Directorate Of Sports And Youth Welfare Tender

Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.

Directorate Of Sports And Youth Welfare Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date22 Jul 2023
Closing Date10 Aug 2023
Tender AmountRefer Documents 
Notes
Download

Costs

  • EMD

    ₹ 4,00,000
  • Document Cost

    ₹ 5,000
  • Tender Fee

    ₹ 1,534

Summary

Synthetic Turf For Futsal Ist Call

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying, laying and compacting of stone aggregate 20mm nominal size to form a contour and elevation to the desired level.

100

260000

2600

... More
Supplying, laying and compacting of stone aggregate 10mm nominal size to form a contour and elevation to the desired level.

50

145000

2900

... More
Supplying, stone dust to fill the voids

50

175000

3500

... More
SUB HEAD- CONCRETE WORK Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).

10

75000

7500

... More
1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).

25

170000

6800

... More
Sub Head Drainage Providing and laying non-pressure NP2 class (light duty) R.C.C. S & S jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete: 300 mm dia. R.C.C. pipe

100

86365

863.65

... More
Constructing brick masonry chamber 90x90x100cm inside, brick work in cm 1:4(1cement:4coarse sand) for sluice valve,electrical cable etc with RCC top slab 1:2:4 mix(1cement:2coarse sand:4 graded stone aggregate 20mm nominal size)i/c necessory excavation,foundation concrete 1:5:10((1cement:2coarse sand:4 graded stone aggregate 40mm nominal size) and inside plastering with cement mortar 1:3(1cement:3coarse sand) 12mm thick, finished with a floating coat of neat cement complete as per standard design: With common burnt clay F.P.S. (non modular) bricks of class designation 7.5

5

54525

10905.05

... More
RCC Drain Cover providing and fixing of 60mm thick,perforated,Pre cast RCC drain cover of size 600 x 600 x 60 mm with 1'' dia (8 to 12 nos round hole ) with 8mm rods @ 100mmc/c over the walls of drain at proper level for ease flow of water and both side of precast will be filled by cc 1:1.5:3 incl. side shuttering etc. complete in all respect as per direction of engineer in charge.make KK or equivalent as approved by engineer in charge.

85

255000

3000

... More
SUB HEAD- BRICK WORK Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in : Cement mortar 1:4 (1 cement : 4 coarse sand)

60

450000

7500

... More
SUB HEAD- FINISHING 12 mm cement plaster of mix : 1:4 (1 cement : 4 coarse sand)

150

52500

350

... More
SUB HEAD SYNTHETIC FOOTBALL TURF Supplying and laying of UV resistant synthetic artificial turf should be tested by FIFA as per latest guidelines quality rating including the followings, complete as per the enclosed specifications and as below : (a) Complete artificial turf of the diamentions and specifications enclosed, of 50 mm pile height, in NIT as per FIFA quality rating on the existing base prepared for the purpose. (b) Turf panels glued together with infill of washed silica sand and rubber granules of recommended quantities. (c) Line markings as per FIFA guidelines for futsal play field including D-area.

1000

5000000

5000

... More
Football post with net (FUTSAL standards)

1

50000

50000

... More
SUB HEAD : FENCING Supply, fabrication & Installation with Garware Netting all around-20 Feet Pole distance 10 feet Each from both sides(Vertical Poles-50*50/Horizontal Poles-35*35 including painting of poles.

800

800000

1000

... More
Supply & Installation of Top Garware Net / Shade Net 50 mm with Fabrication Poles Support for Cross Support.

1000

450000

450



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.