Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited Tender

... More
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.

Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited - MPPKVVCL Tender

Works
Civil And Construction
Electrical and Electronics
Electrical Works
Eprocure
Opening Date6 Jul 2023
Closing Date19 Jul 2023
Tender Amount₹ 16,11,915 
Notes
Download

Costs

  • EMD

    ₹ 10,000
  • Document Cost

    ₹ 1,120
  • Tender Fee

    ₹ 295

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
33 KV Strain hardware (T&C type) fittings suitable for Panther

200

18600

93

... More
T -clamps for Panther

60

38400

640

... More
33 KV (45KN) ,16 mm FRP with 25 mm per KV creepage Composite Polymer Disc Insulators

99

25542

258

... More
33 KV Strain hardware (T&C type) fittings suitable for Panther

12

3516

293

... More
Anti climbing devices ( Barbed wire 2.24 mm dia, 14 SWG)

10

3480

348

... More
DANGER BOARD ENAMELED 11 KV

1

79

79

... More
DANGER BOARD ENAMELED 33 KV

7

553

79

... More
ACDB 415 V, along with three phase-neutral voltmeter, three phase ammeter and Selector switches, 1no. 200 Amps TPN switch fuse unit as incomer, 1no. 63 Amp. TPN MCCB switches as outgoing feeders & 2no. 32 Amp. MCCB as outgoing for yard and control room lightining and 6 no. 16 no. MCCB for control panels, Each incoming & outgoing shall have indicating lamp. including 20% spare

1

128085

128085

... More
Direct Curent Distribution Board (DCDB) 24 Volts Indoor floor / wall mounted comprising of 1 no. 2P/100A DC MCCB 5A Switch Fuse Unit as incommer and 8 no. 2P/40A MCCB 5A switch fuse units for each individual outgoing circuit of indoor control panels, indoor/outdoor VCB panels, 1 no. 2P/40A MCCB 5A switch for control room emergency DC lighting including 20% as spare. Each incoming & outgoing shall have indicating lamp,

1

58534

58534

... More
Fire extinguisher cartridge CO2 10 kgs

1

6891

6891

... More
LED Lamp with 90 Watt (Complete)

5

94080

18816

... More
Marshelling box with 10 no. connectors

7

11228

1604

... More
Concreting (1:3:6) of stay @ 0.2 Cmt. per stay (16mm)

1.2

6174

5145

... More
Concreting (1:3:6) of stay @ 0.3 Cmt. per stay (16mm)

1.2

6174

5145

... More
Concreting of R S Joist (175x85 mm) /H beam 11 mtr @ 0.70 Cmt.per pole including muffing of pole

5.6

28812

5145

... More
VCB foundation Concreting @ 3.5 cmt. Per foundation (1:3:6)(Rate with GST)

24.5

126052

5145

... More
Concreting (1:3:6) of for H.Beam @ 0.65 cmt. for pole (Base padding + muffing)

11.7

60196

5145

... More
Concreting (1:3:6) of for R.S. Joist @ 0.65 cmt. for pole (Base padding + muffing)

4.55

23409

5145

... More
PTR Foundation as per attached drawing upto 10 MVA

1

95771

95771.16

... More
Work Executed by Contractor

-

-

-

... More
Pole erection complete with earthing Pole erection complete with earthing H-beam/Rail pole-9 mtr long With Back Filling of Boulder in Normal Soil ( Errection Charges including transportation charges)

9

16641

1849

... More
Pole erection complete with earthing Pole erection complete with earthing H-beam/Rail pole-9 mtr long With Back Filling of Boulder in SOFT Soil ( Errection Charges including transportation charges)

9

33282

3698

... More
Pole erection complete with earthing Pole erection complete with earthing RS JOIST-9.3 mtr long With Back Filling of Boulder in Normal Soil ( Errection Charges including transportation charges)

3

5277

1759

... More
Pole erection complete with earthing Pole erection complete with earthing RS JOIST-9.3 mtr long With Back Filling of Boulder in SOFT Soil ( Errection Charges including transportation charges)

4

14072

3518

... More
Pole erection complete with earthing Pole erection complete with earthing H.Beam 11 mtr long With Back Filling of Boulder in Normal Soil ( Errection Charges including transportation charges)

4

8596

2149

... More
Pole erection complete with earthing Pole erection complete with earthing H.Beam 11 mtr long With Back Filling of Boulder in SOFT Soil ( Errection Charges including transportation charges)

4

17192

4298

... More
Stay set 16 mm. Complete erection including Pit digging, binding of stay wire at eye bolt , stay insulator and anchor rod & tigtning on pole in Normal Soil

3

1782

594

... More
Stay set 16 mm. Complete erection including Pit digging, binding of stay wire at eye bolt , stay insulator and anchor rod & tigtning on pole in SOFT Soil

3

3564

1188

... More
Stay set 20 mm. Complete erection including Pit digging, binding of stay wire at eye bolt , stay insulator and anchor rod & tigtning on pole in Normal Soil

2

1354

677

... More
Stay set 20 mm. Complete erection including Pit digging, binding of stay wire at eye bolt , stay insulator and anchor rod & tigtning on pole in SOFT Soil

2

2708

1354

... More
11 KV TOP CLAMPS 65X65X6MM ANGLE TYPE (each weight-3.0 Kg)

12

588

49

... More
33 KV Top clamps 75x75x6 mm Angle

12

840

70

... More
Fixing of 11 KV Pin Insulator

24

816

34

... More
T CLAMP ALUMINUM FOR BUS BAR PANTHER RUN PANTHER TAP

60

11340

189

... More
Crane charges for Handling & installation of Power Transformer with fitting of all radiaters for site location above 50 kms from crane availbality location (Unload)

1

17047

17047

... More
Crane charges for Handling & installation of Power Transformer with fitting of all radiaters for site location upto 50 kms from crane availbality location (Load)

1

12284

12284

... More
Trala charges for Transportation of Power Transformer from Area stores to 33/11 KV Sub Station for Minimum

160

60000

375

... More
Stringing of Bus bar conductor with fixing of terminal clamps 11 KV Bus bar per bays stringing upper and lower bus bar with drop jumpers

4

19760

4940

... More
Jumpers from 33 KV gartry through 33 KV VCB to PTR to 11 KV gantry through 11 KV VCB

7

34580

4940

... More
Stringing of Bus bar conductor with fixing of terminal clamps 33 Kv side stringing upper and lower bus bar of 3 wire in each bus, drop jumpering and jointing with clamps with each phase, with incoming DP/ ME to BUS

3

14820

4940

... More
Handling& instalation of 11 KV CT with earthing arrengment

12

4860

405

... More
Handling & installation of 11 KV feeder/Xmer VCB complete on Foundation & tightening/ alingment of VCB

4

11232

2808

... More
Handling & installation of control pannel , including stand of suitable size for 11KV feeder and transformer control.

3

6513

2171

... More
Handling& instalation of 33 KV CT with earthing arrengment

9

4050

450

... More
Handling & installation of 33 KV feeder/Xmer VCB complete on Foundation & tightening/ alingment of VCB

3

10023

3341

... More
Handling & installation of control pannel , including stand of suitable size for 33 KV feeder and transformer control.

3

6513

2171

... More
Erection of Plinth per VCB- 33KV or 11KV [Pit digging-size(3x2x0.6) = 3.6 cu. Mtr,Base filling by Kopra -1.92 cmt., concreting, curing and back filling of pits ]

7

29330

4190

... More
Fixing of Isolator 11 KV ( Set of 3 No. ) complete with handle & pipe

5

50040

10008

... More
Fixing of Isolator 33 KV ( Set of 3 No. ) complete with handle & pipe

4

45000

11250

... More
D.C. CHANNEL 4.8 MTR CENTRE 100X50X6MM (each weight-99.90 Kg)

34

74664

2196

... More
Marshelling box with 10 no. connectors

7

2926

418

... More
CONTROL CABLE 8 CORE 2.5SQ MM COPPER CONTROL CABLE UNARMOURED

0.05

1278

25569

... More
CONTROL CABLE 4 CORE 2.5 SQ MM COPPER CONTROL CABLE UNARMOURED

0.3

4363

14544

... More
Handling& instalation of 11 KV PT with earthing arrengment

3

1215

405

... More
Handling& instalation of 33 KV PT with earthing arrengment

3

1350

450

... More
Cable end termination/straight through kits for all 3 core 11 KV cable size with lugs

2

5346

2673

... More
LEAD ACID BATTERY SET 30 VOLTS 200 AH

1

8176

8176

... More
BATTERY CHARGER 230 V AC INPUT 20 AMP, 30 V DC OUTPUT SOLID STATE TYPE

1

1454

1454

... More
Fixing of D. C.Cross arm 8' Centre along with plates, 6 nos. H/Ws, 6 Nos. Disc Insulators and fixing of supporting clamps on both the poles.

11

9724

884

... More
Fixing of D.O.Fuse Unit 11 KV ( Set of 3 No. )

1

328

328

... More
Fixing of L. A. Unit 11 KV with earthing (Set of 3 No.)

3

606

202

... More
Fixing of L. A. Unit 33 KV with earthing (Set of 3 No.)

3

1890

630

... More
Fixing of Transformer Structure complete with base channel , supporting clamp and belting of fixing by turn buckles

1

695

695

... More
Handling & Installation of 100 KVA Distribution Transformer (DTR) on DP, tightening with turn buckles on both sides, oples clamping and boting of base jumpering on HT side

1

3168

3168

... More
Handling & Installation of 100 KVA Dist. Box on DP, complete wiring, connecting LT cable on bushing and LT feeders (2 Nos.)

1

1883

1883

... More
DCDB Direct Curent Distribution Board installation with complete wiring

1

6570

6570

... More
G.I.Flat 50x6 mm. digging of 0.5 m deep trench for laying earthing including welding and back filling

1500

24000

16

... More
G.I. Pipe 40 mm dia errection with pit digging & back filling

156

47268

303

... More
Back filling of 1 PIPE PIT with black cotton soil-(2.25 cu.m)

2

418

209

... More
BackFilling of 2 PIPE PIT with black cotton soi (4.5cu.m)

7

2926

418

... More
Back filling of 4 PIPE PIT with black cotton soil-(9 cu.m).

9

7524

836

... More
ACDB 415 V installation with complete wiring

1

14490

14490

... More
Jumpering work at D. P. and Transformer

1

1020

1020

... More
Labour charges for Concreting (1:3:6) material

48.75

30712

630

... More
Erection of PTR Foundation

1

16560

16560

... More
11 KV (45KN) composite Disc Insulator Polymerwith strain H/w

21

2646

126

... More
33 KV (45KN) Composite Polymer Disc Insulators with strain H/w

99

15147

153

... More
Erection charges for under ground cable earthing/DTR Earthing/RMU/earthinh CSS earthing as per G-1.1

1

3951

3951

... More
Fixing of Anticlimbing Device

10

400

40

... More
Fixing of Danger Board 33 & 11 KV POLE

8

232

29

... More
Total Labour & material supply by Contractor

1

737035

1

... More
GST Amount @ 18%

1

132666

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.