Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited - MPMKVVCL Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date4 Feb 2019
Closing Date13 Feb 2019
Tender Amount₹ 5,90,991 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 10,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Dgm/ccd/18-19/ipds/2244 Bhopal Dt. 02.02.19
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_MKVVC_11261_1Bid Award Id
ViewTender No
DGM/CCD/18-19/IPDS/2244 Bhopal Dt. 02.02.19Tender Authority
Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited ViewPurchaser Address
-Website
http://https://portal.mpcz.in/web/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Concreting of Rail/H-Beam supports @ 0.8 Cmt.per pole including muffing of pole, stay (20mm/25mm) @ 0.3 cmt per stay (Material Supply & Erection by Contractor)
36.15
-
-
... More
Covered Conductor 70 Sq. mm XLPE insulation for 11 KV (Material Supply & Erection by Contractor)
180
-
-
... More
Danger Boards Enamelled 33 Kv (Material Supply & Erection by Contractor)
35
-
-
... More
Earthing Coil 115 Turns of 50 MM Dia and 2.5 mtr Lead of 4.0 MM G.I.Wire (Material Supply & Erection by Contractor)
39
-
-
... More
M S Bolt with Nut (Material Supply & Erection by Contractor)
144
-
-
... More
Red Oxide Paint (Material Supply & Erection by Contractor)
39
-
-
... More
Fixing of 11 KV AB Switch Polymer type 400 Amp with complete fitting (Material Supply By Company & Erection by Contractor)
4
-
-
... More
Fixing of 11 KV Composite Polymer Disc Insulator (Material Supply By Company & Erection by Contractor)
108
-
-
... More
Fixing of 11 KV Guarding Channel 75x40x6 mm (Material Supply By Company & Erection by Contractor)
35
-
-
... More
Fixing of 11 KV Polymer Pin Insulator (Material Supply By Company & Erection by Contractor)
81
-
-
... More
Fixing of 11 KV Single Pole Cut Point fitting 100x50x6 mm. channel (Material Supply By Company & Erection by Contractor)
14
-
-
... More
Fixing of 11 KV Strain Hardware (T & C Type) fitting (Material Supply By Company & Erection by Contractor)
108
-
-
... More
Fixing of 11 KV Top Clamp 65x65x6 mm. angle (Material Supply By Company & Erection by Contractor)
24
-
-
... More
Fixing of 11 KV V Cross arm 65x65x6 mm. angle type (Material Supply By Company & Erection by Contractor)
24
-
-
... More
Stringing of Conductor including paying out tensioning of conductor with isulator and tightening of stays(Rates exclusive of binding wire and tape) With AAAC Dog Conductor 0.10 sq.inch 100 sq. mm Al. Eq. ( 3 No. Conductor ) (Material Supply By Company & Erection by Contractor)
5.56
-
-
... More
Erection of H-Beam 11 Meter 152x152 mm.37.1 Kg./Meter (Material Supply By Company & Erection by Contractor)
10
-
-
... More
Erection of H-Beam 13 Meter 152x152 mm.37.1 Kg./Meter (Material Supply By Company & Erection by Contractor)
39
-
-
... More
Fixing of H-Beam Clamps 65x8 mm Flat (in numbers) (Material Supply By Company & Erection by Contractor)
78
-
-
... More
Fixing of H-Beam Back Clamps 65x8 mm Flat (in numbers) (Material Supply By Company & Erection by Contractor)
78
-
-
... More
Fixing of Stay Clamps 65x65x8 mm Flat (in numbers) (Material Supply By Company & Erection by Contractor)
14
-
-
... More
Stay Set 20 mm complete, back clamp stay insulator stay wire 7/4.0 mm 8.5 Kg/stay set (Material Supply By Company & Erection by Contractor)
26
-
-
... More
Fixing of D.C.Channel arms 8 ' center to center (100x50x6 mm) Channel (Material Supply By Company & Erection by Contractor)
4
-
-
... More
Labour Charges for Pole Pit Digging (H-Beam 11 Mtr long)
10
-
-
... More
Labour Charges for Pole Pit Digging (H-Beam 13 Mtr long)
39
-
-
... More
Labour Charges for Stay Pit Digging
26
-
-
... More
Transportation of H-Beam Pole (between 00 to 01 Km.)
49
-
-
... More
Labour Rate for Cutting febrication & Galvanisation of Single Pole Cut Point Channel (100x50x6 mm) Channel 1.65 mtr. long (Channel Grade A Confirming as per IS 2062) (Hot Dipped Galvanized)
624.82
-
-
... More
Labour Rate for Cutting febrication & Galvanisation of 11 KV Guarding Channel (75x40x6 mm) (Channel Grade A Confirming as per IS 2062) (Hot Dipped Galvanized)
453.6
-
-
... More
Labour Rate for Cutting febrication & Galvanisation of 11 KV Top Clamp (65x65x6 mm) (Angle Grade A Confirming as per IS 2062) (Hot Dipped Galvanized)
84
-
-
... More
Labour Rate for Cutting febrication & Galvanisation of 11 KV V Cross arm (65x65x6 mm) (Angle Grade A Confirming as per IS 2062) (Hot Dipped Galvanized)
339.84
-
-
... More
Labour Rate for Cutting febrication & Galvanisation of D.C.Channel arms 8 ' center to center (100x50x6 mm) Channel (Channel Grade A Confirming as per IS 2062) (Hot Dipped Galvanized)
225.28
-
-
... More
Labour Rate for Cutting febrication & Galvanisation of H-Beam Back Clamps (Flat Grade A Confirming as per IS 2062) (Hot Dipped Galvanized)
149.76
-
-
... More
Labour Rate for Cutting febrication & Galvanisation of H-Beam Clamps (Flat Grade A Confirming as per IS 2062) (Hot Dipped Galvanized)
249.6
-
-
... More
Labour Rate for Cutting febrication & Galvanisation of Stay Clamps (Flat Grade A Confirming as per IS 2062) (Hot Dipped Galvanized)
44.8
-
-