Public Works Department Tender
... More
The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Construction Of Compound Wall, Stage And Cycle Shed For Jb School (centre) At Kadmat in Lakshadweep, with an estimated contract value of Rs. 30,54,350. The bid opening date for this tender is 09-03-2019 and the last date for bid submission is 25-03-2019. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Public Works Department - PWD Tender
Opening Date9 Mar 2019
Closing Date25 Mar 2019
Tender Amount₹ 30,54,350
Costs
EMD
₹ 61,087Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_UTL_712_1Tender No
314/EE/LPWD/AMN /2018-19Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://pwd.utl.gov.in/services.html
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Brick work with modular bricks of class designation in foundation and plinth in cement mortar 1:6 ( 1 cement 6 M sand) (Labour Element)
45
-
-
... More
Centering and shuttering including strutting propping etc and removal of form work.(Full Cost)
-
-
-
... More
Cold twisted steel reinforcement for RCC work including bending,binding and placing inposition complete.(Labour Element)
1622
-
-
... More
Reinforced cemnt concrete 1:1:5:3(1cement 1.5 M. sand :3granite chips 20mm nominal size ) excluding cost of cenring shuttering and reinforcement all work up to plinth level.(Labour Element)
-
-
-
... More
Painting Steel work with Deluxe Multi surface paintto give an even shade.Two or more coats applied on @0.90ltr/10 sqm) over under coat of primer applied @ 0.80 ltr/10 sqm of approved and manufacture (Berger /Shalimar/Asian paints) (Full Cost)
170
-
-
... More
Cement concrete block (machine moulded) masonry in Superstructure above plinth level in CM 1:6 with blocks of size 40cmx20cmx15cm.(Labour Element)
53
-
-
... More
Providing and laying cement concrete 1:4:8 (1cement :4 M.sand :8 graded stone aggregate 40mm nominal size) excluding cost of centering and shuttering and reinforcement for foundation and plinth .(Labour Element)
32
-
-
... More
12mm thick cemnt plaster 1:6.(1 Cement : 6 M Sand) (Labour Element)
1011
-
-
... More
Centering and shuttering including strutting propping etc and removal of form work.(Full Cost)
-
-
-
... More
Providing Aluminium sheet roofing fixed with .galvnized iron Jor L hooks and 8mm dia C.I plain bitumen washers complete excluding the cost of purlins, rafters and trusses corrugated sheet 0.56mm thick. (Full Cost)
238
-
-
... More
6mm thick cemnt plaster to ceiling 1:3 (1 Cement : 3 M Sand) (Labour Element)
360
-
-
... More
Suspended floors,roofs,landings,balconies and acess plat form
95
-
-
... More
Providing and fixing Cast Iron Gate in Approved pattern with locking arrangenet, all fitting and including priming coat (Full Cost)
1000
-
-
... More
a) Foundation footings bases of column etc,and mass concrete.
1
-
-
... More
Steel work in built up tubular trusses including cutting, hoisting fixing in position and applying a priming coat of approved steel primer, welded and bolted including special shaped washers etc. complete. G.I Pipe B-Class (Full Cost)
3163
-
-
... More
15mm thick cemnt plaster with premix1:6 (1 Cement : 6 M Sand) on the rough side of single or half brick wall . (Labour Element)
250
-
-
... More
Reinforced cement concrete work in beams ,suspended floors ,roofs,having slope up to 15 degree landing ,shelves chejjas,lintels ,bands,palin window sills,staircase and spiral staircase up to five level excluding cost of centering and shuttering finishing and reinforcemetn with 1:1.5:3(1cement 1.5 M.sand :3graded stone sggregate 20mm nominal size).(Labour Element)
12
-
-
... More
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface.Water thinnable cement primer. (Berger / nerolac /Asian Paint) (Full Cost)
1621
-
-
... More
Filling with Quarry waste/debris ( Dismantled materials issued by department) in trenches, plinth, sides of foundations etc layers not exeeding 20cm plinth, side od foundations etc layers not exceeding 20cm and watering lead up to 50 mtr and lift up to 1.50mtr including loading , transportation and unloading at site.(Full Cost)
118
-
-
... More
Brick work in super structure above plinth level upto floor five level (Labour Element)
12
-
-
... More
a) Foundation footings bases of column etc,and mass concrete.
6
-
-
... More
Reinforced cement concret working (wall any thickness) including attached pilasters ,buttresses plinth and string course, fillets, column, pillars, piers ,abutments,post and struts etc..up to floor five level excluding cost of centering and shuttering finishing and reinforcement.1:1.5:3(1 cement 1.5 M. sand :3 granite chips 20 mm nominal size )(Labour Element)
1
-
-
... More
Providing ridges or hips in Aluminium sheet roofing with G.I /J or L hooks bolts and nuts 8 mm dia G.I plain bitumen washers complete. 0.56mm thick (Full Cost)
19
-
-
... More
Column,piller,piers,abutments,posts and struts
15
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements