Madhya Pradesh Power Generating Company Limited Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Madhya Pradesh Power Generating Company Limited - MPPGCL Tender
Energy, Oil and Gas
Eprocure
Opening Date18 Dec 2024
Closing Date28 Jan 2025
Tender Amount₹ 3,22,25,000
Costs
EMD
₹ 3,22,250Document Cost
₹ 5,000Tender Fee
₹ 1,534
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MPPGC_382192_1Tender No
WT-2505Tender Authority
Madhya Pradesh Power Generating Company Limited ViewPurchaser Address
-Website
http://http://www.mppgcl.mp.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
CLEANING OF PENT HOUSE, WIND BOX AND CAT HOUSE, DOG HOUSE & DEAD CHAMBER,
1
-
-
... More
CLEANING OF EMERGENCY COOLING WATER SUPPLY TANK FOR BCW MOTOR
1
-
-
... More
SECTION-A2 PREPARATION OF SCAFFOLDING
-
-
-
... More
BOILER HORIZONTAL PASS (SCREEN TUBES, LTSH TERMINAL)
2
-
-
... More
ABOVE ECONOMISER HOPPER FOR INSPECTION OF ECONOMISER LOWER BANK COILS & C-HEADER.
1
-
-
... More
QUICK ERECT SCAFFOLDING SYSTEM (CUP-LOCK SYSTEM) IN BOILER FURNACE (FROM BOTTOM TO TOP INCLUDING RH)
1
-
-
... More
WIND BOX IN ALL FOUR CORNER
1
-
-
... More
CAT HOUSE FOR FRONT/REAR S-PANEL BACKSIDE CHECKING, REPAIRING
1
-
-
... More
BOTTOM ASH HOPPER UP TO S-PANEL TUBES
1
-
-
... More
SECTION-A3 INSPECTION
-
-
-
... More
INSPECTION OF COMPLETE BOILER PRESSURE PARTS (1ST & 2ND PASS)
1
-
-
... More
INSPECTION & REPAIR OF ALL DOORS ,WINDOWS AND PEEP HOLES IN BOILER
25
-
-
... More
INSPECTION OF RING HEADER & REFIXING/REPLACEMENT OF STRAINERS & ORIFICES
1
-
-
... More
INTERNAL INSPECTION & CLEANING OF BOILER DRUM
1
-
-
... More
SERVICING OF SECONDARY AIR DAMPERS
80
-
-
... More
DYE PENETRATION TEST (DP TEST) WITH KIT (1sq. Inch = 645 sq. mm)
2000
-
-
... More
TRANSPORTATION OF ASH, SCRAPS, DEBRIES AND OTHER WASTE MATERIALS (INCLUDING LOADING/UNLOADING)
1000
-
-
... More
HEADER INSPECTION & INSPECTION OF SPRAY NOZZLE, ATTEMPERATOR
1
-
-
... More
SECTION-A4 -HYDROJET CLEANING OF COMPLETE BOILER PRESSURE PARTS COMPONENT
-
-
-
... More
DIVISIONAL SUPERHEATER COILS
1
-
-
... More
PLATEN SUPERHEATER COILS.
1
-
-
... More
RE-HEATER COILS.
1
-
-
... More
WATER WALL ( FRONT, REAR, LEFT & RIGHT)
1
-
-
... More
SECTION-B
-
-
-
... More
ASSISTANCE IN RADIOGRAPHY, OXIDE SCALE MEASUREMENT, MAGNETIC PARTICLE INSPECTION (MPI), STRESS RELIEVING, BOROSCOPIC ETC.
1
-
-
... More
ASSISTANCE IN HYDRAULIC TEST OF BOILER PRESSURE PART & PREPARATION FOR BOILER LIGHT UP
1
-
-
... More
RECTIFICATION, REPLACEMENT AND REFIXING OF PROTECTION SLEEVE (SHIELDING) IN VARIOUS AREAS OF BOILER TUBES.
4000
-
-
... More
RECTIFICATION, REPLACEMENT AND REFIXING OF CASSETTE BAFFLES IN VARIOUS AREAS OF BOILER TUBES.
100
-
-
... More
REPAIR & REFIXING OF PROTECTION PLATE OVER LTSH/ECO COIL BENDS (1000X300X5)MM
50
-
-
... More
PREPARATION OF BOILER TUBE SURFACE FOR TUBE THICKNESS SURVEY/ OXIDE SCALE MEASUREMENT/ STRESS RELIEVING
100000
-
-
... More
WELDING OF HP JOINTS OF BOILER TUBES
-
-
-
... More
WATER WALL TUBES, SCREEN TUBES, HANGER TUBES, REAR ARCH TUBES ETC.
1000
-
-
... More
REPLACEMENT OF WW BURNER PANEL TUBES
150
-
-
... More
STEAM COOLED WALL TUBES
150
-
-
... More
DIVISIONAL SUPERHEATER TUBES
150
-
-
... More
PLATEN SUPERHEATER TUBES
150
-
-
... More
SUPERHEATER STEAM COOLED SPACER TUBES
20
-
-
... More
PENDANT REHEATER FRONT & REAR
200
-
-
... More
REHEATER CROSS OVER TUBES
50
-
-
... More
REHEATER STEAM COOLED SPACER TUBES
20
-
-
... More
LTSH TUBES
500
-
-
... More
LTSH SUPPORT TUBES
150
-
-
... More
ECONOMISER TUBES
1200
-
-
... More
ECONOMISER SUPPORT TUBES
400
-
-
... More
ROOF TUBES
50
-
-
... More
HEADER STUBS
10
-
-
... More
HYDRASTEP TUBES
10
-
-
... More
INSTRUMENT PIPINGS
50
-
-
... More
WELDING & REPLACEMENT OF DRAIN & VENT JOINTS
150
-
-
... More
WELDING & REPLACEMENT OF TRACING LINE / SAMPLING LINE
150
-
-
... More
WELDING OF FINS
3000
-
-
... More
RE-ENFORCEMENT OF WELDED JOINTS
1000
-
-
... More
ALIGNMENT OF COILS/ TUBES
-
-
-
... More
ALIGNMENT OF COILS OF DIVISIONAL SH PANEL
15
-
-
... More
ALIGNMENT OF COILS OF PLATEN SUPERHEATERS
15
-
-
... More
ALIGNMENT OF REHEATER COIL (FRONT/ REAR)
50
-
-
... More
ALIGNMENT OF COIL OF LTSH (UPPER / LOWER)
50
-
-
... More
ALIGNMENT OF COIL OF ECONOMISER (UPPER / MIDDLE / LOWER)
50
-
-
... More
ALIGNMENT & SERVICING OF WALL BLOWERS
88
-
-
... More
ALIGNMENT & SERVICING OF LONG RETRACTABLE SOOT BLOWER
42
-
-
... More
CHECKING AND RECTIFICATION OF EXPANSION INDICATOR IN BOILER AREA
12
-
-
... More
SHIFTING OF ECONOMISER COIL ( COMPLETE MODULE) SFROM ITS POSITION TO ABOVE AND AFTER CHECKING & REPAIRING REPOSITIONING OF THE SAME
35
-
-
... More
SHIFTING OF LOW TEMPRETURE SUPERHEATER (LTSH) COIL ( COMPLETE MODULE) SFROM ITS POSITION TO ABOVE AND AFTER CHECKING & REPAIRING REPOSITIONING OF THE SAME
20
-
-
... More
SECTION-C1 GLAND PACKING OF HP VALVES
-
-
-
... More
UPTO 25 MM
70
-
-
... More
25 MM TO 50 MM
65
-
-
... More
50MM TO 100 MM
40
-
-
... More
ABOVE 100 MM
20
-
-
... More
SECTION-C2 COMPLETE SERVICING OF VALVES (EXCLUDING ACTUATOR):
-
-
-
... More
UPTO 25 MM
70
-
-
... More
25 MM TO 50 MM
50
-
-
... More
50 MM TO 100 MM
30
-
-
... More
ABOVE 100 MM
20
-
-
... More
SECTION-C3 REPLACEMENT OF VALVES (WELDED TYPE)
-
-
-
... More
UPTO 25 MM
30
-
-
... More
25 MM TO 50 MM
20
-
-
... More
50 MM TO 100 MM
5
-
-
... More
ABOVE 100 MM
5
-
-
... More
SECTION-C4 ASSISTANT IN REMOVAL/INSTALLATION OF ACTUATORS OF HP VALVES
50
-
-
... More
SECTION-C5 SERVICING OF MAIN STEAM STOP VALVE
2
-
-
... More
SECTION-C6 COMPLETE SERVICING OF SPRING LOADED SAFETY VALVES (SV)
-
-
-
... More
BOILER DRUM SV
6
-
-
... More
MAIN STEAM LINES SV
3
-
-
... More
CRH LINES SV
4
-
-
... More
HRH LINES SV
4
-
-
... More
SECTION-C7 ELECTROMATIC RELIEF VALVE AND PILOT VALVE
8
-
-
... More
SECTION-C8 CLEANING / REPAIRING OF SAFETY VALVE DRAIN TRAY & LINE
15
-
-
... More
SECTION-C9 SERVICING OF ECONOMISER NON-RETURN VALVE (NRV) SIZE-550 MM
1
-
-
... More
SECTION-D1 PREPARATION / FABRICATION OF HP TUBE BENDS
100
-
-
... More
SECTION-D2 REPAIR AND RE-FIXING OF SEAL PLATES OF S-PANEL AT BOTTOM ASH TROUGH SEAL
20
-
-
... More
SECTION-D3 REPAIR AND RE-FIXING OF REFRACTORY COOLING PIPE OF BOTTOM ASH HOPPER AT TROUGH SEAL.
50
-
-
... More
SECTION-D4 REPAIR OF PENT HOUSE OF BOILER
-
-
-
... More
REPAIR OF PENT HOUSE BY PATCHING (WITHOUT STEEL)
500
-
-
... More
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)
5
-
-
... More
SECTION-D5 REPAIR OF WIND BOX
-
-
-
... More
REPAIR OF WIND BOX BY PATCHING (WITHOUT STEEL)
1000
-
-
... More
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)
4
-
-
... More
SECTION-D6 REPAIRING OF DEAD CHAMBER
-
-
-
... More
REPAIR OF DEAD CHAMBER BY PATCHING
200
-
-
... More
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)
2
-
-
... More
SECTION-D7 REPAIRING OF CAT HOUSE
-
-
-
... More
REPAIR OF CAT HOUSE BY PATCHING
100
-
-
... More
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)
1
-
-
... More
SECTION-D8 REPAIR & SERVICING
-
-
-
... More
BUCKSTAYS
25
-
-
... More
DIAMOND TYPE LOCKS
25
-
-
... More
ROCKERS
25
-
-
... More
SECTION-D9 DISMNETLING, INSTALLATION, FEBRICATION OF STRUTURE & MISC. WORKS I.E. CANOPY, BROKEN STAIR/RAILING/DRAIN COVERING ETC.
5
-
-
... More
SECTION-D10 INSTALLATION OF MITP
14
-
-
... More
SECTION-D11 SERVICING, CLEANING & REPAIRING OF SAMPLING LINE COOLERS
6
-
-
... More
SECTION-D12 CLEANING, SERVICING & REPAIRING OF HANGERS & SUPPORTS
100
-
-
... More
SECTION-E1 FIXING OF CORRUGATED GI SHEET AT BOILER ROOF & OTHER PLACES
5000
-
-
... More
SECTION-E2 PAINTING OF BOILER BASE STRUCTURE/STAIR RAILING/COOLING PIPING ETC.
2000
-
-
... More
SECTION-E3 APPLICATION OF REFRACTORY
-
-
-
... More
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GRADE A)
25
-
-
... More
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GRADE C/P)
35
-
-
... More
APPLICATION OF PLASTIC REFRACTORY AT VARIOUS LOCATIONS OF BOILER
5
-
-
... More
SECTION-E4 REMOVAL / BREAKING OF DAMAGED REFRACTORY & TRANSPORTATION
10
-
-
... More
SECTION-E5 THERMAL INSULATION WORK
-
-
-
... More
REMOVAL & APPLICATION OF THERMAL INSULATION (THICKNESS 100 MM)
8000
-
-
... More
REMOVAL & APPLICATION OF THERMAL INSULATION (THICKNESS 50 MM)
4000
-
-
... More
SECTION-E6 DISPOSAL OF RUBBISH THERMAL INSULATION
1
-
-
... More
SECTION-E7 SUPPLY OF NEW PLAIN AL SHEET OF 22 G
1000
-
-
... More
SECTION-F1 Work of installation and implementation of CCTV surveillance system during AOH
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements