Public Works Department Tender
View complete overview of Lakshadweep PWD Tender
Public Works Department - PWD Tender
Pipe Line Project
Eprocure
Opening Date2 Nov 2024
Closing Date6 Nov 2024
Tender Amount₹ 14,81,61,036
Costs
EMD
₹ 24,82,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Supply And Deployment Of 860m Long Hdpe Deep Sea Cold Water Pipe For A Low Temperature
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UTL_2801_1Bid Award Id
ViewTender No
NIT No. 38/NIT/EE Kvt/2024-25Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://tendersutl.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
HDPE Pipes: Cost for welding as to make lengths totaling to the estimated quantity including of welding of stub ends, rate should include transport of welding machine, manpower, related logistic support at project site, etc. as per specifications
360
-
-
... More
HDPE Pipes: Cost of Hydro test as per specifications
1
-
-
... More
Fabrication / procurement, testing of Flexible Hoses as per specifications
1
-
-
... More
Supply of 2" (8m) stud link Chains as per specification
1
-
-
... More
Supply of 2" (2m) stud link Chains per specification
14
-
-
... More
Supply of 6.5 T Bow Shackles as per specification
5
-
-
... More
Supply of 9.5 T Bow Shackles as per specification
5
-
-
... More
Supply of 13.5 T Bow Shackles as per specification
5
-
-
... More
Supply of 17 T Bow Shackles as per specification
15
-
-
... More
Supply of 25 T Bow Shackles as per specification
60
-
-
... More
Supply of 50T End Rings as per specification
5
-
-
... More
Supply of Anchor as per specification mentioned
1
-
-
... More
Fabrication and Supply of clamps as per specification
1
-
-
... More
Fabrication and Supply of Clump weights (5T 4nos) as per specification
1
-
-
... More
Fabrication and Supply of Holdfasts as per specification
1
-
-
... More
Fabrication and Supply of Radial Pin with inner sleeve Assembly per specification
1
-
-
... More
Fabrication and Supply of stub pieces and reducers as per specification
1
-
-
... More
Fabrication and Supply of steel pipes as per specification
1
-
-
... More
Fabrication and Supply of hook flanges, loose flanges, back up flanges, etc., as per specification
1
-
-
... More
Transportation of items in S.No. 6 to 22, up to the Island Site
1
-
-
... More
Assembly, layout, and sea fastening for Clamps as per specification (including the cost of bolts as per specification)
1
-
-
... More
Assembly, layout, and sea fastening of Clumps per specification, for deep water pipe end as per requirements (including the cost of bolts as per specification)
1
-
-
... More
Assembly, layout, and sea fastening of Hold fast as per specification (including the cost of bolts as per specification)
1
-
-
... More
Assembly, layout, and sea fastening of Radial Pin Assembly asper specification (including the cost of bolts as per specification)
1
-
-
... More
Assembly, layout, sea fastening, and Deployment for Stub Pieces and Reducers asper specification (including the cost of bolts as per specification)
1
-
-
... More
Assembly, layout, sea fastening, and Deployment for Flexible Hose (length of each hose: 5m) (including the cost of bolts as per specification)
1
-
-
... More
Assembly, layout, sea fastening, and Deployment for Steel pipes (including the cost of bolts as per specification)
1
-
-
... More
Removal of shallow water portion of the existing pipe,Towing the assembled pipe, and deployment of HDPE pipe line, connecting to the shore and lowering of the rear end, and completion of all the sea fastening of the pipeline by securing it with the anchor blocks on shore and sea, placing of anchor blocks on pipe, and as per specification
1
-
-
... More
Providing and laying of concrete blocks of (~20T, 2nos) to be used as anchor at Shore. Providing and laying of concrete blocks (~2.5T& ~0.3T, 10nos each) to be used for stability of cold water pipe in shallow waters.
40
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements