL PEEP HOLES IN BOILER
36
-
-
... More
CLEANING AND REPAIR OF All WIND BOXES
1
-
-
... More
SERVICING OF SECONDARY/ADDITIONAL AIR PORT DAMPERS
136
-
-
... More
PREPARATION OF SCAFFOLDING IN BOTTOM ASH HOPPER AND FRONT/REAR S- PANEL BACKSIDE, COVERING THE S- PANEL COMPLETELY WITH SHEETS FOR SIMULTANEOUS CHECKING, REPAIRING WORK IN BOTTOM ASH AREA AND FURNACE TOGATHER:
1
-
-
... More
DYE PENETRATIONN TEST (DPT)
400
-
-
... More
TRANSPORTATION OF ASH, SCRAPS,DEBRIS AND OTHER WASTE MATERIAL(INCL. LOADING./UNLOADING)
500
-
-
... More
THOROUGH CLEANING OF BOILER FROM INSIDE BY USING HYDRO-JET CLEANING METHOD.
1
-
-
... More
COMPLETE EXTERNAL CLEANING OF THE BOILER FROM TOP TO BOTTOM
1
-
-
... More
SECTION-B
-
-
-
... More
RECTIFICATION, REPLACEMENT AND REFIXING OF PROTECTION SLEEVE (SHIELDING) IN VARIOUS AREAS OF BOILER TUBES.
2500
-
-
... More
PREPARATION OF BOILER TUBE SURFACE FOR TUBE THICKNESS SURVEY
80000
-
-
... More
SECTION-C WELDING OF HP JOINTS AND ALIGHMENTOF BOILER TUBES/COILS/BANKS
-
-
-
... More
WATER WALL TUBES( PRIMARY AND SECONDARY PASS)/RIFLE TUBES,SCREEN TUBES, HANGER TUBES ETC.
100
-
-
... More
PRIMARY SUPER HEATER TUBES
50
-
-
... More
SECONDARY SUPER HEATER TUBES
25
-
-
... More
TERTIARY SUPER HEATER TUBES
50
-
-
... More
PRIMARY SUPERHEATER SUPPORT/HANGER TUBES
25
-
-
... More
PRIMARY REHEATER SUPPORT/HANGER TUBES
25
-
-
... More
PRIMARY AND SECONDARY REHEATER TUBES
50
-
-
... More
ROOF TUBES
25
-
-
... More
ECONOMIZER SUPPORT TUBES
200
-
-
... More
ECONOMIZER COILS IN REHEATER AND SUPERHEATER PASS
250
-
-
... More
ALIGNMENT OF COILS OF TERTIARY/FINAL SUPERHEATERS
50
-
-
... More
ALIGNMENT OF COILS OF SECONDARY SUPERHEATERS
64
-
-
... More
ALIGNMENT OF COILS OF SECONDRY/FINAL REHEATERS
100
-
-
... More
ALIGNMENT OF COIL OF ECONOMIZER
300
-
-
... More
ALIGNMENT OF COIL OF PRIMARY SUPERHEATER
102
-
-
... More
ALIGNMENT OF PRIMARY REHEATER COIL
102
-
-
... More
WELDING OF FINS
1000
-
-
... More
RE-ENFORCEMENT OF WELDED JOINTS
250
-
-
... More
CHECKING AND RECTIFICATION OF SUPPORTS/HANGERS OF CRITICAL PIPE LINES
300
-
-
... More
CHECKING AND RECTIFICATION OF EXPANSION INDICATOR IN BOILER AREA
12
-
-
... More
(SECTION-D) APPLICATION/REPAIR OF REFRACTORY(WHYTHEAT C/WHYTHEAT C PATCH) / BSF BLANKET AT VARIOUS LOCATIONS OF BOILER
-
-
-
... More
BOTTOM ASH HOPPER GR-C
50
-
-
... More
PENT HOUSE, DOORS & WINDOWS ETC. (ADDITIONAL AIR PORT/WATERWALL TUBES) GR.-C/HTC
6
-
-
... More
MAN HOLES, PEEP HOLES, ROOF SEAL BOXES GR-C
2
-
-
... More
HYDRAULIC TEST OF BOILER PRESSURE PART & PREPARATION FOR BOILER LIGHT UP
1
-
-
... More
(SECTION-E)
-
-
-
... More
COMPLETE SERVICING/OVERHAULING OF HP VALVES (MIV/MOV)
-
-
-
... More
25 mm & upto 50 mm
300
-
-
... More
50mm & upto 100 mm
82
-
-
... More
100 mm & upto200 mm
47
-
-
... More
Above 200 mm
30
-
-
... More
COMPLETE SERVICING OF CONTROL VALVES (EXCLUDING ACTUATOR):
-
-
-
... More
25 mm & upto 50 mm
11
-
-
... More
50mm & upto 100 mm
21
-
-
... More
100 mm & upto200 mm
17
-
-
... More
Above 200 mm
5
-
-
... More
COMPLETE SERVICING/OVERHAULING OF HP VALVES (MIV/MOV)
-
-
-
... More
Upto 25 mm
25
-
-
... More
25 mm & upto 50 mm
10
-
-
... More
50mm & upto 100 mm
5
-
-
... More
(SECTION-F) COMPLETE SERVICING OF SPRING LOADED SAFETY VALVES
-
-
-
... More
WATER SEPARATOR SV
4
-
-
... More
MAIN STEAM LINES SV
2
-
-
... More
CRH LINES SV
4
-
-
... More
HRH LINES SV
2
-
-
... More
ELECTROMATIC RELIEF VALVE AND PILOT VALVE
4
-
-
... More
(SECTION-G)
-
-
-
... More
PREPARATION OF HP TUBE BENDS
100
-
-
... More
REPAIR OF PENT HOUSE/SKIN CASING OF BOILER
2
-
-
... More
REPAIRING OF DEAD CHAMBER
1
-
-
... More
(SECTION H) APPLICATION OF THERMAL INSULATION
-
-
-
... More
COMPLETE BOILER FROM BOTTOM ASH HOPPER TO PENT HOUSE
1400
-
-
... More
STEAM AND WATER PIPING
300
-
-
... More
ESP
800
-
-
... More
AIR HEATER & HOPPER
1000
-
-
... More
FUEL OIL AND ITS STEAM PIPING INCLUDING HEATERS FILTERS ETC.
300
-
-
... More
(SECTION I)
-
-
-
... More
SERVICING OF MAIN STEAM STOP VALVE
2
-
-
... More
(SECTION J)
-
-
-
... More
COMPLETE OVERHAULING & RESETTING OF WATER WALL SOOT BLOWER: -
68
-
-
... More
COMPLETE OVERHAULING & RESETTING OF LONG RETRACTABLE SOOT BLOWER: -
46
-
-
... More
(SECTION K)
-
-
-
... More
work of installation and implementation of CCTV survillance system during AOH.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%