Bharat Sanchar Nigam Limited Tender
... More
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Bharat Sanchar Nigam Limited - BSNL Tender
Telecommunication Services
Eprocure
Opening Date19 Apr 2023
Closing Date9 May 2023
Tender Amount₹ 4,98,938
Costs
EMD
₹ 12,473Document Cost
₹ 590Tender Fee
Refer Documents
Summary
Battery And Power Plant Installation Work
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_BSNL_152081_1Bid Award Id
ViewTender No
/ T-2306-222/ BTY and Power Plant InstallationTender Authority
Bharat Sanchar Nigam Limited ViewPurchaser Address
-Website
http://etenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
600 AH Battery set
20
-
-
... More
1000 AH Battery set
1
-
-
... More
1500 AH Battery set
2
-
-
... More
2000 AH Battery set
1
-
-
... More
Installation of SMPS Power Plant as per departmental stadard including extending AC/DC power cable to equipment, lugging, connecting cable and Acceptance testing.
-
-
-
... More
25 Amp (4+1)
30
-
-
... More
50 Amp (3+1)
25
-
-
... More
50 Amp (4+1)
10
-
-
... More
100 Amp (3+1)
20
-
-
... More
100 Amp (4+1)
10
-
-
... More
200 Amp (10+2)
1
-
-
... More
Assistance to termination, Alarm warning and inter connection of different units making load coils . Self testing & latter testing bt A/T Teams. (100 Amp or more)
-
-
-
... More
All type of 100 Amp and above.
25
-
-
... More
Complete fixing of Runway (Including material) as per departmental standard.
65
-
-
... More
Laying of AC power Cable from PDP to equipment including lacing, lugging, termination & testing as per departmental standard.
-
-
-
... More
Laying of AC cable less than or equal to 50 Sq. MM.
350
-
-
... More
Laying of AC cable greater than 50 Sq. MM.
105
-
-
... More
Laying of DC power Cable from PDP to equipment including lacing, lugging, termination & testing as per departmental standard.
-
-
-
... More
Laying of DC cable less than or equal to 50 Sq. MM.
350
-
-
... More
Laying of DC cable greater than 50 Sq. MM.
101
-
-
... More
Dismentalling of Battery sets,including recovery of all stores & Deposit to concern SDE/JTO in charge
-
-
-
... More
200 AH Battery set
10
-
-
... More
400 AH Battery set
15
-
-
... More
600 AH Battery set
10
-
-
... More
1000 AH Battery set
1
-
-
... More
1500 AH Battery set
2
-
-
... More
2000 AH Battery set
1
-
-
... More
Dismentalling of Power Plants.
-
-
-
... More
25 Amp (4+1)
10
-
-
... More
50 Amp (3+1)
2
-
-
... More
50 Amp (4+1)
2
-
-
... More
100 Amp (3+1)
15
-
-
... More
100 Amp (4+1)
10
-
-
... More
200 Amp (10+2)
1
-
-
... More
Opening and verification of wooden packing cases of different Sizes/Weight having equipment iron material and Shifting/Lifting /Arranging material equipment at installation place within building. This also includes depositing the wooden material to the place specified by the Engineer in charge
-
-
-
... More
Packing Cases below and equal to 100 kg weight
125
-
-
... More
Packing Cases above 100 kg weight
75
-
-
... More
Lifting charges of Packing case per floor including shifting on the floor. If the installation floor is other than the floor where packing cases were opened
-
-
-
... More
Up to 100 kg
110
-
-
... More
More than 100 kg.
60
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements