Bharat Sanchar Nigam Limited Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Bharat Sanchar Nigam Limited - BSNL Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date31 Dec 2024
Closing Date8 Jan 2025
Tender Amount₹ 3,12,801
Costs
EMD
₹ 6,260Document Cost
₹ 590Tender Fee
Refer Documents
Summary
Dismantling Levelling Re Erection The 40 Mtr Gbt 1 No Full Ht Tightening Nut Bolts Including Replacement Damaged Missing Nut Bolts Tower Member Partly 1 No 40 Mtr Gbt Including Strengthening Column Bases Talen And Sandawada Distt Rajgarh Ba Bhopal
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_BSNL_222153_1Bid Award Id
ViewTender No
NIT NO. 30/EE(C) /BSNL-BPL/2024-25Tender Authority
Bharat Sanchar Nigam Limited ViewPurchaser Address
-Website
http://etenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Dismantling Levelling Re erection the 40 mtr GBT 1 no full ht Tightening Nut Bolts including replacement of damaged missing nut bolts tower member Partly 1 No 40 mtr GBT including strengthening column bases Talen and Sandawada Distt Rajgarh BA Bhopal
Dismantling Levelling Re erection the 40 mtr GBT 1 no full ht Tightening Nut Bolts including replacement of damaged missing nut bolts tower member Partly 1 No 40 mtr GBT including strengthening column bases Talen and Sandawada Distt Rajgarh BA Bhopal
BOQ Items
... More
Providing and fixing the missing members, nuts, bolts and spring washers. (Supply of the new GI members, nut bolts, washers shall be paid under the relevent item seprataly while the other consumables are to be arranged by the contractor at his cost).
-
-
-
... More
Maintenance of ladder and its safety rings, climbing facilities, platforms and its handrail catwalks and antenna fixing mounts including tightening of nuts and bolts to make it secure and safe.
-
-
-
... More
Checking the base plate against corrosion and tightening of the base plate fixtures with tower main leg including nuts and check nuts.
-
-
-
... More
Maintenance of proper drainage in and around the foundation including removal of unwanted vegetation growths all complete as per the direction of Engineer- in-Charge
-
-
-
... More
Check the verticality of tower using theodolite as per provision prescribed in IS 12843 1989. The tower alignment to be checked with theodelite on two perpendicular surface. This does not include re-erection if required to achieve verticality) (The required theodolite will be arrange by the contractor at site of work )
-
-
-
... More
Checking the gantry and its ground supports (This does not include cost of concreting if necessary to improve the support)
-
-
-
... More
Providing and applying rust removing solution and Zinc Spray on tower rusted area whereevr necessary as per manufracture recommendation. This will include other operations including cutting of unuseable nuts/ bolts where necessary.
-
-
-
... More
NOTE-I: Rate includes cost of all operations mentioned above at S. No. (1.01 to 1.09) including hire charges of tools, plants and machineries, Binaculars for inspection, insurance premium of labours etc. and nothing extra shalll be paid on this account.
-
-
-
... More
Note - Rate of item of the tower of other heights shall be derived by interpolation or extrapolation of the rates of nearest heights
-
-
-
... More
(a) 40m High Tower of any Make, Shape and Weight.
1
-
-
... More
Supplying at the site of work Hot Dip Galvanised members for replacing the missing members (if any) of Tower, Working Platform, Safety Cage, Ladder, Wave Guide Rack, Antennea Fixture etc. of required section, shape and size including Drilling Holes for fixing bolts etc. all in conformity with the approved drawings of BSNL and as per the directions of Engineer-in-charge and shall be made out of primary source of structural steel of approved make: viz. SAIL, TISCO, RINL etc. NOTES: (a) All material shall be Hot Dip Galvanised. The fabrication & galvanising shall be as per the relevant IS code. (b) Weight of each member supplied shall be taken for payment purpose. (c) The Rate includes the cost of all material and labour required for all the operations mentiond in the item including all carriage, taxes and other contingencies.
215
-
-
... More
Supplying at the site of work Hot Dipped Galvanised Steel Plain Nuts, Check Nuts, Bolts, Plain & Spring Washers of grade 5.6 and as per IS: 12427 required size as per the structural drawing of the tower including threading the bolts for the required length all complete as directed by the Engineer-in-Charge.
250
-
-
... More
Credit for galvanized steel section like angles, flats, bolts, nuts, spring washers etc removed from the tower due to corresion, cracked wrapped bent sillipary etc (The contractor shall be allowed to take the steel sections only after the completion of the work)
150
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
-
-
-
... More
(a) 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)
1
-
-
... More
(b) 1:1.5:3 (1 Cement: 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
1
-
-
... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared.
500
-
-
... More
12 mm cement plaster of mix :
-
-
-
... More
(a) 1:4 (1 cement: 4 fine sand)
15
-
-
... More
Dismantling and dismembering of the top distorted/out of line portion of the 40M high ground based tower upto a required height necessary to make it correctly erect at Talen(Distt-Rajgarh) and stacking of tower members within lead of 50 mtr. including all fasteners, mounts, base plate, platforms, ladder, vertical cable tray, anteena, RF cable, electrical cable etc. all complete as per direction of Engineer in charge. Note:- The rate of this item shall include the cost of all labour, T&P other equipments etc. required for all operations specified above including scaffolding, saftey measures, belts, insurance of labour etc. The rate includes all the above operations and nothing extra shall be paid. (Part tower to be dismantle and dismembered at Talen)
1
-
-
... More
Re-erection of the dismantled tower portion after correcting the rest of the bottom portion of the 40M tower and erecting the same dismantled tower portion to its full height including making all necessary operations like straightening the bend members, providing new members, if required, and replacing the missing and damaged nut and bolts, if need be, and making all arrangements to reerect a perfect 40M tower as per the direction of Engineer-in-charge. Note:- The rate of this item shall include the cost of all labour, T&P other equipments etc. required for all operations specified above including scaffolding, saftey measures, belts, insurance of labour etc. The rate includes all the above operations and nothing extra shall be paid. The cost of new members to be provided, nuts and bolts etc. to be paid for seperately.
The rates also includes including refixing of all fasteners, mounts, base plate, platforms, ladder, vertical cable tray, anteena, RF cable, electrical cable etc as per existing at Site.(Part of Tower to be reerected)
1
-
-
... More
Dismantling and dismembering of 40M high ground based tower including stacking of tower members within lead of 50 mtr. including all fasteners, mounts, base plate, platforms, ladder, vertical cable tray, anteena, RF cable, electrical cable etc. all complete as per direction of Engineer in charge. Note:- The rate of this item shall include the cost of all labour, T&P other equipments etc. required for all operations specified above including scaffolding, saftey measures, belts, insurance of labour etc. The rate includes all the above operations and nothing extra shall be paid. (Threadning of Nuts and cutting of welded nuts if any to be cut by cutting machine is included in the item)
(The full tower to be dismantle and dismembered)
1
-
-
... More
Re-erection of the dismantled tower portion after levelling and correcting of the 40M tower base and erecting the same dismantled tower portion to its full height including making all necessary operations like straightening the bend members, providing new members, if required, and replacing the missing and damaged nut and bolts, if need be, and making all arrangements to reerect a perfect 40M tower as per the direction of Engineer-in-charge. Note:- The rate of this item shall include the cost of all labour, T&P other equipments etc. required for all operations specified above including scaffolding, saftey measures, belts, insurance of labour etc. The rate includes all the above operations and nothing extra shall be paid. The cost of new members to be provided, nuts and bolts etc. to be paid for seperately.The rates also includes including refixing of all fasteners, mounts, base plate, platforms, ladder, vertical cable tray, anteena, RF cable, electrical cable etc as existing at Site.(The full tower to be erected)
1
-
-