Bharat Sanchar Nigam Limited Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Bharat Sanchar Nigam Limited - BSNL Tender
Telecommunication Services
Eprocure
Opening Date19 Sep 2022
Closing Date10 Oct 2022
Tender Amount₹ 23,36,792
Costs
EMD
₹ 58,420Document Cost
₹ 590Tender Fee
Refer Documents
Summary
Battery And Smps Power Plant Installation Work Ba Bsnl Ujjain
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_BSNL_129334_1Bid Award Id
ViewTender No
T-02306-39/Bty PP Inst Work BA BSNL UjjainTender Authority
Bharat Sanchar Nigam Limited ViewPurchaser Address
-Website
http://etenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Notice inviting tender of Battery and SMPS Power Plant Installation work
Tender Documents
BOQ Items
... More
600 AH Battery set
30
-
-
... More
1000 AH Battery set
1
-
-
... More
1500 AH Battery set
2
-
-
... More
2000 AH Battery set
1
-
-
... More
Assistance work during initial charge and discharge cycle of battery sets, self testing and latter testing by A/T team.
-
-
-
... More
Upto 600 AH Battery set
353
-
-
... More
More than 600 AH Battery set
4
-
-
... More
Installation of SMPS Power Plant as per departmental stadard including extending AC/DC power cable to equipment, lugging, connecting cable and testing.
-
-
-
... More
25 Amp (3+1)
79
-
-
... More
25 Amp (4+1)
12
-
-
... More
25 Amp (5+1)
95
-
-
... More
25 Amp (9+1)
4
-
-
... More
50 Amp (4+1)
5
-
-
... More
100 Amp (3+1)
24
-
-
... More
100 Amp (4+1)
9
-
-
... More
100 Amp (5+1)
2
-
-
... More
100 Amp (7+1)
3
-
-
... More
100 Amp (10+1)
2
-
-
... More
100 Amp (12+1)
1
-
-
... More
200 Amp (14+1)
1
-
-
... More
Assistance to termination, Alarm warning and inter connection of different units making load coils . Self testing & latter testing bt A/T Teams. (100 Amp or more)
-
-
-
... More
All type of 100 Amp and above.
43
-
-
... More
Complete fixing of Runway (Including material) as per departmental standard.
100
-
-
... More
Laying of AC power Cable from PDP to equipment including lacing, lugging, termination & testing as per departmental standard.
-
-
-
... More
Laying of AC cable less than or equal to 50 Sq. MM.
350
-
-
... More
Laying of AC cable greater than 50 Sq. MM.
105
-
-
... More
Laying of DC power Cable from PDP to equipment including lacing, lugging, termination & testing as per departmental standard.
-
-
-
... More
Laying of DC cable less than or equal to 50 Sq. MM.
350
-
-
... More
Laying of DC cable greater than 50 Sq. MM.
101
-
-
... More
Dismentalling of Battery sets.
-
-
-
... More
200 AH Battery set
266
-
-
... More
400 AH Battery set
57
-
-
... More
600 AH Battery set
30
-
-
... More
1000 AH Battery set
1
-
-
... More
1500 AH Battery set
2
-
-
... More
2000 AH Battery set
1
-
-
... More
Dismentalling of Power Plants.
-
-
-
... More
25 Amp (3+1)
79
-
-
... More
25 Amp (4+1)
12
-
-
... More
25 Amp (5+1)
95
-
-
... More
25 Amp (9+1)
4
-
-
... More
50 Amp (4+1)
5
-
-
... More
100 Amp (3+1)
24
-
-
... More
100 Amp (4+1)
9
-
-
... More
100 Amp (5+1)
2
-
-
... More
100 Amp (7+1)
3
-
-
... More
100 Amp (10+1)
2
-
-
... More
100 Amp (12+1)
1
-
-
... More
200 Amp (14+1)
1
-
-
... More
Opening and verification of wooden packing cases of different Sizes/Weight having equipment iron material and Shifting/Lifting /Arranging material equipment at installation place with in building. This also includes depositing the wooden material to the place specified by the Engineer in charge
-
-
-
... More
Packing Cases below and equal to 100 kg weight
125
-
-
... More
Packing Cases above 100 kg weight
75
-
-
... More
Lifting charges of Packing case per floor including shifting on the floor. If the installation floor is other than the floor where packing cases were opened
-
-
-
... More
i. Up to 100 kg
113
-
-
... More
ii More than 100 kg.
58
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements