Madhya Pradesh Power Generating Company Limited Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Madhya Pradesh Power Generating Company Limited - MPPGCL Tender
Machinery and Tools
Eprocure
Opening Date7 Mar 2024
Closing Date27 May 2024
Tender Amount₹ 6,84,81,600
Costs
EMD
₹ 6,84,900Document Cost
₹ 5,000Tender Fee
₹ 1,534
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_MPPGC_318332_2Bid Award Id
ViewTender No
318332Tender Authority
Madhya Pradesh Power Generating Company Limited ViewPurchaser Address
-Website
http://http://www.mppgcl.mp.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
eNIT Document. Please note that the NIT bearing tender ID 2023_MPPGC_ 318332_2 shall be applicable for instant tendering process
Tender Schedule, Specifications and Scope of Work along with other terms and conditions
Correction in Standard Bid Document (SBD)
Addendum in Standard Bid Document (SBD)
Check List Annexure XV (To be uploaded in pdf format after filling response followed by seal and sign)
BOQ Items
CLEANING OF ASH FROM ECONOMISER HOPPER WITH CONNECTING DUCTS
2
-
-
CLEANING OF PENT HOUSE, CAT HOUSE, DEAD CHAMBER
2
-
-
BOTTOM ASH HOPPER CLEANING
2
-
-
PREPARATION OF SCAFFOLDING
-
-
-
PREPARATION OF SCAFFOLDING ABOVE ECONOMISER HOPPER FOR INSPECTION OF ECONOMISER COILS
2
-
-
PREPARATION OF QUICK ERECT SCAFFOLDING SYSTEM (CUP-LOCK SYSTEM) IN BOILER FURNACE (FROM TOP TO BOTTOM) along with providing cup-lock system by firm
2
-
-
PREPARATION OF SCAFFOLDING IN BOTTOM ASH HOPPER
2
-
-
INSPECTION
-
-
-
INSPECTION OF COMPLTE BOILER PRESSURE PARTS (IST & IIND PASS)
2
-
-
INSPECTION & REPAIR OF ALL DOORS ,WINDOWS AND PEEP HOLES IN BOILER
50
-
-
HEADER INSPECTION & INSPACTION OF SPRAY NOZZLE ATTEMPERATOR
20
-
-
INTERNAL INSPECTION & CLEANING OF BOILER DRUM
2
-
-
CLEANING AND REPAIR OF WIND BOX
-
-
-
WITH STEEL
10
-
-
WITHOUT STEEL
1600
-
-
DYE PENETRATION TEST (DP TEST) WITH KIT
2000
-
-
HYDRO JET CLEANING OF COMPLETE BOILER PRESSURE PARTS
-
-
-
PLATEN SUPERHEATER COILS.
2
-
-
PENDENT RE-HEATER COILS.
2
-
-
FINAL SUPERHEATER
2
-
-
WATER WALL ( FRONT, REAR, LEFT & RIGHT, ROOF)
2
-
-
Section B
-
-
-
ASSISTANCE IN RADIOGRAPHY
2
-
-
RECTIFICATION, REPLACEMENT AND REFIXING OF CASSETTE BAFFLES IN VARIOUS AREAS OF BOILER TUBES.
300
-
-
Erosion Shield
-
-
-
FABRICATION & FIXING OF EROSION SHIELD
400
-
-
FIXING OF EROSION SHIELD
3000
-
-
REMOVAL OF EROSION SHIELD
3000
-
-
PREPARATION OF BOILER TUBE SURFACE FOR TUBE THICKNESS SURVEY/OXIDE SCALE MEASUREMENT/STRESS RELIEVING
100000
-
-
WELDING OF HP JOINTS OF BOILER TUBES
-
-
-
WATER WALL TUBES-SCREEN TUBES, HANGER TUBES, REAR ARCH TUBES ETC.
1000
-
-
PRIMARY SUPERHEATER TUBES
300
-
-
PLATEN SUPERHEATER TUBES
400
-
-
FINAL SUPERHEATER TUBES
400
-
-
HORIZONTAL REHEATER
4000
-
-
PENDANT REHEATER
600
-
-
ECONOMIZER TUBES
1000
-
-
SLING
10
-
-
RISER
10
-
-
BLEED
204
-
-
HYDRASTEP
40
-
-
INSTRUMENT PIPINGS
100
-
-
WELDING OF FINS
400
-
-
ECONOMISER/WATER WALL/CAGE WALL
2000
-
-
SLING
200
-
-
REHEATER
200
-
-
DRUM VENT
100
-
-
WELDING & REPLACEMENT OF DRAIN & VENTS JOINTS
400
-
-
WELDING & REPLACEMENT OF TRACING LINE / SAMPLING LINE
40
-
-
REPLACEMENT OF COILS- HORIZONTAL RE-HEATER(Bottom/Middle/Top)/ECONOMISER(TOP/MIDDLE/BOTTOM)
482
-
-
PAD WELDING OF ERODED TUBES OF VARIOUS SIZE
-
-
-
PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS (SIZE 50MM X 50MM)
2000
-
-
PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS (SIZE 50MM X 100MM)
400
-
-
PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS (SIZE 50MM X 300MM)
400
-
-
ALIGNMENT OF COILS/ TUBES / BLOWERS
-
-
-
ALIGNMENT OF COILS OF SH DIVISIONAL PANEL/FINAL
40
-
-
ALIGNMENT OF COILS OF PLATEN SUPERHEATERS
30
-
-
ALIGNMENT OF COIL OF ECONOMISER
240
-
-
ALIGNMENT OF COIL OF LTSH (UPPER / LOWER) / PRIMARY SH
230
-
-
ALIGNMENT OF REHEATER COIL (HORIZONTAL / PENDENT)
355
-
-
ASSISTANCE IN HYDRAULIC TEST OF BOILER PRESSURE PART & PREPARATION FOR BOILER LIGHT UP
2
-
-
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GRADE A + PLASTIC)
-
-
-
BURNER MOUTH
10
-
-
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GRADE C + PLASTIC)
-
-
-
PENT HOUSE, DOOR, WINDOW MANHOLE & PEEPHOLE, ETC
10
-
-
DEAD CHAMBER & SCREEN VALVE
10
-
-
COOLING PIPE OF SEAL PLATE (BOTTOM ASH HOPPER)
14
-
-
OTHER AREAS (LIKE HOPPER HEADER ETC.)
6
-
-
REMOVAL / BREAKING OF DAMAGED REFRACTORY & TRANSPORTATION
20
-
-
Section C
-
-
-
GLAND PACKING OF HP VALVES
-
-
-
UPTO 25 MM
100
-
-
25 MM TO 50 MM
120
-
-
50MM TO 100 MM
40
-
-
100 MM TO 200 MM
16
-
-
COMPLETE SERVICING OF VALVES (EXCLUDING ACTUATOR):
-
-
-
UPTO 25 MM
100
-
-
25 MM TO 50 MM
150
-
-
50 MM TO 100 MM
20
-
-
100 MM TO 200 MM
10
-
-
REPLACEMENT OF VALVES (WELDED TYPE)
-
-
-
UPTO 25 MM
20
-
-
25 MM TO 50 MM
20
-
-
50 MM TO 100 MM
4
-
-
100 MM And Above
4
-
-
SERVICING OF MAIN STEAM STOP VALVE
4
-
-
SERVICING OF VALVE/CONTROL VALVE OF FEED REGULATING STATION IN-SITU
16
-
-
Section D
-
-
-
COMPLETE SERVICING OF SPRING LOADED SAFETY VALVES (SV)
-
-
-
BOILER DRUM SV
6
-
-
MAIN STEAM LINES SV
4
-
-
CRH LINES SV
8
-
-
HRH LINES SV
4
-
-
BAS LINE SV
4
-
-
SECTION-E
-
-
-
PREPARATION / FABRICATION OF HP TUBE BENDS
200
-
-
REPAIR OF PENT HOUSE OF BOILER
-
-
-
REPAIR OF PENT HOUSE BY PATCHING (WITHOUT STEEL)
1600
-
-
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)
10
-
-
REPAIRING SEALING DEAD CHAMBER
2
-
-
BUCKSTAYS
100
-
-
DIAMOND TYPE LOCKS
100
-
-
ROCKERS
100
-
-
REPAIRING OF ECONOMISER HOPPERS & CONNECTION JOINT DUCTING & MAKING / STREGNTHEN OF THEIR PLATEFORM
2
-
-
REPAIRING OF ECONOMIZER CASING
2
-
-
REPAIRING OF BOTTOM ASH HOPPER LINER & SEAL TROUGH INCLUDING FIXING OF DIPPER PLATE
2
-
-
REPAIRING OF FURNACE ZONE & REST OF THE AREAS
-
-
-
WITH STEEL
4
-
-
WITHOUT STEEL
600
-
-
REPAIRING OF SECOND PASS CASING
-
-
-
WITH STEEL
16
-
-
WITHOUT STEEL
1200
-
-
DISMNETLING, INSTALLATION, FEBRICATION OF STRUTURE & MISC. WORKS I.E. CANOPY, BROKEN STAIR/RAILING/DRAIN COVERING ETC.
10
-
-
REPLACEMENT / STRENGTHENING OF BAFFLE PLATE BETWEEN PRIMARY SUPER HEATER & HORIZONTAL RE-HEATER
-
-
-
WITHOUT STEEL
400
-
-
REPAIRING/SEALING OF CAT HOUSE
2
-
-
INSTALLATION OF MITP
20
-
-
SERVICING, CLEANING & REPAIRING OF SAMPLING LINE COOLERS
4
-
-
SERVICING & REPAIRING OF HANGERS & SUPPORTS
100
-
-
REPAIRING OF Tapper DUCT & NEAR BY AREAS
-
-
-
WITH STEEL
6
-
-
WITHOUT STEEL
1400
-
-
SECTION F
-
-
-
REPAIRING OF RE-HEATER & SUPER HEATER AERO DYNAMIC DAMPER INCLUDING TOP / BOTTOM & NEAR BY AREAS
2
-
-
DISPOSAL OF RUBBISH THERMAL INSULATION
2
-
-
Insulation Work
-
-
-
REMOVAL & APPLICATION OF THERMAL INSULATION IN COMPLETE BOILER FROM BOTTOM ASH HOPPER TO PENT HOUSE
4000
-
-
REMOVAL & APPLICATION OF THERMAL INSULATION IN STEAM AND WATER PIPING
2000
-
-
REMOVAL & APPLICATION OF THERMAL INSULATION IN ESP
2000
-
-
REMOVAL & APPLICATION OF THERMAL INSULATION INAIR HEATER & HOPPER
2000
-
-
COAL MILL, FUEL OIL AND ITS STEAM PIPING INCLUDING HEATERS FILTERS ETC.
1000
-
-
FLUE GAS & HOT AIR DUCT
1000
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements