Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

Bharat Heavy Electricals Limited

Bhopal, Madhya Pradesh

  • Opening Date

    06 Aug 2019

  • Closing Date

    23 Aug 2019

  • Tender Amount

    Refer document

  • EMD

    ₹ 33,180

Are you Looking for Joint Venture Partners, Contractor Consortium, Back-to-Back Contractor, Project Financier?
We will help you to find the right match for FREE.
Summary

Receipt, Handling, Storage, Erection, Commissioning And Handing

Don't have sufficient eligibility, BG funds or resources?
We will help you to find the right match for FREE.
BOQ Items

No BOQs Available

Page No. 1 of 27 TRANSFORMER SERVICES DEPARTMENT Phone: +91-755-2502686, 3651, 3195 E-mail: txx.bpl@bhel.in krishnasingh@bhel.in TENDER NOTICE NO. TXX/TN/2019-20/06 DATED: 05/08/2019 Sub.: Receipt, unloading, handling, storage, erection, commissioning and handing over of 1 No. x 315 MVA 400/√3 / 213/√3 /213 KV 1-Ø Convertor Transformer at M/s. Powergrid Rihand. Dear Sir(s), Sealed tenders are invited for carrying out the subject work. The tender submission and opening details are as follows: • DATE & TIME OF RECEIPT OF THE TENDER: 16/08/2019 Till 11.00 Hrs. • DATE & TIME OF TENDER OPENING: 16/08/2019 after 14.00 Hrs. • PLACE OF TENDER SUBMISSION: “GREEN COLOURED WORKS CONTRACT TENDER BOX” placed in Tender Room, Administrative Building, Ground Floor, BHEL, Bhopal – 462 022. The details of the work shall be as per the Scope of Work (Clause No. 4.0). Prices are to be submitted as Price- bid format (Annexure-I). The other conditions and details of tender are as follows: 1.0) PROJECT: 1 No. x 315 MVA 400/√3 / 213/√3 /213 KV 1-Ø Convertor Transformer for Powergrid Rihand. 2.0) DETAILS OF EQUIPMENTS: 3.0) APPROXIMATE SHIPPING WEIGHT & DIMENSIONS OF MAJOR PARTS: Sl. No. Description 315 MVA Convertor Transformer 1. Shipping Weight transformer tank 220.0 Tons 2. Weight of Accessories 60.0 Tons 3. Quantity of oil 87.20 KL 4. Dimension of transformer tank L-9412, W-3840 , H- 4250 mm 5. 420 KV, HV Bushing Dimensions L- 6865 mm, Wt. 1500 Kg 4.0) SCOPE OF WORK: This project consists of E&C of 1 no. 315 MVA 400/√3 / 213/√3 /213 KV 1-Ø Convertor Transformer (HVDC Transformer) is to be carried out at Powergrid Rihand. The contractor to be engaged for E&C will be required to moblise their T&P and man power after award of work to site and commence the work at site within 7 days of time. The details of work content to be carried out by the Contractor will broadly comprise of following 5 stages:  STAGE – I : STORAGE OF ACCESSORIES 4.1 CONSTRUCTION OF TEMPORARY STORE & WATCH & WARD: 4.1.1 The contractor will have to build a temporary store cum office at the site at an appropriate location to be provided by the customer. The store shall have the following: • A covered room/ porta-cabin of minimum size 4M x 4M for office and another covered room/container of minimum size of 4Mx8M for storing of fragile accessories and important costly items. • An open fenced area of about 12M x 12M shall be covered for storing large accessories suitable for outdoor storage like oil drums, bushings, conservator, pipe 1 No. x 315 MVA Convertor Transformer (HVDC Transformer) of Powergrid Rihand Site. Page No. 2 of 27 work etc. This open yard shall be elevated from ground level to avoid water logging. No material shall be directly placed / stored on open/ loose soil. • The contractor will have to maintain the facilities like furniture for office, electricity & water in store area. The contractor has to make arrangement for inspection, verification, storage, upkeep during storage & watch and ward of the equipment’s/ material dispatched to site from the time to time till final take over by Customer. • Any loss damage, theft to the materials/ equipment’s/ installation (if any) will have to be compensated by the Contractor in case of non-deployment, negligence or willful lapses. Sufficient numbers of watchmen shall be deployed by the Contractor at required locations for this purpose at his cost. In accidental cases, it is responsibility of the contractor to file F.I.R. and provide peripheral assistance for insurance survey and claims under insurance policy. The Contractor will have to submit the actual photograph of store constructed by them at site duly certified by self & BHEL/Customer representative along with eh bill to claim the changes on this account.  STAGE-II: P

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.