Public Works Department Tender
View complete overview of Lakshadweep PWD Tender
Public Works Department - PWD Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date9 Jan 2024
Closing Date29 Jan 2024
Tender AmountRefer Documents
Costs
EMD
₹ 3,74,217Document Cost
₹ 1,500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UTL_2498_1Bid Award Id
ViewTender No
NIT No. 47/NIT/EE Kvt/2023-24Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://pwd.utl.gov.in/services.html
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Centring and shuttering including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
201
-
-
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. Inclusing treatment of steel with fusion bonded epoxy coating not less than 175micron thickness and upto 300micron to reinforcement bars of any diameter as per IS 13620-1993 ASTM-775M
3800
-
-
Hydro test as per specifications
1
-
-
Fabrication / procurement, testing, supply and transportation of Flexible Hoses as per specifications and drawing
2
-
-
Procurment, Supply of 6.5 T Bow Shackles required for securing as per specification
10
-
-
Procurment, Supply of 9.5 T Bow Shackles required for securing as per specification
10
-
-
Procurment, Supply of 13.5 T Bow Shackles required for securing as per specification
10
-
-
Procurment, Supply of 17 T Bow Shackles required for securing as per specification
10
-
-
Supply of MS clamps as per drawing / specification
12
-
-
Fabrication, Supply and transportation of Holdfasts and inner sleeve assembly as per drawing
2
-
-
Fabrication, supply and transportation of shock cell reducers as per specification and drawing
1
-
-
Fabrication, supply and transportation for steel pipes as per specification - 36 mtrs in 6 mtrs length and drawing
1
-
-
Fabrication, supply and transportation of flanges for MS pipes as per specification (840mm Dia) and drawing
10
-
-
Fabrication, supply and transportation of back up flanges for HDPE pipes as per specification (840mm Dia) and drawing
6
-
-
Supply and transportation of 10.9 grade high tensile fasteners of different sizes and lengths for the entire assembly.
1
-
-
Supply and transportation of 60 % neoprene rubber sheet for all the flange joints, holdfast assembly and steel clamps as per the specification.
1
-
-
Assembly and installation of components like holdfast, inner sleeve, steel clamps, Flexible hose, HDPE piping and shock cell reducer.
1
-
-
Dismantling of the existing steel pipeline and shifting to a safe location and securing it.
1
-
-
Clearing and levelling of the site to ensure there are no hindrances in the form of rock outcrops which will damage the HDPE pipeline.
1
-
-
Underwater survey of the site after clearing and levelling and submission of video for the same.
1
-
-
Fabrication of MS piping /bends as per site conditions and make connections with sump and HDPE pipe
1
-
-
Underwater survey of the site after installation of the new pipeline and submission of video for the same.
1
-
-
Mobilization and demobilisation of marine spread required for the entire work.
1
-
-