Airports Authority Of India Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Airports Authority Of India - AAI Tender
Civil And Construction
Road Construction
Eprocure
Opening Date2 Aug 2024
Closing Date23 Aug 2024
Tender Amount₹ 76,18,65,000
Costs
EMD
₹ 1,01,18,650Document Cost
₹ 11,800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_AAI_203247_1Bid Award Id
ViewTender No
AAI/CHQ/Engg./WR/Bhopal/PTTTender Authority
Airports Authority Of India ViewPurchaser Address
-Website
http://https://www.aai.aero/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Excavation in Soil using Hydraulic Excavator and Tippers with disposal within airport premises. (Excavation for roadwork/runway/taxiway in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location for all lifts and lead within airport primises as per direction and satisfaction of Engineer in charge)
155045
-
-
Excavation in Ordinary Rock using Hydraulic Excavator and Tippers with disposal within airport premises (Excavation for roadway/runway/taxiway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections, and transporting to embankment site for all lifts and lead within airport primises as per direction and satisfaction of Engineer in charge)
34960
-
-
Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and disposal for all lifts and lead within airport premises as per direction and satisfaction of Engineer in charge.
3805
-
-
Construction of embankment with available earth from cutting and excavation in layers not exceeding 20cm (loose) in depth (or any thickness approved by Engineer-In-Charge in case of soil compactor is used) including breaking clods, watering, consolidation of each layer with power road roller 8-10 tonnes weight or vibratory roller of adequate capacity under optimum moisture content condition to give maximum laboratory density (standard proctor density) as per table 300-2 of MoRTH specifications complete including leveling fine dressing to the required grade, camber and slope as per MoRTH specifications and direction of Engineer-in-charge with all leads and lifts (payment to be made for compacted quantity only)
110967
-
-
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
2937
-
-
P/L cement concrete - all works upto plinth level :
1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
434
-
-
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
1078
-
-
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete
4039
-
-
Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc
10000
-
-
Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform
460
-
-
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
299200
-
-
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
All works upto plinth level
Concrete of M30 grade with minimum cement content of 350 kg /cum.
(Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.)
2312.5
-
-
Painting runway/taxi track/apron marking with adequate nos of coats to give uniform finish with road marking paint of superior make(Narolac or equivalent) as approved by the Engineer-in-charge, i/c cleaning the surface of ail dirt, scales, oil, grease and other foreign material etc. and lining out complete. New work (Two or more coats)
3681
-
-
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.
With material conforming to Grade-II (size range 53 mm to 0.075 mm) having CBR Value-25
54324
-
-
Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paverfinisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per specifications and directions of Engineer-in-Charge.
52037
-
-
Providing and laying dry lean cement concrete with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 26.5 mm, aggregate cement ratio not exceed 15:1, aggregate gradation after blending to be as per specification, cement content not to be less than 150 kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 MPa at 7 days, mixed in a batching plant as per mix design, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonne vibratory roller, finishing and curing etc complete as per specification and direction of the Engineer-in-Charge
5071
-
-
Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.
200
-
-
Providing and laying Non Pressure NP-4 class (Heavy duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete 450 mm dia RCC pipes.
400
-
-
Providing and laying Non Pressure NP-4 class (Heavy duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete 600 mm dia RCC pipes.
900
-
-
Providing and laying Non Pressure NP-4 class (Heavy duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete 900 mm dia RCC pipes.
270
-
-
Supplying and filling Moorum / Good earth obtained from approved quarry for subgrade, embankment, depressions as instructed and in layers not exceeding 20 cm (loose) in depth (or any thickness as approved by the Engineer-in-Charge in case vibratory roller / soil compactor is used) including breaking clods, watering, consolidating each layer with power road roller 8 -10 tonnes weight or vibratory roller / soil compactor of adequate capacity under optimum moisture content condition to give at least 95% of the maximum laboratory dry density (modified Proctor density) as per IS : 2720 (part VIII) complete including leveling, fine dressing to the required grade, camber and slope complete as per MORTH 2019 specifications and as directed by the Engineer-in-Charge with all leads and lifts. (The item includes cost of work, payment of necessary royalty, any other State Tax, carriage of moorum / suitable earth upto work site for all leads and lifts involved from all sources acquired or arranged by the contractor. Payment shall be made for compacted quantity only. The challan for royalty paid to concerned government body shall be submitted to EIC)
(Note:- Item is considered for replacement of BC soil and make up of undulatation wherever required in subgrade along with to ensure minimum CBR value of subgrade as per design parameter.)
50245
-
-
Providing and placing in position 200 mm thick factory made machine batched & machine mixed Precast RCC Rectangular Covers on drains of various sizes, of M-30 grade cement concrete for RCC work, including cost of centering, shuttering, reinforcement of 16 mm dia TMT bars of Fe 500 or Fe550grade @ maximum 100mm c/c in two layer of long span & 12 mm dia tmt bars @ 120 mm c/c in short span ,neat cement punning on finished surface, properly encased on all edges with 1.6 mm thick , 200 mm wide MS sheet duly painted over priming coat , reinforcement to be welded at edges with MS sheet and providing 2 Nos. 12 mm dia bar for hooks, holes for entry of rain water into the drain etc i/c cost of cartage, all leads & lift, handling at site etc. all complete as per direction of Engineer-in-Charge.
4250
-
-
Providing and laying of Hot Mix Dense Bituminous Macadam (DBM) using crushed stone aggregate of quality, size and grading as specified and cement as specified and Viscosity Grade Bitumen (supplied in bulk) in proportions as per job mix formula and laid to specified levels, grade and camber as per specification, drawings and as directed by the Engineer-in- Charge including compacting with 8-10 tonne, preferably vibratory road roller of adequate capacity to achieve the specified values of compaction, strength, surface accuracy complete [for tendering purpose VG bitumen of grade VG-30 shall be taken as 110 kg/m3 of mix supplied in bulk produced by Govt. Refineries and 2% cement by weight of aggregates as filler material]
20649
-
-
Providing and laying of HOT Mix Semi Dense Asphatic Concreate (SDAC) using crushed stone aggregate of quality size grading as specified and cement filler of quality as specified and Viscosit Grade Bitumen ( supplied in buik) in proportions as per job mix formula and laid to specifiled levels, grade and camber as per specification , drawings and as directed bt the Enhineer-In -Charge including compacting with 8-10 tonne, preferably vibratory road roller of adequate capacity to achieve the specifed values of compactiion , strength, surface accuracy complete ( for tendering purpose VG bitumen of grade VG-30 content shall be taken as 120 kg/m3 of mix supplied in bilk produced by Govt. Refineries and 2% cement by weight of aggregate as filler meterial.
7278
-
-
Providing and laying of HOT Mix Dense Asphatic Concreate (DAC) using crushed stone aggregate of quality size grading as specified and cement filler of quality as specified and Viscosit Grade Bitumen ( supplied in bulk) in proporations as per job mix formula and laid to specified levels, grade and camber as per specification , drawings and as directed by the Engineer-In -Charge including compacting with 8-10 tonne preferably vibratory road roller of adequate capacity to achieve the specifed values of compaction , strength, surface accuracy complete ( for tendering purpose VG bitumen of grade VG-30 content shall be taken as 135 kg/m3 of mix supplied in bilk produced by Govt. Refineries and 2% cement by weight of aggregate as filler meterial).
4739
-
-
Providing and applying primer coat with bitumen emulsion SS1 grade conforming to IS:8887 on prepared surface of Granular Base including clearing of surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means complete in all respects as per direction of Engineer-In-Charge. The contractor shall quote his rates assuming quantity of bitumen emulsion as 0.70 Kg/Sqm. If the actual quantity of bitumen emulsion varies from the quantity assumed above, necessary cost adjustment for deviation in the quantity of bitumen emulsion shall be done as per rate in actual supply voucher from nearest refinery at the time of execution. The rate of bitumen emulsion exclusive of GST shall only be considered for payment.
132268
-
-
Providing and applying tack coat (using bitumen emulsion (Rapid setting) complying with IS:8887), spraying the bitumen with mechanically operated spray unit at the rate specified below, cleaning and preparing the existing pavement surface as per specifications complete in all respects as per direction of Engineer-In-Charge. If the actual quantity of bitumen varies from the quantity specified, necessary cost adjustment for deviation in the quantity of bitumen shall be done as per rate in actual supply voucher from nearest refinery at the time of execution. The rate of bitumen exclusive of GST shall only be considered for payment.
a) 0.20 Kg/Sqm on existing bituminous surface
419840
-
-
Providing and applying tack coat (using bitumen emulsion (Rapid setting) complying with IS:8887), spraying the bitumen with mechanically operated spray unit at the rate specified below, cleaning and preparing the existing pavement surface as per specifications complete in all respects as per direction of Engineer-In-Charge. If the actual quantity of bitumen varies from the quantity specified, necessary cost adjustment for deviation in the quantity of bitumen shall be done as per rate in actual supply voucher from nearest refinery at the time of execution. The rate of bitumen exclusive of GST shall only be considered for payment.
a) 0.30 Kg/Sqm on existing concrete surface
13148
-
-
Providing laying and fixing of self adhesive Glass fiber reinforcement grid of minimum tensile strength 100 KN/m in both directions (longitudinal and transverse) and high modulus fibre glass (Young's modulus E not less than 69000 MPa) of mesh size not exceeding 12.5mm x 12.5mm. The grid shall be pressed down fully with a rubber tired roller and glued to pavement surface. The Longitudinal overlap should not be less than 250 mm and transverse overlap i.e. at the end of the roll should not be less than 150 mm
13148
-
-
Supply of Cast Iron Isolating Transformer Housing box (double hole type), water tight round type, metal container of outside dia 330 mm, height 450 mm made of 10 mm thick cast iron moulding all around, except top surface, which is 15 mm thick cast iron moulding suitable to receive a light fitting base plate / cover plate on the top and having two hole on the periphery center, 75 mm above bottom surface suitable to receive 50 mm dia GI pipe & 15 mm dia GI pipe as required. The box should have two SS earth bolts of M10 x 40 MM tapped inside near the hole (4” away from the hole centre) and having drain hole at the bottom suitably tapped to receive 15 mm dia GI pipe and having clear opening of 220 mm at the top surface and 6 nos M10 tapped hole having centre to cetre distance 260mm along with bolts complete etc as required.
292
-
-
Installation of transformer housing boxes with a base concrete of 1:3:6 of size 630x630x100mm thick all round concrete of 1:2:4, 150mm thick top sloped with 1:2:4 cement concrete including providing and fixing 300 mm long 15mm dia “B” class GI pipe with check nut for drainage of water including excavation of earth and refilling complete etc. as required.
292
-
-
Supply and laying of 50 mm dia, Medium Class GI pipe in ground with threading and alignment of pipe with transformer housing box, providing check nuts etc. as required. (for laying between CI housing box to CI housing box)
12000
-
-
Supply and laying of 15 mm dia, Medium Class GI pipe in ground with threading and alignment of pipe with transformer housing box, providing check nuts etc. as required. (for laying between CI housing box to CI housing box)
12000
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements