National Institute Of Ocean Technology Tender

View complete overview of Lakshadweep NIOT Tender

National Institute Of Ocean Technology - NIOT Tender

Eprocure
Opening Date17 Oct 2019
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Establishment and Comprehensive Operation and Maintenance of Ocean Thermal Energy Conversion OTEC powered desalination plant of 100 m3/day capacity with components of process equipment such as turbine, tunneling and submarine HDPE pipe at Kavaratti Isla
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Possible methodologies-1

-

-

-

... More
Tunnel and sumps

-

-

-

... More
Mobilization and De-mobilization of marine spread as per specification mentioned in Section 4, of this document

1

-

-

... More
Micro tunneling: Construction of tunnel to required length (200 x 3nos = 600.)and diameter, RCC casing and 3 mm HDPE lining inside tunnel and ensuring water tightness as per specification

600

-

-

... More
End connection of the tunnel with the sump / intake structure

1

-

-

... More
Testing of three tunnels for leak proofness

1

-

-

... More
Earth work in excavation by mechanical means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sq.m on plan) including dewatering, disposal of excavated earth, lead up to 50 m and lift upto 1.5 m, disposed earth to be levelled and neatly dressed. (All kinds of soil and bedrock) for all the sumps.

2400

-

-

... More
Support system for the sides of excavation to avoid subsidence for all the sumps.

1

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for all the three seawater sumps for Foundations, footings, bases of columns, etc. for mass concrete for all the sumps.

200

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for all the three seawater sumps for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc for all the sumps.

1400

-

-

... More
Providing and laying in position plain cement concrete of 100 mm specified grade excluding the cost of centering and shuttering. All works upto plinth level : 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)

250

-

-

... More
Steel Reinforcement for R.C.C. works including straightening, cutting, bending, tying, placing in position and binding all complete. Fe500D (CRS) Thermo-Mechanically Treated bars for construction of all the sumps

100

-

-

... More
Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of specified grade for reinforced cement concrete structural elements, excluding the cost of Centering, shuttering, finishing and reinforcement. Including Admixtures in recommended proportions. (as per IS 9103) to accelerate, retard setting of concrete improve workability without impairing strength and durability as per direction of Engineer-in-charge: Providing M-35 grade R.C.C. for construction of all the sumps.

800

-

-

... More
Leak proofing of the structure by use of water proof membranes/water bars of standard brands for all the sumps.

1

-

-

... More
15 mm cement plaster on rough side of wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand)

1400

-

-

... More
Supporting components for mounting all pumps and accessories.

1

-

-

... More
Supply of the SS316L fixed screens with Guide rails, jib crane and associated components each for warm and cold water sump to project site, erection and installation at site.

1

-

-

... More
Onshore Plant Building

-

-

-

... More
Earth work in excavation onshore by mechanical means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sq.m on plan) including dewatering, disposal of excavated earth, lead up to 50 m and lift upto 1.5 m, disposed earth to be levelled and neatly dressed. (All kinds of soil and bedrock)

900

-

-

... More
Support system for the sides of excavation to avoid subsidence.

1

-

-

... More
Providing and laying in position plain cement concrete of 100 mm specified grade excluding the cost of centering and shuttering. All works upto plinth level : 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size).

400

-

-

... More
Providing and laying in position machine batched and machine mixed design mix M-35 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note:- Cement content considered in as per design mix is payable/recoverable separately).this item is @ 330 kg/cum.“Excess/ less cement used for construction of onshore plant building. All works upto floor VI level

900

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for suspended floors, roofs, landings, balconies and access platform

1100

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for lintels, beams, plinth beams, girders, bressumers and cantilevers

1300

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for columns(including footings), pillars, piers, abutments, posts and struts

1100

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for stairs (Excluding landing) except spiral staircases

125

-

-

... More
Steel Reinforcement for R.C.C. works including straightening, cutting, bending, placing in position and binding all complete. Fe500D (CRS) Thermo-Mechanically Treated bars. For construction of plant building.

120

-

-

... More
Providing and laying anti skid tiles ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1Cement : 4 Coarse sand), including pointing the joints with white cement and matching pigment etc., complete. for an area of 300 m2

1

-

-

... More
Doors, windows as required for office, water closet, store room, control room (Including Electrical insulated flooring for control room).

5

-

-

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor VI level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand)

1050

-

-

... More
15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix : 1:3 (1 cement: 3 fine sand).

6000

-

-

... More
Painting with synthetic enamel paint, having VOC (Volatile Organic Compound) content less than 150 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour.(Two Coats)

6000

-

-

... More
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.

500

-

-

... More
Providing W.C, washbasin and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete. 40 mm dia

1

-

-

... More
Providing and fixing on wall face unplasticised - PVC moulded fittings/accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10mm gap for thermal expansion

1

-

-

... More
Providing and fixing stainless steel ( Grade 316) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.).

3000

-

-

... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

10000

-

-

... More
Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.water proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours.

1

-

-

... More
Any other onshore related works (To be specified alongwith technical bid) This item will be admitted based on actual execution as per details provided.The detailed break up should be submitted in a sealed cover which will be opened alongwith the price bid

1

-

-

... More
Any other offshore related works (To be specified alongwith technical bid) This item will be admitted based on actual execution as per details provided.The detailed break up should be submitted in a sealed cover which will be opened alongwith the price bid.

1

-

-

... More
Possible methodologies-2

-

-

-

... More
Trenching works

-

-

-

... More
All excavation works of the trench from -1m level w.r.t CD in offshore upto the onshore sump(s).

100

-

-

... More
All backfilling works of the trench from -1m level w.r.t CD in offshore upto the onshore sump(s).

100

-

-

... More
Support system for the sides of excavation to avoid subsidence and bed preparation for pipe laying

1

-

-

... More
Onshore sump

-

-

-

... More
Earth work in excavation by mechanical means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sq.m on plan) including dewatering, disposal of excavated earth, lead up to 50 m and lift upto 1.5 m, disposed earth to be levelled and neatly dressed.(All kinds of soil and bedrock) for all the three seawater sumps

2400

-

-

... More
Support system for the sides of excavation to avoid subsidence for all the sump(s).

1

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for all the three seawater sumps for Foundations, footings, bases of columns, etc. for mass concrete for all the sump(s).

200

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for all the three seawater sumps for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc for all the sump(s).

1400

-

-

... More
Providing and laying in position plain cement concrete of 100 mm specified grade excluding the cost of centering and shuttering. All works upto plinth level : 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)

250

-

-

... More
Steel Reinforcement for R.C.C. works including straightening, cutting, bending, tying, placing in position and binding all complete. Fe500D (CRS) Thermo-Mechanically Treated bars for construction of all the sump(s).

100

-

-

... More
Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of specified grade for reinforced cement concrete structural elements, excluding the cost of Centering, shuttering, finishing and reinforcement. Including Admixtures in recommended proportions. (as per IS 9103) to accelerate, retard setting of concrete improve workability without impairing strength and durability as per direction of Engineer-in-charge: Providing M-35 grade R.C.C. for construction of all the sump(s).

800

-

-

... More
Leak proofing of the structure by use of water proof membranes/water bars of standard brands for all the sump(s).

1

-

-

... More
15 mm cement plaster on rough side of wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand)

1400

-

-

... More
Supporting components for mounting all pumps and accessories.

1

-

-

... More
Supply of the SS316L fixed screens with Guide rails, jib crane and associated components each for warm and cold water sump to project site, erection and installation at site.

1

-

-

... More
Onshore Plant Building

-

-

-

... More
Earth work in excavation onshore by mechanical means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sq.m on plan) including dewatering, disposal of excavated earth, lead up to 50 m and lift upto 1.5 m, disposed earth to be levelled and neatly dressed. (All kinds of soil and bedrock)

900

-

-

... More
Support system for the sides of excavation to avoid subsidence.

1

-

-

... More
Providing and laying in position plain cement concrete of 100 mm specified grade excluding the cost of centering and shuttering. All works upto plinth level : 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) and DPC above plinth beam

400

-

-

... More
Providing and laying in position machine batched and machine mixed design mix M35 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note:- Cement content considered in as per design mix is payable/recoverable separately).this item is @ 330 kg/cum.“Excess/ less cement used For construction of plant building. All works upto floor VI level

900

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for suspended floors, roofs, landings, balconies and access platform

1100

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for lintels, beams, plinth beams, girders, bressumers and cantilevers

1300

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for columns(including footings), pillars, piers, abutments, posts and struts

1100

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for stairs (Excluding landing) except spiral staircases

125

-

-

... More
Steel Reinforcement for R.C.C. works including straightening, cutting, bending, placing in position and binding all complete. Fe500D (CRS) Thermo-Mechanically Treated bars. For construction of plant building.

120

-

-

... More
Providing and laying anti skid tiles ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1Cement : 4 Coarse sand), including pointing the joints with white cement and matching pigment etc., complete. for an area of 300 m2

1

-

-

... More
Doors, windows as required for office, water closet, store room, control room (Including Electrical insulated flooring for control room).

5

-

-

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor VI level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand)

1050

-

-

... More
15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix : 1:3 (1 cement: 3 fine sand).

6000

-

-

... More
Painting with synthetic enamel paint, having VOC (Volatile Organic Compound) content less than 150 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour.(Two Coats)

6000

-

-

... More
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.

500

-

-

... More
Providing W.C, washbasin and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete. 40 mm dia

1

-

-

... More
Providing and fixing on wall face unplasticised - PVC moulded fittings/accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10mm gap for thermal expansion

1

-

-

... More
Providing and fixing stainless steel ( Grade 316) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.).

3000

-

-

... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

10000

-

-

... More
Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.water proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours.

1

-

-

... More
Any other onshore related works (To be specified alongwith technical bid) This item will be admitted based on actual execution as per details provided.The detailed break up should be submitted in a sealed cover which will be opened along the price bid.

1

-

-

... More
Any other offshore related works (To be specified alongwith technical bid) This item will be admitted based on actual execution as per details provided.The detailed break up should be submitted in a sealed cover which will be opened along the price bid.

1

-

-

... More
Possible methodologies-3a

-

-

-

... More
Trenching works

-

-

-

... More
All excavation works of the trench from -1m level w.r.t CD in offshore upto the onshore sump(s).

70

-

-

... More
All backfilling works of the trench from -1m level w.r.t CD in offshore upto the onshore sump(s).

70

-

-

... More
Support system for the sides of excavation to avoid subsidence and bed preparation for pipe laying

1

-

-

... More
Offshore sump

-

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for the offshore sump for Foundations, footings, bases of columns, etc. for mass concrete for all the sump(s).

50

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for the offshore sump for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc for all the sump(s).

850

-

-

... More
Providing and laying in position plain cement concrete of 100 mm specified grade excluding the cost of centering and shuttering. All works upto plinth level : 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)

150

-

-

... More
Steel Reinforcement for R.C.C. works including straightening, cutting, bending, tying, placing in position and binding all complete. Fe500D (CRS) Thermo-Mechanically Treated bars for construction of all the sump(s).

40

-

-

... More
Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of specified grade for reinforced cement concrete structural elements, excluding the cost of Centering, shuttering, finishing and reinforcement. Including Admixtures in recommended proportions. (as per IS 9103) to accelerate, retard setting of concrete improve workability without impairing strength and durability as per direction of Engineer-in-charge: Providing M-35 grade R.C.C. for construction of all the sump(s).

260

-

-

... More
Leak proofing of the structure by use of water proof membranes/water bars of standard brands for all the sump(s).

1

-

-

... More
15 mm cement plaster on rough side of wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand)

500

-

-

... More
Supporting components for mounting all pumps and accessories.

1

-

-

... More
Supply of the SS316L fixed screens with Guide rails, jib crane and associated components each for warm and cold water sump to project site, erection and installation at site.

1

-

-

... More
All other offshore activities such as installation of the sump (Including all direct or indirect work, equipment, manpower, accessories , mobilization, demobilization etc.)

1

-

-

... More
All Levelling works of seabed as required for installation of sumps and other related offshore works such as rock anchoring (Including all direct or indirect work, equipment, manpower, accessories etc. )

1

-

-

... More
Offshore plant building

-

-

-

... More
All Excavation works of seabed for construction/installation of sump as required including all direct or indirect work, equipment, manpower, accessories etc.

1

-

-

... More
All Levelling works of seabed for offshore plant building footings as required including all direct or indirect work, equipment, manpower, accessories etc.

1

-

-

... More
Providing and laying in position plain cement concrete(underwater concreteing) of 100 mm specified grade excluding the cost of centering and shuttering. All works upto plinth level : 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)

400

-

-

... More
Providing and laying in position machine batched and machine mixed design mix M-35 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note:- Cement content considered in as per design mix is payable/recoverable separately).this item is @ 330 kg/cum.“Excess/ less cement used For construction of plant building. All works upto floor VI level

600

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for suspended floors, roofs, landings, balconies and access platform

650

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for lintels, beams, plinth beams, girders, bressumers and cantilevers

800

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for columns(including footings), pillars, piers, abutments, posts and struts

600

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for stairs (Excluding landing) except spiral staircases

125

-

-

... More
Steel Reinforcement for R.C.C. works including straightening, cutting, bending, placing in position and binding all complete. Fe 500D (CRS) Thermo-Mechanically Treated bars. For construction of plant building.

75

-

-

... More
Providing and laying anti skid tiles ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1Cement : 4 Coarse sand), including pointing the joints with white cement and matching pigment etc., complete. for an area of 300 m2

1

-

-

... More
Doors, windows as required for office, water closet, store room, control room (Including Electrical insulated flooring for control room).

5

-

-

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor VI level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand)

400

-

-

... More
15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix : 1:3 (1 cement: 3 fine sand).

3600

-

-

... More
Painting with synthetic enamel paint, having VOC (Volatile Organic Compound) content less than 150 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour.(Two Coats)

3600

-

-

... More
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.

200

-

-

... More
Providing W.C, washbasin and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete. 40 mm dia

1

-

-

... More
Providing and fixing on wall face unplasticised - PVC moulded fittings/accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10mm gap for thermal expansion

1

-

-

... More
Providing and fixing stainless steel ( Grade 316) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.).

3000

-

-

... More
Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.water proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours.

1

-

-

... More
Cost for offshore works/activites such as rock anchoring etc.(Including all all direct or indirect work, equipment, manpower, accessories , mobilization, demobilization etc.)

1

-

-

... More
Bridge - From shore to 0 m level w.r.t CD

-

-

-

... More
Support system for the sides of excavation to avoid subsidence. (For cast in-situ footings only)

1

-

-

... More
All Levelling works of seabed as required for installation of footings (Including all dierct or indirect work, equipment, manpower, accessories etc.)

1

-

-

... More
Providing and laying in position machine batched and machine mixed design mix M35 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note:- Cement content considered in as per design mix is payable/recoverable separately).this item is @ 330 kg/cum.“Excess/ less cement used for construction of bridge.

250

-

-

... More
Steel Reinforcement for R.C.C. works including straightening, cutting, bending, placing in position and binding all complete. Fe 500D (CRS) Thermo-Mechanically Treated bars for construction of bridge.

60

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for suspended floors, roofs, landings, balconies and access platform

110

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for lintels, beams, plinth beams, girders, bressumers and cantilevers

400

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for columns (including footings), pillars, piers, abutments, posts and struts

200

-

-

... More
Cost for RCC guard rails on both sides of the bridge deck

1

-

-

... More
Cost for offshore works/activites such as rock anchoring ,underwater concreting etc. (Including all direct or indirect work,equipment,manpower, accessories , mobilization, demobilization etc.)

1

-

-

... More
Any other onshore related works (To be specified alongwith technical bid) This item will be admitted based on actual execution as per details provided.The detailed break up should be submitted in a sealed cover which will be opened alongwith the price bid

1

-

-

... More
Any other offshore related works (To be specified alongwith technical bid) This item will be admitted based on actual execution as per details provided.The detailed break up should be submitted in a sealed cover which will be opened alongwith the price bid.

1

-

-

... More
Possible methodologies-3b

-

-

-

... More
Trenching works for pipes

-

-

-

... More
All excavation works of the trench from offshore upto the sump(s).

30

-

-

... More
All backfilling works of the trench from offshore upto the sump(s).

30

-

-

... More
Support system for the sides of excavation to avoid subsidence

1

-

-

... More
All works related to bed preparation for pipe laying

1

-

-

... More
Offshore plant building on sump

-

-

-

... More
All Excavation of seabed for construction/installation of sump as required including all direct or indirect work, equipment, manpower, accessories etc.

1

-

-

... More
All Levelling works of seabed for offshore plant building footings/foundations as required including all direct or indirect work, equipment, manpower, accessories etc.

1

-

-

... More
All other offshore activities such as Towing and installation of the sump (Including all direct or indirect work, equipment, manpower, accessories, mobilization, demobilization etc.)

1

-

-

... More
Providing and laying in position plain cement concrete (Underwater concreteing)of 100 mm specified grade excluding the cost of centering and shuttering. All works upto plinth level : 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)

200

-

-

... More
Providing and laying in position machine batched and machine mixed design mix M35 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note:- Cement content considered in as per design mix is payable/recoverable separately).this item is @ 330 kg/cum.“Excess/ less cement used For construction of plant building. All works upto floor VI level

1000

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for suspended floors, roofs, landings, balconies and access platform

1150

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for all the three seawater sumps for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc for all the sump(s).

1000

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for lintels, beams, plinth beams, girders, bressumers and cantilevers

1250

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for columns(including footings), pillars, piers, abutments, posts and struts

850

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for stairs (Excluding landing) except spiral staircases

125

-

-

... More
Steel Reinforcement for R.C.C. works including straightening, cutting, bending, placing in position and binding all complete. Fe 500D (CRS) Thermo-Mechanically Treated bars. For construction of plant building.

260

-

-

... More
Providing and laying anti skid tiles ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1Cement : 4 Coarse sand), including pointing the joints with white cement and matching pigment etc., complete. for an area of 300 m2

1

-

-

... More
Doors, windows as required for office, water closet, store room, control room (Including Electrical insulated flooring for control room

5

-

-

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor VI level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand)

600

-

-

... More
15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix : 1:3 (1 cement: 3 fine sand).

4200

-

-

... More
Painting with synthetic enamel paint, having VOC (Volatile Organic Compound) content less than 150 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour.(Two Coats)

4200

-

-

... More
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.

500

-

-

... More
Providing W.C, washbasin and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete. 40 mm dia

1

-

-

... More
Providing and fixing on wall face unplasticised - PVC moulded fittings/accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10mm gap for thermal expansion

1

-

-

... More
Providing and fixing stainless steel ( Grade 316) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.).

3000

-

-

... More
Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.water proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours.

1

-

-

... More
Cost for all other offshore works/activites such as rock anchoring etc.(Including all all direct or indirect work,equipment, manpower, accessories, mobilization, demobilization etc.

1

-

-

... More
Leak proofing of the structure by use of water proof membranes/water bars of standard brands for all the sump(s).

1

-

-

... More
Supporting components for mounting all pumps and accessories.

1

-

-

... More
Supply of the SS316L fixed screens with Guide rails and associated components each for warm and cold water sump to project site, erection and installation at site.

1

-

-

... More
Bridge - From shore to 0 m level w.r.t CD

-

-

-

... More
Support system for the sides of excavation to avoid subsidence. (For cast in-situ footings only)

1

-

-

... More
All Levelling works of seabed as required for installation of footings (Including all direct or indirect work,equipment, manpower, accessories etc.)

1

-

-

... More
Providing and laying in position machine batched and machine mixed design mix M35 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note:- Cement content considered in as per design mix is payable/recoverable separately).this item is @ 330 kg/cum.“Excess/ less cement used for construction of bridge.

250

-

-

... More
Steel Reinforcement for R.C.C. works including straightening, cutting, bending, placing in position and binding all complete. Fe 500D (CRS) Thermo-Mechanically Treated bars for construction of bridge.

60

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for suspended floors, roofs, landings, balconies and access platform

110

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for lintels, beams, plinth beams, girders, bressumers and cantilevers

400

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for columns (including footings), pillars, piers, abutments, posts and struts

200

-

-

... More
Cost for RCC guard rails on both sides of the bridge deck

1

-

-

... More
Cost for offshore works/activites such as rock anchoring ,underwater concreting etc. (Including all direct or indirect work, equipment, manpower, accessories, mobilization, demobilization etc.)

1

-

-

... More
Bridge - From 0 m level to -3m level w.r.t CD

-

-

-

... More
All Levelling works of seabed as required for installation of footings (Including all direct or indirect work,equipment, manpower, accessories etc.)

1

-

-

... More
Providing and laying in position machine batched and machine mixed design mix M35 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note:- Cement content considered in as per design mix is payable/recoverable separately).this item is @ 330 kg/cum.“Excess/ less cement used for construction of bridge.

550

-

-

... More
Steel Reinforcement for R.C.C. works including straightening, cutting, bending, placing in position and binding all complete. Fe 500D (CRS) Thermo-Mechanically Treated bars for construction of bridge.

110

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for suspended floors, roofs, landings, balconies and access platform

250

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for lintels, beams, plinth beams, girders, bressumers and cantilevers

800

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for columns (including footings), pillars, piers, abutments, posts and struts

400

-

-

... More
Cost for RCC guard rails on both sides of the bridge deck

1

-

-

... More
Cost for offshore works/activites such as rock anchoring ,underwater concreting etc. (Including all direct or indirect work,equipment, manpower, accessories, mobilization, demobilization etc.)

1

-

-

... More
Bridge - From -3m level to -5m level w.r.t CD

-

-

-

... More
All Levelling works of seabed as required for installation of footings (Including all direct or indirect work,equipment, manpower, accessories etc.)

1

-

-

... More
Providing and laying in position machine batched and machine mixed design mix M35 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note:- Cement content considered in as per design mix is payable/recoverable separately).this item is @ 330 kg/cum.“Excess/ less cement used for construction of bridge.

250

-

-

... More
Steel Reinforcement for R.C.C. works including straightening, cutting, bending, placing in position and binding all complete. Fe 500D (CRS) Thermo-Mechanically Treated bars for construction of bridge.

60

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for suspended floors, roofs, landings, balconies and access platform

110

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for lintels, beams, plinth beams, girders, bressumers and cantilevers

400

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for columns (including footings), pillars, piers, abutments, posts and struts

200

-

-

... More
Cost for RCC guard rails on both sides of the bridge deck

1

-

-

... More
Cost for offshore works/activites such as rock anchoring ,underwater concreting etc. (Including all direct or indirect work, equipment, manpower, accessories, mobilization, demobilization etc.)

1

-

-

... More
Any other onshore related works (To be specified alongwith technical bid) This item will be admitted based on actual execution as per details provided.The detailed break up should be submitted in a sealed cover which will be opened alongwith the price bid

1

-

-

... More
Any other offshore related works (To be specified alongwith technical bid) This item will be admitted based on actual execution as per details provided.The detailed break up should be submitted in a sealed cover which will be opened alongwith the price bid.

1

-

-

... More
Possible methodologies-4

-

-

-

... More
Trenching works

-

-

-

... More
All excavation works of the trench from -1m level w.r.t CD in offshore upto the onshore sump(s).

100

-

-

... More
All backfilling works of the trench from -1m level w.r.t CD in offshore upto the onshore sump(s).

100

-

-

... More
Support system for the sides of excavation to avoid subsidence and bed preparation for pipe laying

1

-

-

... More
Offshore sump

-

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for the offshore sump for Foundations, footings, bases of columns, etc. for mass concrete for all the sump(s).

1000

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for the offshore sump for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc for all the sump(s).

650

-

-

... More
Providing and laying in position plain cement concrete(underwater concreteing) of 100 mm specified grade excluding the cost of centering and shuttering. All works upto plinth level : 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)

200

-

-

... More
Steel Reinforcement for R.C.C. works including straightening, cutting, bending, tying, placing in position and binding all complete. Fe500D (CRS) Thermo-Mechanically Treated bars for construction of all the sump(s).

80

-

-

... More
Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of specified grade for reinforced cement concrete structural elements, excluding the cost of Centering, shuttering, finishing and reinforcement. Including Admixtures in recommended proportions. (as per IS 9103) to accelerate, retard setting of concrete improve workability without impairing strength and durability as per direction of Engineer-in-charge: Providing M-35 grade R.C.C. for construction of all the sump(s).

450

-

-

... More
Leak proofing of the structure by use of water proof membranes/water bars of standard brands for all the sump(s).

1

-

-

... More
15 mm cement plaster on rough side of wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand)

500

-

-

... More
Supporting components for mounting all pumps and accessories.

1

-

-

... More
Supply of the SS316L fixed screens with Guide rails, jib crane and associated components each for warm and cold water sump to project site, erection and installation at site..

1

-

-

... More
All other offshore activities such as Towing and installation of the sump (Including all direct o indirect work, equipment, manpower, accessories, mobilization, demobilization etc

1

-

-

... More
All Levelling works of seabed as required for installation of sumps and other related offshore works such as rock anchoring (Including all direct or indirect work, equipment, ,manpower, accessories etc.

1

-

-

... More
Onshore discharge sump

-

-

-

... More
Earth work in excavation by mechanical means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sq.m on plan) including dewatering, disposal of excavated earth, lead up to 50 m and lift upto 1.5 m, disposed earth to be levelled and neatly dressed. (All kinds of soil and bedrock) for all the sumps.

800

-

-

... More
Support system for the sides of excavation to avoid subsidence for all the sumps.

1

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for all the three seawater sumps for Foundations, footings, bases of columns, etc. for mass concrete for all the sumps.

50

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for all the three seawater sumps for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc for all the sumps.

450

-

-

... More
Providing and laying in position plain cement concrete of 100 mm specified grade excluding the cost of centering and shuttering. All works upto plinth level : 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)

75

-

-

... More
Steel Reinforcement for R.C.C. works including straightening, cutting, bending, tying, placing in position and binding all complete. Fe500D (CRS) Thermo-Mechanically Treated bars for construction of all the sumps

40

-

-

... More
Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of specified grade for reinforced cement concrete structural elements, excluding the cost of Centering, shuttering, finishing and reinforcement. Including Admixtures in recommended proportions. (as per IS 9103) to accelerate, retard setting of concrete improve workability without impairing strength and durability as per direction of Engineer-in-charge: Providing M-35 grade R.C.C. for construction of all the sumps.

270

-

-

... More
Leak proofing of the structure by use of water proof membranes/water bars of standard brands for all the sumps.

1

-

-

... More
15 mm cement plaster on rough side of wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand)

450

-

-

... More
Onshore Plant Building

-

-

-

... More
Earth work in excavation onshore by mechanical means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sq.m on plan) including dewatering, disposal of excavated earth, lead up to 50 m and lift upto 1.5 m, disposed earth to be levelled and neatly dressed. (All kinds of soil and bedrock)

900

-

-

... More
Support system for the sides of excavation to avoid subsidence.

1

-

-

... More
Providing and laying in position plain cement concrete of 100 mm specified grade excluding the cost of centering and shuttering. All works upto plinth level : 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) and DPC below plinth beam

400

-

-

... More
Providing and laying in position machine batched and machine mixed design mix M35 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note:- Cement content considered in as per design mix is payable/recoverable separately).this item is @ 330 kg/cum.“Excess/ less cement used For construction of plant building. All works upto floor VI level

900

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for suspended floors, roofs, landings, balconies and access platform

1100

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for lintels, beams, plinth beams, girders, bressumers and cantilevers

1300

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for columns(including footings), pillars, piers, abutments, posts and struts

1100

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for stairs (Excluding landing) except spiral staircases

125

-

-

... More
Steel Reinforcement for R.C.C. works including straightening, cutting, bending, placing in position and binding all complete. Fe 500D (CRS) Thermo-Mechanically Treated bars. For construction of plant building

120

-

-

... More
Providing and laying anti skid tiles ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1Cement : 4 Coarse sand), including pointing the joints with white cement and matching pigment etc., complete. for an area of 300 m2

1

-

-

... More
Doors, windows as required for office, water closet, store room, control room (Including Electrical insulated flooring for control room).

5

-

-

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor VI level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand)

1050

-

-

... More
15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix : 1:3 (1 cement: 3 fine sand).

6000

-

-

... More
Painting with synthetic enamel paint, having VOC (Volatile Organic Compound) content less than 150 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour.(Two Coats)

6000

-

-

... More
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.

500

-

-

... More
Providing W.C, washbasin and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete. 40 mm dia

1

-

-

... More
Providing and fixing on wall face unplasticised - PVC moulded fittings/accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10mm gap for thermal expansion

1

-

-

... More
Providing and fixing stainless steel ( Grade 316) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.).

3000

-

-

... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

10000

-

-

... More
Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.water proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours.

1

-

-

... More
Bridge - From shore to 0 m level w.r.t CD

-

-

-

... More
Support system for the sides of excavation to avoid subsidence. (For cast in-situ footings only)

1

-

-

... More
All Levelling works of seabed as required for installation of footings (Including all direct or indirect work,equipment, manpower, accessories etc.)

1

-

-

... More
Providing and laying in position machine batched and machine mixed design mix M35 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note:- Cement content considered in as per design mix is payable/recoverable separately).this item is @ 330 kg/cum.“Excess/ / less cement used for construction of bridge.

250

-

-

... More
Steel Reinforcement for R.C.C. works including straightening, cutting, bending, placing in position and binding all complete. Fe 500D (CRS) Thermo-Mechanically Treated bars for construction of bridge.

60

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for suspended floors, roofs, landings, balconies and access platform

110

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for lintels, beams, plinth beams, girders, bressumers and cantilevers

400

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for columns (including footings), pillars, piers, abutments, posts and struts

200

-

-

... More
Cost for RCC guard rails on both sides of the bridge deck

1

-

-

... More
Cost for all other offshore works/activites such as rock anchoring , underwater concreteing etc.(Including all direct and indirect work equipment, manpower, accessories, mobilization, demobilization etc.)

1

-

-

... More
Bridge - From 0 m level to -3m level w.r.t CD

-

-

-

... More
All Levelling works of seabed as required for installation of footings (Including all direct or indirect work,equipment, manpower, accessories etc.)

1

-

-

... More
Providing and laying in position machine batched and machine mixed design mix M35 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note:- Cement content considered in as per design mix is payable/recoverable separately).this item is @ 330 kg/cum.“Excess/ less cement used for construction of bridge.

550

-

-

... More
Steel Reinforcement for R.C.C. works including straightening, cutting, bending, placing in position and binding all complete. Fe 500D (CRS) Thermo-Mechanically Treated bars for construction of bridge.

100

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for suspended floors, roofs, landings, balconies and access platform

250

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for lintels, beams, plinth beams, girders, bressumers and cantilevers

800

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for columns (including footings), pillars, piers, abutments, posts and struts

400

-

-

... More
Cost for RCC guard rails on both sides of the bridge deck

1

-

-

... More
Cost for all other offshore works/activites such as rock anchoring , underwater concreting etc. (Including all direct or indirect work,equipment, manpower, accessories, mobilization, demobilization etc.)

1

-

-

... More
Bridge - From -3m level to -5m level w.r.t CD

-

-

-

... More
All Levelling works of seabed as required for installation of footings (Including all direct or indirect work,equipment, manpower, accessories etc.)

1

-

-

... More
Providing and laying in position machine batched and machine mixed design mix M-35 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note:- Cement content considered in as per design mix is payable/recoverable separately).this item is @ 330 kg/cum.“Excess/ less cement used for construction of bridge.

250

-

-

... More
Steel Reinforcement for R.C.C. works including straightening, cutting, bending, placing in position and binding all complete. Fe 500D (CRS) Thermo-Mechanically Treated bars for construction of bridge.

60

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for suspended floors, roofs, landings, balconies and access platform

110

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for lintels, beams, plinth beams, girders, bressumers and cantilevers

400

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights for columns (including footings), pillars, piers, abutments, posts and struts

200

-

-

... More
Cost for RCC guard rails on both sides of the bridge deck

1

-

-

... More
Cost for all other offshore works/activites such as rock anchoring ,underwater concreteing etc. (Including all direct or indirect work ,equipment, manpower, accessories, mobilization, demobilization etc.)

1

-

-

... More
Any other onshore related works (To be specified alongwith technical bid) This item will be admitted based on actual execution as per details provided.The detailed break up should be submitted in a sealed cover which will be opened alongwith the price bid. .

1

-

-

... More
Any other offshore related works (To be specified alongwith technical bid) This item will be admitted based on actual execution as per details provided.The detailed break up should be submitted in a sealed cover which will be opened alongwith the price bid.

1

-

-

... More
Cold water HDPE pipe line

-

-

-

... More
Supply of PE100 PN10 High Density Polyethylene Pipe as per specifications in Section 4.6. to project site at Kavaratti.

4100

-

-

... More
Cost for welding to the estimated quantity, rate should include transport of welding machine, manpower, related logistic support at project site, etc. as per the specification in section 4.6

4100

-

-

... More
Supply of stub ends for pipes as per Section 4.6 at project site.

30

-

-

... More
Cost of tests on HDPE pipe as specified in Section 4.6 of specifications at the designated site at Kavaratti

1

-

-

... More
Fabrication / procurement, testing of flexible hose, bellows, shock cell as explained in Section 4.6 and supply at the project site at Kavaratti

1

-

-

... More
Fabrication / procurement, testing of Chains as per Section 4.6 and supply at the project site at Kavaratti

110

-

-

... More
Supply of wire rope, minimum of 36mm dia as per Section 4.6 at the project site at Kavaratti

4000

-

-

... More
Fabrication / Construction of Anchor blocks, end clumpweight as explained in Section 4.6 and supply at the project site at Kavaratti

1

-

-

... More
Fabrication/procurement, testing, painting for Bow shackles, end rings, clamps, holdfasts as per specification mentioned in Section 4.6 and supply at the project site at Kavaratti

1

-

-

... More
Supply, testing, painting and sacrificial anodes for Steel /RCC weights as per specification mentioned in Section 4.6 and supply at the project site at Kavaratti

100

-

-

... More
Fabrication, testing, painting and sacrificial anodes for steel pipes as per specification mentioned in Section 4.6 of this document and supply at the project site at Kavaratti.

1

-

-

... More
Mobilization and De-mobilization of marine spread as per specification mentioned in Section 4.6 of this document

1

-

-

... More
supply , testing and installation of buoyancy modules at the project site at Kavaratti.

1

-

-

... More
Assembly, layout, and sea fastening of cold water pipe along with Clamps, clump weights,buoyancy modules, end rings, holdfast, flexible hose, bellows, steel pipe or any other joint, acoustic release, transponders, shockcell etc. towing the assembled pipe, and deployment of HDPE pipe line, connection to the tunnel, installation of anchor blocks at required locations and completion of all sea fastening of the pipeline by securing it with the anchor blocks on shore and sea, as per specification mentioned in Section 4.6

1

-

-

... More
Assembly, layout of discharge water pipe along with clump weights,buoyancy modules and deployment of HDPE pipe line at required locations as per specification mentioned in Section 4.6

1

-

-

... More
Supply of Acoustic Release 50 ton capacity to project site at Kavaratti.

1

-

-

... More
End connection of the cold water pipe with tunnel/sumps

1

-

-

... More
Supply of Transponder to project site at Kavaratti.

4

-

-

... More
Any other HDPE pipe related works (To be specified alongwith technical bid) This item will be admitted based on actual execution as per details provided.The detailed break up should be submitted in a sealed cover which will be opened alongwith the price bid

1

-

-

... More
Plant / Process Equipment

-

-

-

... More
Fabrication, FAT,supply to project site at Kavaratti of Flash chamber cum deaerator and all its allied components as per specifications in Section 4.3.1

1

-

-

... More
Erection, commissioning and testing of Flash chamber cum deaerator and all its allied components at site as per specifications in Section 4.3.1

1

-

-

... More
Fabrication, FAT,supply to project site at Kavaratti of condenser and all associated components as per Section 4.3.2

1

-

-

... More
Erection, commissioning and testing of condenser and all its allied components at site as per specifications in Section 4.3.2

1

-

-

... More
Fabrication, FAT,supply to project site at Kavaratti of turbine-generator unit and its allied components as per specifications in Section 4.4

1

-

-

... More
Erecting, commissioning and testing of turbine-generator unit and its allied components at site as per specifications in Section 4.4

1

-

-

... More
FAT , supply of warm seawater pumps with all allied accessories to project site, erection, commissioning and testing at site as per Section 4.3.3

2

-

-

... More
FAT , supply of cold seawater pumps with all allied accessories to project site, erection, commissioning and testing at site as per Section 4.3.3

2

-

-

... More
FAT , supply of fresh water pumps with all allied accessories to project site, erection, commissioning and testing at site as per Section 4.3.3

2

-

-

... More
FAT , supply of Main vacuum system with all allied accessories like seal liquid separator tank, pumps, intermediate condenser etc. to project site, erection, commissioning and testing at site as per Section 4.3.4

2

-

-

... More
FAT , supply of deaerator vacuum system with all allied accessories like seal liquid separator tank, pumps etc. to project site, erection, commissioning and testing at site as per Section 4.3.4

2

-

-

... More
Fabrication and supply of elbows,expanders,branch pipes and common headers in Cold sea water pump and warm sea water pump delivery ports with mating end flanges(Mild steel) as per section 4.3.5

1

-

-

... More
Supply to project site, butt fusion welding,erection, commissioning and testing at site of OD 800 ( PE100, PN6) HDPE plant piping (from sea wter pumps common headers to plant, within the plant and from plant to the mixed water discharge sump), and associated fittings such as stubs, elbows, reducers, expanders, T-joints and back up Mild steel loose flanges etc. as per section.4.3.5

1

-

-

... More
Supply to project site, butt fusion welding,erection, commissioning and testing at site of OD200&OD63 (PE100, PN10) HDPE plant piping for vacuum lines( from condenser to DCC to main vacuum system ,condenser to fresh water pump) and water lines(fresh water delivery & DCC's cold sea water pumping circuit) with associated fittings such as stubs, elbows, reducers, expanders,T-joints and back up Mild steel loose flanges etc. as per section.4.3.5

1

-

-

... More
Fabrication and supply of vapour duct & vapour bypass line piping and fittings(MOC- SS316L) to project site, erection, commissioning and testing at site as per Section 4.3.5

1

-

-

... More
FAT , supply of Direct Contact Condenser(DCC) (MOC-SS 316L) with all allied accessories like cold sea water pumps etc.to project site, erection, commissioning and testing at site as per Section 4.3.7

1

-

-

... More
FAT , supply of intermediate colloction tank for fresh water(MOC-SS316L) with piping connections etc.to project site, erection, commissioning and testing at site as per Section 4.3.5

1

-

-

... More
Supply of remineralization system with all allied accessories to project site, erection, commissioning and testing at site as per Section 4.3.8

1

-

-

... More
FAT and supply of SS motorized Butterfly valves in cold and warm sea water pumps delivery lines and in condenser's discharge line to project site, erection, commissioning and Testing at site as per section.4

5

-

-

... More
FAT and supply of SS motorized Butterfly valves in vapour duct and bypass arrangement piping to project site, erection, commissioning and Testing at site as per section.4.3.5

1

-

-

... More
Supply of SS butterfly valves(wafer type) in plant vacuum piping to project site, erection, commissioning and testing at site as per section.4.3.5

1

-

-

... More
Supply of SS ball valves & Non return valves (flanged ended) of appropriate size to project site, erection, commissioning and testing at site as per section.4.3.5

1

-

-

... More
Supply of PP valves(flanged ended) of appropriate size to project site, erection, commissioning and testing at site as per section.4.3.5

1

-

-

... More
Supply of SS 316 L grade A4 fasteners for all piping connections in warm sea water, cold sea water,fresh water and vacuum piping for the entire plant as per section 4

1

-

-

... More
Supply of suitable Rubber Bellows for warm, cold seawater lines and vacuum lines to project site, erection, commissioning and testing at site as per section 4.3.5

6

-

-

... More
Cost of thermal insulation in steel cold water piping at project site as per section 4.3.5

1

-

-

... More
Cost of painting for all the plant process component at project site as per section 4.3.5.8

1

-

-

... More
Any other process related component/ work (To be specified alongwith technical bid) This item will be admitted based on actual execution as per details provided.The detailed break up should be submitted in a sealed cover which will be opened along with the price bid.

1

-

-

... More
Electrical and instrumentation

-

-

-

... More
Supply of synchronisation And Load Management Panel and its sub systems, , Power loading device, PMCC panels, Power transformer & auxiliaries as per section 4.7 to project site, erection, commissioning and testing at site.

1

-

-

... More
Supply and installation of power cables, earthing, emergency power system, works associated to illumination and domestic loads as per section 4.7 to project site.

1

-

-

... More
Supply of process transmitters and implementation of measurement plan as per section 4.8 to project site.

1

-

-

... More
Supply of PLC based Supervisory Control And Data Acquisition (SCADA) System as per section 4.8 to project site.

1

-

-

... More
Supply and installation of Instrumentation cable, earthing as per section 4.8 to project site.

1

-

-

... More
Any other electrical and instrumentation work (To be specified alongwith technical bid) This item will be admitted based on actual execution as per details provided.The detailed break up should be submitted in a sealed cover which will be opened alongwith the price bid

1

-

-

... More
Detailed Engineering

-

-

-

... More
Detailed design and Engineering for entire project including civil structures, cold water pipeline , process equipment ,turbine-generator unit and electrical and instrumentation systems with design document and fabrication/construction drawings.

1

-

-

... More
Performance and commissioning trials

-

-

-

... More
Performance and commissioning trials of said quality, quantity and less power consumption of all the plant components than power generation from turbine power modules

1

-

-

... More
All risk Insurance to be covered till completion of 2 year O&M

1

-

-

... More
Third Party Inspection

-

-

-

... More
Cost for Third Party Inspection for Mechanical & Process components such as flash chamber, condenser, pumps, vacuum system, etc. including erection and commissioning

1

-

-

... More
Cost for Third Party Inspection for turbine-generator unit and control including erection and commissioning.

1

-

-

... More
TOTAL Amount without GST (Sl. No. 1.01 to 4.36)

1

-

-

... More
Operation and Maintenance (including spares and manpower necessary for break free operation of plant)

-

-

-

... More
Cost for Comprehensive Operation and Maintenance as per clause no 4.13 of NIT in First Year without GST

1

-

-

... More
Cost for Comprehensive Operation and Maintenance as per clause no 4.13 of NIT in Second Year without GST

1

-

-

... More
TOTAL Amount without GST ( for Sl. No. 4.39 TO 4.40)

1

-

-

... More
Goods and Service Tax

-

-

-

... More
Goods and Service Tax for all above Sl.No. 1.01 to 4.33 except for Sl. No. 4.35,4.36 , 4.39 and 4.40

1

-

-

... More
Goods and Service Tax for Comprehensive Operation & Maintenance and Third party inspection (for Sl. No. 4.35,4.36 , 4.39 and 4.40)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.